dc.description.abstract | Taoyuan International Airport Terminal 1 improvement plan had been consigned to Japan delegate Ji Yan architect for planning design since September , 2004.The design plan took 3 years for approval. Terminal 1 started to reconstruct from 2009. In the meantime , the aged main building became severer. According to Airports Council International ( ACI ) evaluation , Taoyuan aiport’s ranking declines annually and is ranked the worst at No.29th in 2011 which affecting its international image negatively.
Terminal 1 ‘s reconstruction is still on process presently. Since the process is unable to enclose the whole area , the reconstruction can only cover small part step by step. However , it causes several construction events (such as leaking , falling rocks , fences collapse , etc.), attracting media attention and causing damage to the image of the international airport.
The study reviews the Taoyuan airport terminal 1 improvement project that the main issues are summed up in policy , planning , regulation, design, implementation, and technical for analysis , with reference to the relevant documentation and preventive strategies. A result from depth interview can be verified. Expecting this study can provide to decision maker as a reference for future major infrastructure in order to enhance the overall effectiveness of public construction operation. | en_US |