參考文獻 |
Reference
Ahmed, A., Kayis, B., & Amornsawadw, S. (2007). A review of techniques for riskmanagement in projects. Benchmarking: An International Journal, 14(1), 22-36.
AIAG. (1995). Potential failure modes and effects analysis (FMEA) reference manual.
Airmic, Alarm, & IRM. (2010). A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000.
Anumba, C. J., Catherine Baugh, & Khalfan, M. M. A. (2002). Organisational structures to support concurrent engineering in construction. Industrial Management & Data Systems, 102(5), 260-270.
Brown, S. L., & Eisenhardt, K. M. (1995). Product development: past research, present findings, and future directions. The Academy of Management Review, 20(2), 343-378.
Browning, T. R. (2001). Applying the Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 48(3).
Choi, Y., Kim, K., & Kim, C. (2005). A design Chain collaboration framework using reference models. The International Journal of Advanced Manufacturing
Technology, 26, 183-190.
Clark, K. B., & Fujimoto, T. (1991). Product Development Performance. Harvard Business Press, Boston, MA.
Cooper, R. G. (1990). Stage-Gate systems: a new tool for managing new products. Business Horizons, 33(3), 44-53.
Cooper, R. G. (1994). Third-generation new product processes. Journal of Product Innovation Management, 11(3), 3-14.
Cooper, R. G. (1998). Portfolio Management for New Products: Picking The Winners. Product Development Institute Inc.
Cooper, R. G. (2008). Perspective: The stage-gates® idea-to-launch process - update, what’s new, and NexGen systems. Product Innovation Management, 25(3), 213-232.
Cooper, R. G., & Edgett, S. J. L. (2005). Rapid and Profitable New Product Development. Product Development Institute Inc.
Cooper, R. G., & Kleinschmidt, E. J. (1995). Benchmarking the firm’s critical success factors in new project development. Product Innovation Management, 12(5), 374–391.
Crawford, C. M., & Benedetto, C. A. D. (2006). New products management. Boston: McGraw-Hill/Irwin, 8.
DeVor, R. E., Chang, T., & Sutherland, J. W. (1992). Statistical Quality Design and Control. New York : Macmillan, 51-57.
Ertas, A., & Jones, J. C. (1993). The Engineering Design Process. New York:Wiley.
Himmelman, A. T. (1996). On the Theory and Practice of Transformational Collaboration: From Social Service to Social Justice. Creating Collaborative Advantage, London: Sage Publications.
Hopkin, P. (2010). Fundamentals of risk management: understanding, evaluating, and implementing effective risk management. The Insitute of Risk Management.
ISO. (2009a). ISO 31000 - Risk Manaement Standard. International Organization for Standardization.
ISO. (2009b). ISO Guide 73 Risk Management - Vocabulary. International Organization for Standardization.
Klein, M., Sayama, H., Faratin, P., & Bar-Yam, Y. (2003). The Dynamics of Collaborative Design: Insights From Complex Systems and Negotiation Research. Concurrent Engineering: Research and Applications, 11(3).
Kvan, T. (2000). Collaborative design: what is it? Automation in Construction, 9(4), 409-415.
Narahari, Y. (1999). Lead time modeling and acceleration of product design and development. Robotics and Automation, IEEE Transactions on, 15(5), 882-896
Nikonov, V., & Kogan, I. (2009). How can ISO Management System Standards contribute to mitigate business risks? Presentation at International Conference on Risk
Assessment and Inovation, 24-25.
Oehmen, J., Dick, B., Lindemann, U., & Seering, W. (2006). RISK MANAGEMENT IN PRODUCT DEVELOPMENT – CURRENT METHODS. INTERNATIONAL DESIGN CONFERENCE.
Omdahl, T. P. (1988). Reliability, availability, and maintainability dictionary. ASQC Quality Press.
Scheer, A.-W. (1992). Architecture of Integrated Information Systems:. Principles of EnterpriseModeling.
Scheer, A.-W., & Nüttgens, M. (2000). ARIS Architecture and Reference Models for Business Process Management. Techniques, and Empirical Studies, LNCS 1806, 366-379.
Scheer, I. (2007). ARIS Platform Products Version: 7.02. BTTrends.
Song, B., Sun, J. M., & Passey, S. J. (2004). A Preliminary Study and Exploration on a Knowledge-Supported Methodology for New Product Planning and Conceptualization (KM-NPC). Science and Technology Review, 275-278.
Stamatis, D. H. (2003). Failure Mode and Effect Analysis: Fmea from Theory to Execution. American Society for Quality.
Teng, S.-H. G., & Ho, S.-Y. M. (1996). Failure mode and effects analysis: An integrated approach for product design and process control. International Journal of Quality & Reliability Management, 13(5), 8 - 26.
Tummalaa, V. M. R., & Burchettb, J. F. (1999). Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project. International Journal of Project Management, 17(4), 223–235.
Ulrich, K. T., & Eppinger, S. D. (2001). Product Design and Development. Irwin McGraw-Hill, 2.
Valsamakis, A. C. ( 2003). Risk Management, s.l. : Heinemann Higher and Further
Edducation (Pty) Ltd ISBN 1868538176.
Wang, L., Shen, W., Xie, H., Neelamkavil, J., & Paradasani, A. (2002). Collaborative conceptual design-stage of the art and future trends. Computer-Aided Design, 34, 981-996.
Yassine, A., & Braha, D. (2003). Complex Concurrent Engineering and the Design Structure Matrix Method. Concurrent Engineering: Research and Applications, 11(3), 165-176.
Yassine, A. A. An Introduction to Modeling and Analyzing Complex Product Development Processes Using the Design Structure Matrix (DSM) Method. Product Development Research Laboratory”, University of Illinois at Urbana-Champaign.
Zealand, A. N. (1999). Risk Management Standard AS/NZS 4360. |