參考文獻 |
[1] Arts R.H.P.M., Gerald M. Knapp, Lawrence Mann Jr. (1998), Some aspects of measuring maintenance performance in the process industry, Journal of Quality in Maintenance Engineering, 4 6 -11.
[2] Schmidt G. (2000), Scheduling with limited machine availability, European Journal of Operational Research, 121 1-15.
[3] Sanlaville E., Schmidt G. (1998), Machine scheduling with availability constraints, Acta Informatica, 35 795–811.
[4] Lee C.Y., Chen Z.L. (2000), Scheduling of Jobs and Maintenance Activities on Parallel Machines, Naval Research Logistics, 47 145-165.
[5] Qi X., Chen T., Tu F. (1999), Scheduling the maintenance on a single machine, The Journal of the Operation Research Society, 50 1071-1078.
[6] Sbihi M., Varnier C. (2008), single machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness, 55 830–840
[7] Mosheiov G., Sarig A. (2009), Scheduling a maintenance activity to minimize total weighted completion-time, 57 619-623
[8] Chen J.S. (2006), Optimization models for the machine scheduling problem with a single flexible maintenance activity, Engineering Optimization, 38 53-71
[9] Yang S.L., Ma Y., Xu D.L., Yang J.B. (2011), Minimizing total completion time on a single machine with a flexible maintenance activity, Computers & Operations Research, 38 755–770
[10] Yang D.L., Hsub C.J., Kuo W.H.(2008), A two-machine flow shop scheduling problem with a separated maintenance constraint, Computers & Operations Research, 35 876–83.
[11] Adiri I, Bruno J, Frostig E, Rinnooy Kan AHG. (1989), Single machine flow-time scheduling with a single breakdown, Acta Informatica 26 679–96
[12] Lee C.Y., Liman SD. (1992),Single machine flow-time scheduling with scheduled maintenance, Acta Informatica, 29 375–82.
[13] Mellouli R., Sadfi C., Chu C.,Kacem I. (2009), Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times, European Journal of Operational Research, 197 1150–1165
[14] Sadfi C., Penz B., Rapine C., Blazewicz J., Formanowicz P. (2005), An improved approximation algorithm of the single machine total completion time scheduling problem with availability constraints, European Journal of Operational Research, 161 3– 30
[15] Levin A., Mosheiov G., Sarig A. (2009), Scheduling a maintenance activity on parallel identical machines, Naval Research Logistics, 56 33–41
[16] Sun K., and Li H. (2010), Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines, Production Economics, 124 151–158
[17] Xu D., Sun K., Li H. (2008), Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan, Computers & Operations Research, 35 1344–1349
[18] Xu D., Yin Y. (2011), On single-machine scheduling with flexible maintenance activities, Int J Adv Manuf Technol, 56 1139–1145
[19] Graham, R.L., Lawler E.L., Lenstra J.K., and Ronnooy Kan A.H.G (1979), Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5 287-326
[20] Chen J.S. (2008), Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan, European Journal of Operational Research, 190 90–102
[21] Graves G.H., Lee C.Y. (1999), Scheduling maintenance and semiresumable jobs on a single machine, Naval Research Logistics, 46 845–863
[22] Pan E., Liao W., Xi L. (2010), Single-machine-based production scheduling model integrated preventive maintenance planning, Int J Adv Manuf Technol, 50 365–375
[24] Kacem I., Chu C., Souissi A. (2008), Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times, Computer & Operation Research, 35 827–844
[25] Kaabi J., Varnier., Zerhouni N. (2002), Heuristics for scheduling maintenance and production on a single machine, IEEE SMC, 5
[26] Rebai M., Kacem I., Adjallah K.H. (2010), Scheduling Jobs and Preventive Maintenance Activities on Parallel Machine, APPLIED COMPUTER SCIENCE, 406-411
[27] Rebai M., Kacem I., Adjallah K.H. (2012), Earliness–tardiness minimization on a single machine to schedule, J Intell Manuf, 23 1207–1224
[28] Chen Z.L. (2004), Simultaneous Job Scheduling and Resource Allocation on Parallel Machines, Annals of Operations Research, 129, 135–153
[29] Wang S., Yu J. (2008), An effective heuristic for flexible job-shop scheduling problem with maintenance activities, Computers & Industrial Engineering, 59 436–447 |