參考文獻 |
[1] L. Aye, T. Ngo, R. H. Crawford, R. Gammampila and P. Mendis, “Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules” Energy and Buildings, In Press, Accepted Manuscript, Available online 9 December 2011. doi:10.1016/j.enbuild.2011.11.049
[2] A. Baldwin, C. S. Poon, L. Y. Shen, S. Austin and I. Wong, “Designing out waste in high-rise residential buildings: Analysis of precasting methods and traditional construction”, Renewable Energy, Vol. 34, No. 9, pp. 2067-2073, 2009.
[3] E. M. L. Beale and J. A. Tomlin, “Special facilities in a general mathematical programming system for non-convex problems using ordered sets of variables. Proceedings of the fifth international conference on operational research.” London: Tavistock Publications, 1970:447-54.
[4] J. Buck and D. Young, “The potential for energy efficiency gains in the Canadian commercial building sector: a stochastic frontier study.” Energy, Vol.32, No.9, pp.1769-80, 2007.
[5] Y. Chen, G. E. Okudan and D. R. Riley, “Sustainable performance criteria for construction method selection in concrete buildings”, Automation in Construction, Vol. 19, No. 2, pp. 235-244, 2010.
[6] R. S. Chen and J. Z. Shyu, “Selecting a weapon system using zero-one goal programming and analytic network process”, Journal of Information and Optimization Sciences, Vol. 27, No. 2, pp. 379-399, 2006.
[7] S. H. Chung, A. H. I. Lee and W. L. Pearn, “Analytic network process (ANP) approach for product mix planning in semiconductor fabricator”, International Journal of Production Economics, Vol. 96, pp. 15-36, 2005.
[8] A. Czajkowski and S. Jones, “Selecting interrelated R&D projects in space technology planning”, IEEE Transactions on Engineering Management, Vol. 33, pp. 17-24, 1986.
[9] G. K. C. Ding, “Sustainable construction-the role of environmental assessment tools”, Journal of Environmental Management, Vol. 86, No. 3, pp. 451-464, 2008.
[10] C. M. Eastman and R. Sacks, “Relative productivity in the AEC industries in the United States for on-site and off-site activities”, Journal of Construction Engineering and Management, Vol. 134, No. 7, pp. 517-526, 2008.
[11] Y.P. Fang and Y. Zeng, “Balancing energy and environment: the effect and perspective of management instruments in China.” Energy , Vol.32, No.12, pp.2247-61, 2007.
[12] L. Gustavsson, A. Joelsson and R. Sathre, “Life cycle primary energy use and carbon emission of an eight-storey wood-framed apartment building”, Energy and Buildings, Vol. 42, No. 2, pp. 230-242, 2010.
[13] P. Guthrie and H. Mallett, Waste Minimization and Recycling in Construction-A Review, CIRIA Special Publication 122. CIRIA, London, UK, 1995.
[14] A. González, J. M. Sala, I. Flores and L. M. López, “Application of thermo economics to the allocation of environmental loads in the life cycle assessment of cogeneration plants.” Energy, Vol.28, No.6, pp.557-74, 2003.
[15] B. P. Herber and J. T. Raga, “An international carbon tax to combat global warming: an economic and political analysis of the European Union proposal.” American Journal of Economic and Sociology, Vol.54, No.3, pp.257-67, 1995.
[16] Z. Hu, P. Tan, X. Yan and D. Lou, “Life cycle energy, environment, and economic assessment of soybean-based biodiesel as an alternative automotive fuel in China.” Energy, Vol.33, No.11, pp.1654-8, 2008.
[17] K. Hoinka and A. Ziębik, “Mathematical model for the choice of an energy management structure of complex buildings.” Energy, Vol.35, No.2, pp.1146-1156, 2010.
[18] Y. Itoh and T. Kitagawa, “Using CO2 emission quantities in bridge lifecycle analysis.” Engineering Structures, Vol.25, No.5, pp.565-77, 2003.
[19] L. Jaillon, C. S. Poon and Y. H. Chiang, “Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong”, Waste Management, Vol. 29, No. 1, pp. 309-320, 2009.
[20] J. King and E. Scherem, “Cost-benefit analysis in information system development and operation”, Computing Surveys, Vol. 10, pp. 20-34, 1978.
[21] S. Kubba, Green Construction Project Management and Cost Oversight, Burlington, MA: Architectural Press, 2010.
[22] J. Kneifel, “Life-cycle carbon and cost analysis of energy efficiency measures in new commercial buildings.” Energy and Buildings, Vol.42, No.3, pp.33-40, 2010.
[23] K. E. Larsen, F. Lattke, S. Ott and S. Winter, “Surveying and digital workflow in energy performance retrofit projects using prefabricated elements”, Automation in Construction, Vol. 20, No. 8, pp. 999-1011, 2011.
[24] J. W. Lee and S. H. Kim, “Using analytic network process and goal programming for interdependent information system project selection”, Computers and Operations Research, Vol. 27, pp. 367-382, 2000.
[25] C. F. Lee, S. J. Lin and C. Lewis, “Analysis of the impacts of combining carbon taxation and emission trading on different industry sectors.” Energy Policy, Vol.36, No.2, pp.722-9, 2008.
[26] J. Li and M. Colombier, “Managing carbon emissions in China through building energy efficiency.” Journal of Environmental Management, Vol.90, No.8, pp.2436-47, 2009.
[27] Y. H. Lin, C. C. Chiu and C. H. Tsai, “The study of applying ANP model to assess dispatching rules for wafer fabrication”, Expert Systems with Applications, Vol. 34, No. 3, pp. 2148-2163, 2008.
[28] W. Lu and H. Yuan, “Exploring critical success factors for waste management in construction projects of China”, Resources, Conservation and Recycling, Vol. 55, No. 2, pp. 201-208, 2010.
[29] G. E. Metcalf, “Corporate tax reform paying the bills with a carbon tax.” Public Finance Review, Vol.35, No.3, pp.440-59, 2007.
[30] M. Mathirajan and R. Ramanathan, “A (0–1) goal programming model for scheduling the tour of a marketing executive”, European Journal of Operational Research, Vol. 179, No. 2, pp. 554-566, 2007.
[31] T. Malmqvist, M. Glaumann, S. Scarpellini, I. Zabalza, A. Aranda, E. Llera and S. Díaz, “Life cycle assessment in buildings: the ENSLIC simplified method and guidelines.” Energy 2010; doi:10.1016/j.energy.2010.03.026
[32] J. Nässén, J. Holmberg, A. Wadeskog and M. Nyman, “Direct and indirect energy use and carbon emissions in the production phase of buildings: an input-output analysis”, Energy, Vol. 32, No. 9, pp.1593-1602, 2007.
[33] N. F. Pan, “Selecting an appropriate excavation construction method based on qualitative assessments”, Expert Systems with Applications, Vol.36, No.3, pp. 5481-5490, 2009.
[34] E. T. Penrose, The Theory of The Growth of The Firm, Oxford, UK: Basil Blackwell Publishers, 1959.
[35] C. S. Poon and L. Jaillon, A Guide for Minimizing Construction and Demolition Waste at the Design Stage, The Hong Kong Polytechnic University, Hong Kong, 2002.
[36] H. Radhi “On the optimal selection of wall cladding system to reduce direct and indirect CO2 emissions”, Energy, Vol. 35, No. 3, pp. 1412-1424, 2010.
[37] M. Raugei, S. Bargigli and S. Ulgiati, “Life cycle assessment and energy pay-back time of advanced photovoltaic modules: CdTe and CIS compared to poly-Si.” Energy, Vol.32, No.8, pp.1310-1318, 2007.
[38] D. Rai, B. Sodagar, R. Fieldson and X. Hu, “Assessment of CO2 emissions reduction in a distribution warehouse.” Energy 2010; doi:10.1016/j.energy.2010.05.006.
[39] B. Rolfsman, “CO2 emission consequences of energy measures in buildings.” Building and Environment, Vol.37, No.12, pp.1421-30, 2002.
[40] T. L. Saaty, Decision Making with Dependence and Feedback: The Analytic Network Process (2nd.), Pittsburgh: RWS Publications, 2001.
[41] T. L. Saaty, Decision Making with Dependence and Feedback: The Analytic Network Process (1nd.), Pittsbrugh, USA: RWS Publications, 1996.
[42] R. Sacks, C. M. Eastman and G. Lee, “Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry”, Journal of Construction Engineering and Management, Vol. 130, No. 2, pp. 206-215, 2004.
[43] R. Sathr and L. Gustavsson, “Effects of energy and carbon taxes on building material competitiveness”, Energy and Buildings, Vol. 39, No. 4, pp.488-494, 2007.
[44] M. Suzuki, T. Oka and K. Okada, “The estimation of energy consumption and CO2 emission due to housing construction in Japan.” Energy and Buildings, Vol.22, No.2, pp.165-169, 1995.
[45] A. Stoppato, “Life cycle assessment of photovoltaic electricity generation.” Energy, Vol.33, No.2, pp.224-232, 2008.
[46] C. M. Tam, Z. M. Deng and S. X. Zeng, “Evaluation of construction methods and performance for high rise public housing construction in Hong Kong”, Building and Environment, Vol. 37, No. 10, pp. 983-991, 2002.
[47] M. Tarantini, A. D. Loprieno, E. Cucchi and F. Frenquellucci, “Life cycle assessment of waste management systems in Italian industrial areas: case study of 1st Macrolotto of Prato.” Energy, Vol. 34, No. 5, pp.613-22, 2009.
[48] W. H. Tsai and J. L. Hsu, “Corporate social responsibility programs choice and costs assessment in the airline industry-A hybrid model,” Journal of Air Transport Management, Vol.14, No.4, pp.188-196. 2008.
[49] W. H. Tsai and W. C. Chou, “Selecting management systems for sustainable development in SMEs: A novel hybrid model based on DEMATEL, ANP, and ZOGP,” Expert Systems with Applications, Vol.36, No.2, pp.1444-1458. 2009a.
[50] W. H. Tsai, W. C. Chou and W. Hsu, “The sustainability balanced scorecard as a framework for selecting socially responsible investment: an effective MCDM model,” Journal of the Operational Research Society, Vol.60, No.10, pp.1396-1410. 2009b.
[51] W. H. Tsai and S. J. Hung, “Dynamic pricing and revenue management process in internet retailing under uncertainty: A real options approach,” OMEGA – The International Journal of Management Science, Vol.37, No.2, pp.471-481. 2009c.
[52] W. H. Tsai and S. J. Hung, “A fuzzy goal programming approach for green supply chain optimization under activity-based costing and performance evaluation with a value-chain structure,” International Journal of Production Research, Vol.47, No.18, pp.4991-5017. 2009d.
[53] W. H. Tsai and S. J. Hung, “Treatment and recycling system optimization with activity-based costing in WEEE reverse logistics management: An environmental supply chain perspective,” International Journal of Production Research, Vol.47, No.19, pp.5391-5420. 2009e.
[54] W. H. Tsai, H. W. Lo and W. C. Chou, “Evaluation of mobile services for 3G operators’ future,” International Journal of Mobile Communications, Vol.7, No.4, pp.470-493. 2009f.
[55] W. H. Tsai, W. C. Chou and C. W. Lai, “An effective evaluation model and improvement analysis for national park websites: a case study of Taiwan”, Tourism Management, Vol. 31, No. 6, pp. 936-952, 2010a.
[56] W. H. Tsai, J. L. Hsu, C. H. Chen, W. R. Lin and S. P. Chen, “An integrated approach for selecting corporate social responsibility programs and costs evaluation in the international tourist hotel”, International Journal of Hospitality Management, Vol. 29, No. 3, pp. 385-396, 2010b.
[57] W. H. Tsai and W. Hsu, “A novel hybrid model based on DEMATEL and ANP for selecting cost of quality model development,” Total Quality Management & Business Excellence, Vol.21, No.4, pp.439-456. 2010c.
[58] W. H. Tsai, J. D. Leu, J. Y. Liu, S. J. Lin and Michael J. Shaw, “A MCDM approach for sourcing strategy mix decision in IT projects,” Expert Systems with Applications, Vol.37, No.5 , pp.3870-3886. 2010d.
[59] W. H. Tsai, H. C. Chen, J. Y. Liu, S. P. Chen and Y. S. Shen, “Using activity-based costing to evaluate capital investments for green manufacturing technologies,” International Journal of Production Research, Vol.49, No.24, pp.7275-7292. 2011a.
[60] W. H. Tsai, Y. W. Chou, Elliott T. Y. Hwang, K. C. Lee, J. L. Hsu and H. L. Lin, “Methodology for ranking decisions for improving entrepreneurship strategy,” International Journal of Business and Systems Research, Vol.5, No.6, pp.564-588. 2011b.
[61] W. H. Tsai, W. C. Chou and J. D. Leu, “An effectiveness evaluation model for the Web-based marketing of the airline industry,” Expert Systems with Applications, Vol.38, No.12, pp.15499-15516. 2011c.
[62] W. H. Tsai, W. Hsu and W. C. Chou, “A gap analysis model for improving airport service quality,” Total Quality Management & Business Excellence, Vol.22, No.10, pp.1025-1040. 2011d.
[63] W. H. Tsai, W. Hsu and Thomas W. Lin, “New financial service development for banks in Taiwan based on customer needs and expectations,” The Service Industries Journal, Vol.31, No.2, pp.215-236. 2011e.
[64] W. H. Tsai and H. C. Kuo, “Entrepreneurship policy evaluation and decision analysis for SMEs,” Expert Systems with Applications, Vol.38, No.7, pp.8343-8351. 2011f.
[65] W. H. Tsai, P. L. Lee, Y. S. Shen and Elliott T.Y. Hwang, “A combined evaluation model for encouraging entrepreneurship policies,” Annals of Operations Research, Available online 7 Dec 2011, DOI: 10.1007/s10479-011-1029-6h. 2011g.
[66] W. H. Tsai, S. J. Lin, J. Y. Liu, W. R. Lin and K. C. Lee, “Incorporating life cycle assessments into building project decision making: an energy consumption and CO2 emission perspective,” Energy, Vol.36, No.5, pp.3022-3029. 2011h.
[67] W. H. Tsai, W. R. Lin, Y. W. Fan, P. L. Lee, S. J. Lin and J. L. Hsu, “Applying a mathematical programming approach for a green product mix decision,” International Journal of Production Research, Available online 29 June 2011, DOI: 10.1080/00207543.2011.555429. 2011i.
[68] W. H. Tsai, K. C. Lee, J. Y. Liu, Y. W. Chou and S. J. Lin (Accepted), “A mixed activity-based costing decision (MABCD) model for green airline fleet planning under EU ETS constraints,” Energy. 2012.
[69] G. H. Tzeng, C. H. Chiang and C. W. Li, “Evaluating intertwined effects in e-learning programs: A novel hybrid MCDM model based on factor analysis and DEMATEL”, Expert Systems with Applications, Vol. 32, No. 4, pp. 1028-1044, 2007.
[70] W. C. Wang, “Supporting project cost threshold decisions via a mathematical cost model.” International Journal of Project Management, Vol.22, No.2, pp.99-108, 2004.
[71] S. C. Ward and C.B. Chapman, “Risk-management perspective on the project lifecycle.” International Journal of Project Management, Vol.13, No.3, pp.145-149, 1995.
[72] C. Weber, M. Koyama and S. Kraines, “CO2-emissions reduction potential and costs of a decentralized energy system for providing electricity, cooling, and heating in an office-building in Tokyo,” Energy, Vol.31, No.14, pp.3041-3061, 2006.
[73] R. Weber, B. Werners and H. Zimmerman, “Planning models for research and development”, European Journal of Operational Research, Vol. 48, pp.175-188, 1990.
[74] W. M. Wey and K. Y. Wu, “Interdependent urban renewal project selection under the consideration of resource constraints”, Environment and Planning B: Planning and Design, Vol. 35, pp. 122-147, 2008.
[75] H. P. Williams, “Model building in mathematical programming,” 2nd ed. New York: Wiley; 1985:173-7.
[76] A. A. Yee, “Structural and economic benefits of precast/prestressed concrete construction”, PCI Journal Vol. 7, No. 8, pp. 34-42, 2001.
[77] S. Yu and J. Tao, “Simulation-based life cycle assessment of energy efficiency of biomass-based ethanol fuel from different feedstocks in China.” Energy, Vol.34, No.4, pp.476-84, 2009.
[78] Z. Zhang and A. Baranzini, “What do we know about carbon taxes? An inquiry into their impacts on competitiveness and distribution of income.” Energy Policy, Vol.32, No.4, pp.507-518, 2004.
[79] L. Zhang and Z. Huang, “Life cycle study of coal-based dimethyl ether as vehicle fuel for urban buses in China.” Energy, Vol.32, No.10, pp.1896-904, 2007.
[80] G. Zheng, Y. Jing, H. Huang, X. Zhang and Y. Gao, “Application of life cycle assessment (LCA) and extenics theory for building energy conservation assessment.” Energy, Vol.34, No.11, pp.1870-1879, 2009.
|