博碩士論文 89426012 完整後設資料紀錄

DC 欄位 語言
DC.contributor工業管理研究所zh_TW
DC.creator尚靜宜zh_TW
DC.creatorChing-I Shangen_US
dc.date.accessioned2002-7-4T07:39:07Z
dc.date.available2002-7-4T07:39:07Z
dc.date.issued2002
dc.identifier.urihttp://ir.lib.ncu.edu.tw:88/thesis/view_etd.asp?URN=89426012
dc.contributor.department工業管理研究所zh_TW
DC.description國立中央大學zh_TW
DC.descriptionNational Central Universityen_US
dc.description.abstractThe fast changing environment and the complexity of projects has increased risk exposure. Traditional tools and technologies used in the process of risk management are not appropriate owning to its static analysis attribute. The project manager perceives the importance of taking prospective tools to face the challenge and keep the effort to control the project. This research proposes a project risk dynamics model to lead the project manager how to reallocate the contingency cost under the project scope change with a holistic view. By combining the process of risk management and system dynamics analysis in the project management, early signs of risk emergence, which would remain unperceived until problems would aggravate, can be identified in the project. Hence, the project manager can take better advantage offered by System Dynamics modeling, while enhancing the performance of the existing risk management process. Project scope change creates a series of effects and causes cost overruns that affect the schedule and lower performance in the long run. This research presents a risk dynamics framework that displays a trade-off process between cost and schedule and thereby attempts to revise the contingency cost and keep it under control. A pipeline work package is modeled and discussed.zh_TW
dc.description.abstractThe fast changing environment and the complexity of projects has increased risk exposure. Traditional tools and technologies used in the process of risk management are not appropriate owning to its static analysis attribute. The project manager perceives the importance of taking prospective tools to face the challenge and keep the effort to control the project. This research proposes a project risk dynamics model to lead the project manager how to reallocate the contingency cost under the project scope change with a holistic view. By combining the process of risk management and system dynamics analysis in the project management, early signs of risk emergence, which would remain unperceived until problems would aggravate, can be identified in the project. Hence, the project manager can take better advantage offered by System Dynamics modeling, while enhancing the performance of the existing risk management process. Project scope change creates a series of effects and causes cost overruns that affect the schedule and lower performance in the long run. This research presents a risk dynamics framework that displays a trade-off process between cost and schedule and thereby attempts to revise the contingency cost and keep it under control. A pipeline work package is modeled and discussed.en_US
DC.subject應變成本zh_TW
DC.subject專案範圍zh_TW
DC.subject系統動態zh_TW
DC.subjectContingency costen_US
DC.subjectSystem dynamicsen_US
DC.subjectProject scopeen_US
DC.title專案範圍變動下應變成本之重新配置:系統動態學在專案風險管理的應用zh_TW
dc.language.isozh-TWzh-TW
DC.titleSystem Dynamics in Project Risk Management:Reallocating the Contingency Cost under the Project Scope Changeen_US
DC.type博碩士論文zh_TW
DC.typethesisen_US
DC.publisherNational Central Universityen_US