dc.description.abstract | Taoyuan actively promoted the road-smoothing project since it upgraded to a special municipality. The project implements with a budget of NT 10 billion in 8 years, and has cooperated with the Road Quality Improving project from the Forward-kooking Infrastructure Planning, 2017. Select appropriate road sections in each district to cooperate with policy planning and report to the central government for subsidies. Include the forward-looking road quality project that has subsidised by the central government, to the Taoyuan road-smoothing project result, and with the annual repair work, to make Taoyuan citizens satisfied with the improvement of the road environment.
In the face of the declining birthrate and the gradual stepping into an advanced and super-aged society, the road quality improvement planning no longer focuses solely on road leveling. Instead, by planning the urban and rural traffic environment, creating a friendly human-oriented space road, creating a humane, affinity, reliable, comfortable and healthy environment, and integrating traditional transportation construction, while taking into account economy, efficiency, convenience, and safety characteristics, greatly improve the quality of road services, and achieve the vision of implementing the responsibility of universal care. In order to establish the road quality improvement planning version 2.0, this study uses hierarchical analysis, test questionnaires, expert questionnaires, verification questionnaires, etc., through investigations and interviews of industry experts and government agencies. Established 4 evaluation criteria and 9 quantitative indicators of the Road Quality Improvement Planning version 2.0, and then use the Taoyuan City Government to obtain subsidies for the forward-looking infrastructure construction case for verification and analysis.
In the road quality improvement planning version 2.0 established by this study, energy conservation, environmental protection and circular economy indicators takes 11% of total weight. In recent years, the policy orientation has focused on sustainable development, circular economy and energy saving and carbon reduction as the goal. Therefore, this study discusses the refined strategy of the application of circular economy in public projects, analyze the engineering characteristics and put forward the results of the effectiveness test for the application of slag steel pellets, planed asphalt concrete pellets and incineration pellets, etc. Additionally, we use a material supply plan to trace the source control of recycled materials: establish a circular economy management platform to track and manage the flow of circular economy materials in Taoyuan City Government’s public projects.
From forward-looking infrastructure to the application of circular economy to public projects, the main factors for its effective implementation include the most favorable criteria, selection of excellent manufacturers, and effective contracts. It makes the agency’s performance targets clear, promote manufacturers to improve quality, give them an environment for innovation, research and development, and save expenditures. This study also proposes technical and managerial performance indicators. For some roads in Qingpu, Taoyuan, the effectiveness contract execution model has been successfully implemented, using the effectiveness contract outsourcing strategy for maintenance projects.
Using the road asset management and maintenance management platform to integrate the relevant operating system of the Taoyuan City Government’s road engineering and collect historical data of road engineering. Finally, established a real-time management system and cooperate platform, its functions is to sort road maintenance needs, integrate road maintenance into effective contract tenders and project budgeting recommendations, as a reference for decision-making. | en_US |