摘要(英) |
Semiconductor industry is a very competitive industry. The make-to-order semiconductor fab in order to satisfy customer’s delivery date, it is very important performance measure in a make-to-order fab. GaAs fab production mode is very similar to the silicon fab, but because of the high complexity of the products and technologies and is does not achieve economies of scale of production. The application of automation to semiconductor equipment is low and production recipe control sensitivity is high, it causes poor production efficiency and stability. To improve the production control of the large semiconductor fab, there are many related exploration and research. For semiconductor production lines of different modules and characteristics, they can’t be directly applied to the relevant research results.
The research purpose is to improve equipment utilization rate and meet customer delivery targets
Establish a factory production efficiency for different size and characteristics of the semiconductor and management improvement model to improve equipment utilization rate and meet customer delivery targets. |
參考文獻 |
1.黃仁婷(2008),應用限制理論於提升半導體封裝達交率之研究,逢甲大學工業工程與系統管理學研究所論文。
2.張文誠(2009),以非延遲排程為基礎之派工法則之研究,立德大學工業管理研究所論文。
3.王祥義(2010),因應產品組合變化的彈性生產做法:以化合物半導體晶圓製造代工廠為例,國立清華大學工業工程與工程管理研究所論文。
4.莊政益(2007),組裝型設備製造業在場地限制下之訂單排程研究-以LCD設備製造業為例,東海大學工業工程與經營資訊研究所論文。
5.Blackstone, J H, Phillips, D T, and Hogg, G L, A state-of-the-art survey of dispatching rules for manufacturing job shop operation, International Journal of Production Research, 20(1), 27-45, (1982)
6.Glassey, C R and Resende, M G C, Closed-loop job release control for VLSI circuit manufacturing, IEEE Transactions on Semiconductor manufacturing, 1(1), 36-46, (1998)
7.Baudin, M, Manufacturing Systems Analysis with Application to Production Scheduling, Prentice Hall Inc, (1990)
8.Graves, S C (1981), “A Review of Production Scheduling” Operation Research, 29, pp646-70
9.Klusewitz, G and Rerick, R, “Constraint management through the Drum–Buffer–Rope”, IEEE Advanced Semiconductor Manufacturing Conference, pp275-280,1998
10.Jackson, J R, “Simulation Research on Job Shop Production”, Naval Research Logistics Quarerly, 4(4), pp287-289, 1957
11.Panwalker, S S and W Iskander, “A survey of scheduling rules,” Operations Research, Vol25, No1 , pp45-61 , 1977 |