參考文獻 |
1. Agnetis, A., and Signoretti, F., 1992, “Part routing in flexible assembly systems-workload balancing and minimization of transfer costs,” Lecture Notes in Control and Information Sciences, vol. 180, pp. 855-864.
2. Agrawal, G. K., and Heragu, S. S., 2006, “A Survey of automated material handling systems in 300-mm semiconductor fabs,” IEEE Transactions on Semiconductor Manufacturing, vol. 19, no. 1, pp. 112-120.
3. Aneke, N. A. G., and Carrie, A. S., 1986, “A design technique for the layout of multi-product flowlines,” International Journal of Production Research, vol. 24, no. 3, pp. 471-481.
4. Angra, S., Sehgal, R., and Noori, Z. S., 2008, “Cellular manufacturing - A time-based analysis to the layout problem,” International Journal of Production Economics, vol. 112, no. 1, pp. 427-438.
5. Azadivar, F., 1986, “Maximization of the throughput of a computerized automated warehousing system under system constraints,” International Journal of Production Research, vol. 24, no. 3, pp. 551-566.
6. Banerjee, P., and Zhou, Y., 1995, “Facility layout design optimization with single loop material flow path configuration,” International Journal of Production Research, vol. 33, no. 1, pp. 183-204.
7. Bilge, U., and Tanchoco, J. M. A., 1997, “AGV systems with multi-load carriers: Basic issues and potential benefits,” Journal of Manufacturing Systems, vol. 16, vo. 3, pp. 159-171.
8. Bock, S., and Hoberg, K., 2007, “Detailed layout planning for irregularly-shaped machines with transportation path design,” European Journal of Operational Research, vol. 177, no. 2, pp. 693-718.
9. Bozer, Y. A., and Yen, C. K., 1996, “Intellignet dispatching rules for trip-based material handling systems,” Journal of Manufacturing Systems, vol. 15, no. 4, pp. 226-239.
10. Braglia, M., 1997, “Heuristics for single-row layout problems in flexible manufacturing systems,” Production Planning and Control, vol. 8, no. 6, pp. 558-567.
11. Carrie, A. S., 1975, “Layout of multi-product line,” International Journal of Production Research, vol. 13, no. 6, pp. 451-557.
12. Chae, J. J., and Peters, B. A., 2006, “A simulated annealing algorithm based on a closed loop layout for facility layout design in flexible manufacturing systems,” International Journal of Production Research, vol. 44, no. 13, pp. 2561-2572.
13. Chen, D. S., Wang, Q., and Chen, H. C., 2001, “Linear sequencing for machine layouts by a modified simulated annealing,” International Journal of Production Research, vol. 39, no. 8, pp. 1721-1732.
14. Display Search, 2010, Quarterly Large-Area TFT LCD Shipment Report, http://www.displaysearch.com/cps/rde/xchg/displaysearch/hs.xsl/100811_q2_large_area_tft_lcd_shipments_reach_record_high_of_170_m.asp.
15. Dym, C. L., and Little, P., 2000, Engineering Design-A Project-Based Introduction (New York: Wiley).
16. Egbelu, P. J., 1987a, “Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system,” Journal of Manufacturing Systems, vol. 6, pp. 359-374.
17. Egbelu, P. J., 1987b, “The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system,” Material Flow, vol. 4, pp. 17-32.
18. Egbelu, P. J., 1991, “Framework for dynamic positioning of storage / retrieval machines in an automated storage / retrieval system,” International Journal of Production Research, vol. 29, no. 1, pp. 17-37.
19. Egbelu, P. J., and Tanchoco, J. M. A., 1984, “Characterization of automatic guided vehicle dispatching rules,” International Journal of Production Research, vol. 22, no. 3, pp. 359-374.
20. Egbelu, P. J., and Wu, C.-T., 1993, “A comparison of dwell point rules in an automated storage / retrieval system,” International Journal of Production Research, vol. 31, no. 11, pp. 2515-2530.
21. Elsayed, E. A., and Stern, R. G., 1983, “Comtuterized algorithms for order processing in automated warehousing systems,” International Journal of Production Research, vol. 21, no. 4, pp. 579 – 586.
22. Eynan, A., and Rosenblatt, M. J., 1993, “An interleaving policy in automated storage / retrieval systems,” International Journal of Production Research, vol. 31, no. 1, pp. 1-18.
23. Gung, R. R., and Steudel, H. J., 1999, “A workload balancing model for determining set-up time and batch size reductions in GT flow line workcells,” International Journal of Production Research, vol. 37, no. 4, pp. 769-791.
24. Ham, H. S., 1996, “Job route selection model for workload balancing between workstations in flexible flow line,” Production Planning & Control, vol. 7, no. 4, pp. 430-438.
25. Han, M.-H., McGinnis, L. F., Shieh, J. S., and White, J. A., 1987, “On sequencing retrievals in an automated storage / retrieval system,” IIE Transactions, vol. 19, no. 1, pp. 56-66.
26. Heragu, S. S., and Kusiak, A., 1988, “Machine layout problem in flexible manufacturing systems,” Operational Research, vol. 36, no. 2, pp. 258-268.
27. Heragu, S. S., and Kusiak, A., 1990, “Machine layout: an optimization and knowledge-based approach,” International Journal of Production Research, vol. 28, no. 4, pp. 615-635.
28. Hillier, M. S., and Brandeau, M. L., 2001, “Cost minimization and workload balancing in printed circuit board assembly,” IIE Transactions, vol. 33, no. 7, pp. 547-557.
29. Ho, Y. C., 2000, “A dynamic-zone strategy for vehicle-collision prevention and load balancing in an AGV system with a single-loop guide path,” Computers in Industry, vol. 42, no. 2-3, pp. 159-176.
30. Ho, Y. C., and Chien, S. H., 2006, “A Simulation Study on the Performance of Task-Determination Rules and Delivery-Dispatching Rules for Multiple-Load AGVs,” International Journal of Production Research, vol. 44, no. 20, pp. 4193-4222.
31. Ho, Y. C., and Hsieh, P. H., 2004, “A machine-to-loop assignment and layout design methodology for tandem AGV systems with multiple-load vehicles,” International Journal of Production Research, vol. 42, no. 4, pp. 801-832.
32. Ho, Y. C., and Hsieh, H. W., 2005, “A part-and-tool assignment method for the workload-balance between machines and the minimisation of tool-shortage occurrences in an FMS,” International Journal of Production Research, vol. 43, no. 9, pp. 1831-1860.
33. Ho, Y. C., and Lee C. S., 2004, “A no-cost zone and iso-cost line based control method for an AS/RS with a multiple-load Stacker crane,” Journal of the Chinese Institute of Industrial Engineers, vol. 21, no. 1, pp. 1-17.
34. Ho, Y. C., Lee, C. C., and Moodie, C. L., 1993, “Two sequence-pattern, matching-based, flow analysis methods for multi-flowlines design,” International Journal of Production Research, vol. 31, no. 7, pp. 1557-1578.
35. Ho, Y. C., and Liao, T. W., 2009, “Zone design and control for vehicle collision prevention and load balancing in a zone control AGV system,” Computer and Industrial Engineering, vol. 56, no. 1, pp. 417-432.
36. Ho, Y. C., and Liao, T. W., 2011, “The layout design of semiconductor bays with spine and perimeter inter-bay guide path loops,” International Journal of Production Research, DOI:10.1080/00207543.2010.543936.
37. Ho, Y. C., and Liu, C. F., 2005, “A design methodology for converting a regular warehouse into a zone-picking warehouse,” Journal of the Chinese Institute of Industrial Engineers, vol. 22, no. 4, pp. 332-345.
38. Ho, Y. C., and Liu, H. C., 2006, “A Simulation Study on the Performance of Pickup-Dispatching Rules for Multiple-Load AGVs,” Computers and Industrial Engineering, vol. 51, no. 3, pp. 445-463.
39. Ho, Y. C., and Liu, H. C., 2009, “The performance of load-selection rules and pickup-dispatching rules for multiple-load AGVs,” Journal of Manufacturing Systems, vol. 28, vo. 1, pp. 1-10.
40. Ho, Y. C., and Moodie, C. L., 1998, “Machine layout with a linear single-row flow path in an automated manufacturing system,” Journal of Manufacturing Systems, vol. 17, no. 1, pp. 1-22.
41. Ho, Y. C., and Moodie, C. L., 2000, “A hybrid approach for concurrent layout design of cells and their paths in a tree configuration,” International Journal of Production Research, vol. 83, no. 4, pp. 895-928.
42. Hollier, R. H., 1963, “The layout of multi-product lines,” International Journal of Production Research, vol. 2, no. 1, pp. 47-57.
43. Hu, Y.-H., Huang, S. Y., Chen, C., Hsu, W.-J., Toh, A. C., Loh, C. K., and Song, T., 2005, “Travel time analysis of a new automated storage and retrieval system,” Computers & Operations Research, vol. 32, no. 6, pp. 1515-1544.
44. Huang, H. C., Lee, C. L., and Xu, Z. Y., 2006, “The workload balancing problem at aircargo terminals,” OR Spectrum, vol. 28, no. 4, pp. 705-727.
45. Hwang, H., and Lim, J. M., 1993, “Deriving an optimal dwell point of the storage / retrieval machine in an automated storage / retrieval system,” International Journal of Production Research, vol. 31, no. 11, pp. 2591-2602.
46. ILOG CPLEX 7.1, 2001, ILOG CPLEX 7.1 User’s Manual, Gentilly, France: ILOG SA.
47. Kelton, W. D., Sadowski, R. P., and Sturrock, D. T., Simulation with arena. Boston: McGraw-Hill, 2003.
48. Kesen, S. E., and Baykoca, O. F., 2007, “Simulation of automated guided vehicle (AGV) systems based on just-in-time (JIT) philosophy in a job-shop environment,” Simulation Modelling Practice and Theory, vol. 15, no. 3, pp. 272-284.
49. Kim, C. W., Tanchoco, J. M. A., and Koo, P. H., 1999, “AGV dispatching based on workload balancing,” International Journal of Production Research, vol. 37, no. 17, pp. 4053-4066.
50. Kirckpatrick, S., Gelatt, Jr., C. D. & Vecchi, M. P., 1983, “Optimization by simulated annealing,” Science, vol. 220, no. 4589, pp. 671-680.
51. Koo, P.-H., Jang, J., and Suh J., 2005, “Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first,” International Journal of Flexible Manufacturing Systems, vol. 17, no. 1, pp. 23-38.
52. Kouvelis, P., Chiang, W.C., and Fitzsimmons, J., 1992, “Simulated annealing for machine layout problems in the presence of zoning constraints,” European Journal of Operational Research, vol. 57, no. 2, pp. 203-223.
53. Kouvelis, P., and Kim, M. W., 1992, “Unidirectional Loop Network Layout Problem in Automated Manufacturing Systems,” Operational Research, vol. 40, no. 3, pp. 533-550.
54. Langevin, A., Montreuil, B., and Riopel, D., 1994, “Spine layout design,” International Journal of Production Research, vol. 32, no. 2, pp. 429-442.
55. Law, A. M., and Kelton, W. D., 2000, Simulation modeling and analysis. Boston: McGraw-Hill.
56. Lee, S. D., and Chen, Y. L., 1997, “A weighted approach for cellular manufacturing design: Minimizing intercell movement and balancing workload among duplicated machines,” International Journal of Production Research, vol. 35, no. 4, pp. 1125-1146.
57. Lee, H. F., and Schaefer, S. K., 1996, “Retrieval sequencing for unit-load automated storage and retrieval systems with multiple openings,” International Journal of Production Research, vol. 34, no. 10, pp. 2963-2966.
58. Lee, J., and Maneesavet, R., 1999, “Dispatching rail-guided vehicles and scheduling jobs in a flexible manufacturing system,” International Journal of Production Research, vol. 37, no. 1, pp. 111-123.
59. Lee, J., and Srisawat, T., 2006, “Effect of manufacturing system constructs on pick-up and drop-off strategies of multiple-load AGVs,” International Journal of Production Research, vol. 44, no. 4, pp. 653-673.
60. Lee, J., Tangjarukij, M., and Zhu, Z., 1996, “Load selection of automated guided vehicles in flexible manufacturing systems,” International Journal of Production Research, vol. 34, no. 12, pp. 3388-3400.
61. Linn, R. J., and Wysk, R. A., 1987, “An analysis of control strategies for an automated storage / retrival system,” INFOR, vol. 25, no. 1, pp. 66-83.
62. Metropolis, N. A. W., Rosenbluth, M. N., Rosenbluth, A. H. M. H. Teller, and E, Teller, 1953, “Equation of state calculation by fast computing machines,” The Journal of Chemical Physics, vol. 21, pp. 1087-1092.
63. Min, H-S., and Yih, Y., 2003, “Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system,” International Journal of Production Research, vol. 41, no. 16, pp. 3921-3941.
64. Ozden M., 1988, “A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system,” International Journal of Production Research, vol. 26, no. 8, pp. 1353-1366.
65. Pahl, G., and Beitz, W., 1996, Engineering Design-A Systematic Approach (London: Springer-Verlag).
66. Ponnambalam, S. G., and Ramkumar, V., 2001, “A genetic algorithm for design of a single-row layout in automated manufacturing systems,” The International Journal of Advanced Manufacturing Technology, vol. 18, no. 8, pp. 512-519.
67. Potts, C. N., and Whitehead, J. D., 2001, “Workload balancing and loop layout in the design of a flexible manufacturing system,” European Journal of Operational Research, vol. 129, no. 2, pp. 326-336.
68. Rardin, R. L., 1998, Optimization in operations research, Upper Saddle River, NJ: Prentice-Hall.
69. Rezapour, S., Zanjirani-Farahani, R., and Miandoabchi, E., 2011, “A machine-to-loop assignment and layout design methodology for tandem AGV systems with single-load vehicles,” International Journal of Production Research, vol. 49, no. 12, pp. 3605-3633.
70. Rockwell Automation, Arena user’s guide. Milwaukee: Rockwell Softwarem, 2004.
71. Romesburg, H. C., 1984, Cluster Analysis for Researchers, Lifetime Learning Publications (Wadsworth Inc.), Belmont, CA.
72. Rouwenhorst, B., Reuter, B., Stockrahm, V., Houtum, G. J. van, Mantel, R. J., and Zijm, W. H. M., 2000, “Warehouse design and control: Framework and literature review,” European Journal of Operational Research, vol. 122, no. 3, pp. 515-533.
73. Sabuncuoglu, I., and Hommertzheim, D. L., 1992, “Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system”, International Journal of Production Research, vol. 30, no. 5, pp. 1059-1079.
74. Sarker, B. R., 2003, “The effect of material flow and workload on the performance of machine location heuristics,” European Journal of Operational Research, vol. 148, no. 1, pp. 166-191.
75. Shr, A. M. D., Liu, A., and Chen, P. P., 2006, “A heuristic load balancing scheduling method for dedicated machine constraint,” Lecture Notes in Computer Science, vol. 4031, pp. 750-759.
76. Solimanpur, M., and Jafari, A., 2008, “Optimal solution for the two-dimensional facility layout problem using a branch-and-bound algorithm,” Computer and Industrial Engineering, vol. 55, no. 3, pp. 606-619.
77. Solimanpur, M., and Kamran, M. A., 2010, “Solving facilities location problem in the presence of alternative processing routes using a genetic algorithm,” Computer and Industrial Engineering, vol. 59, no. 4, pp. 830-839.
78. Solimanpur, M., Vrat, P., and Shankar, R., 2005, “An ant algorithm for the single row layout problem in flexible manufacturing systems,” Computers & Operations Research, vol. 33, no. 3, pp. 583-598.
79. Su, Y. C., Hung, M. H., Cheng, F. T., and Chen, Y. T., 2006, “A processing quality prognostics scheme for plasma, sputtering in TFT-LCD manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 19, no. 2, pp. 183-194.
80. Sule, D. R., 1994, Manufacturing facilities: location, planning, and design. Boston: PWS-KENT Publishing Company.
81. Tazari, S., Muller-Hannemann, M., and Weihe, K., 2006, “Workload balancing in multi-stage production processes,” Lecture Notes in Computer Science, vol. 4007, pp. 49-60.
82. Wang, J.-Y., and Yih, Y., 1997, “Using neural networks to select a control strategy for automated storage and retrieval systems (AS/RS),” International Journal Computer Integrated Manufacturing, vol. 10, no. 6, pp. 487-495.
83. Wilson, J. M., 1992, “Approaches to machine load balancing in flexible manufacturing systems,” Journal of the Operational Research Society, vol. 43, no. 5 pp. 415-423.
84. Yang T. H., Peters B. A., and Tu, M., 2005, “Layout design for flexible manufacturing systems considering single-loop directional flow patterns,” European Journal of Operational Research, vol. 164, no. 2, pp. 440-455.
85. Yin, Y., and Yasuda, K., 2005, “Similarity coefficient methods applied to the cell formation problem: a comparative investigation,” Computer and Industrial Engineering, vol. 48, no. 3, pp. 471-189.
86. Young, R., 1998, “TFT LCDs increasing market share through technological innovation,” Semiconductor International, vol. 21, no. 5, pp. 97-100.
87. Young, J. J., Gi, H. C., and Sun, I. K., 2005, “Modeling and analysis of stocker system in semiconductor and LCD fab,” Semiconductor Manufacturing, IEEE International Symposium on 13-15 Sept. 2005, pp. 273-276.
|