博碩士論文 108325601 完整後設資料紀錄

DC 欄位 語言
DC.contributor土木系營建管理碩士班zh_TW
DC.creatorJohn Mark M. Taborzh_TW
DC.creatorJohn Mark M. Taboren_US
dc.date.accessioned2022-9-27T07:39:07Z
dc.date.available2022-9-27T07:39:07Z
dc.date.issued2022
dc.identifier.urihttp://ir.lib.ncu.edu.tw:88/thesis/view_etd.asp?URN=108325601
dc.contributor.department土木系營建管理碩士班zh_TW
DC.description國立中央大學zh_TW
DC.descriptionNational Central Universityen_US
dc.description.abstract臺灣交通部(MOTC)已公佈以DER&U 方式檢測與評估橋梁劣化與維護 橋梁的相關規範與手冊。此DER&U 的檢測與評估方式已被證明可以有效地 維持臺灣公路和鐵路橋梁的結構安全性和服務性。然而,此檢測方與評估 式若應用於人行天橋,可能會浪費已經有限的維護資源,因為人行天橋承 受的載重較輕,相較於較大橋梁其劣化範圍較為狹隘且有所不同。 本研究旨在建立人行天橋的標準化檢測與維護方式,為臺灣的1,268 座人行天橋提供合適的維護管理架構。此架構之基礎,在於先將6 種人行 天橋類型的構件分為結構安全性和服務性,並以目視檢測之方式評估各構 件之劣化情況,再結合對橋梁專家進行兩輪德爾菲方法訪談所得各類型人 行天橋各構件之權重後,即可計算出該人行天橋之橋梁狀況指數。此橋梁 狀況指數可用於橋梁檢測和維護之優先順序,可找出所轄橋梁中最迫切需 要維修之橋梁。本研究建立之維護管理架構,以桃園市5 座人行天橋做為 測試之範例,可驗證此架構具備資源優化的實用性和價值。本研究之成果 適用於大量人行天橋之維護管理,對橋梁工程和管理方面的知識體系具相 當之貢獻。zh_TW
dc.description.abstractThe central government of Taiwan, through the Ministry of Transportation and Communications (MOTC), has issued bridge inspection and maintenance specifications and manuals that include the DER&U condition assessment process. This process has proven to be effective in maintaining the structural safety and serviceability of Taiwan’s highway and railway bridge inventory. However, adapting it to pedestrian bridges may only consume undue amount of already limited maintenance resources since they carry lighter loads and thus may experience a narrower spectrum of defects than their larger counterparts. In order to provide a standardized inspection and maintenance approach tailored to their needs, this research developed a framework for the maintenance of Taiwan’s 1,268 pedestrian bridges. The framework is designed to assess the structural safety and serviceability of 6 pedestrian bridge types through visual inspection. Two rounds of Delphi method interviews with bridge experts were conducted to assign weight factors to the components that form each pedestrian bridge type. These weight factors and the visual inspection results are then combined to calculate an index that represents the condition of a pedestrian bridge. The index can be used for inspection scheduling and maintenance prioritization by revealing which pedestrian bridge units in the inventory are the most deteriorated and in urgent need of repair. The framework’s application to 5 pedestrian bridges in Taoyuan City demonstrated its practicality and value in prioritizing pedestrian bridges for maintenance resource optimization. By presenting a strategy for managing a large inventory of pedestrian bridges, this study contributes to the body of knowledge in bridge engineering and management.en_US
DC.subject人行天橋zh_TW
DC.subject橋梁管理zh_TW
DC.subject橋梁檢測zh_TW
DC.subject狀況指數zh_TW
DC.subject維護優先順序zh_TW
DC.subject德 爾菲法zh_TW
DC.subjectpedestrian bridgeen_US
DC.subjectfootbridgeen_US
DC.subjectbridge managementen_US
DC.subjectbridge inspectionen_US
DC.subjectcondition indexen_US
DC.subjectmaintenance prioritizationen_US
DC.subjectDelphi methoden_US
DC.titleMaintenance Prioritization Framework for Taiwan’s Pedestrian Bridgesen_US
dc.language.isoen_USen_US
DC.type博碩士論文zh_TW
DC.typethesisen_US
DC.publisherNational Central Universityen_US

若有論文相關問題,請聯絡國立中央大學圖書館推廣服務組 TEL:(03)422-7151轉57407,或E-mail聯絡  - 隱私權政策聲明