dc.description.abstract | Sustainable development of climate change, adaptation and retard and parkland are of great urgency for Linkou District, there are total installations of 28 wet type, dry type and hybrid type flood detention ponds in 10 educational land acquisitions, 14 neighborhood parks and green spaces, 2 squares and 1 green space, and conduct green landscaping of "park", "children′s playground" for 17 flood detention ponds of neighborhood parks, squares, green spaces, let flood detention ponds can provide residents the flood detention disaster prevention and recreation of multifunctional use at the same time.
In this study, there are six major research topics, including "flood detention pond parks", "ecological water permeability", "space activation", "green landscaping", "use and management" and "facility maintenance", establishing assessment criteria of existing flood detention pond neighborhood parks and as planning demonstrations for subsequent flood detention neighborhood parks, introducing updating parks into the concept investigation of sustainable development, flood detention pond disaster prevention, water permeability environment, maintenance and management, and joining the public opinion to explore park maintenance and management issues.
Research results show that in addition to checking the water management calculation of permit flood drainage of runoff, detention amount and downstream drainage system in each drainage district through park detention pond planning, it also conducts space activation and adds new facilities at the pond bottom and updates to have flood detention, ecology water permeability and green landscaping features, remodels flood detention ponds to become a neighborhood park and builds Linkou to become flood detention pond demonstration area. Besides, green parks should be through the water permeability pavements to increase the green coverage area, to improve base water retention and to reduce the heat island effect to reach sustainable development goals; dedicated venues can improve the service quality through delegated administration. Another repairs and maintenance of flood detention pond neighborhood parks hardware facilities should actively set the annual "open contract" to handle; it is the better repair method to improve the effectiveness. Proposing to set park development and design standards, specifying park green coverage and other space facilities standards, avoiding park open up design which is not consistent with sustainable development , in addition to taking into account of philosophy of society fairness, economic development and environmental conservation, it also can reach "sustainable development, multifunctional use and quality improvement" of green parks and the goal of harmonious and comfortable production, life and ecological environment.
| en_US |