dc.description.abstract | 公共工程施工履約爭議處理,存在跨專業知識領域、研究素材取得與方法選擇等高度困難門檻,因此,既往研究鮮少符合統計檢定,多為局部片段敘述性結論,對於具體爭議個案無法一體適用。本研究普查迄至2008年的上一個十年間,台灣高等法院(分院)之公共工程民事訴訟判決,擇取其中凡有一部理由可歸責於採購機關訟案共400件。藉由類目分析、對數線性模型與多元對應分析方法,探索事實審判決相關變數之關聯,並以視覺化輔助數據解析,將超過數百萬言之判決主文,化約成單張二維圖像,並同步指認具備客觀意義之訟案,從而跨越以往直觀取材逕自微觀的研究障礙,填補未能符合科學定義的空白。本研究主要發現如下:
一、 類目分析結合對數線性模型與多元對應分析方法,化繁為簡的邏輯對於治絲益棼的工程法務研究證實具體可行。
二、 工程專業機關較易涉訟,較之於非工程專業機關相對高出51%。採購法施行對縮短訴訟時間具有貢獻,冗長訴訟耗時之勝算比大幅下降近5倍之多;且影響司法實務朝向抑制廠商投機行為,與促進採購機關法律經濟思維發展。
三、 一審判決上訴維持率存有地域上之差異,給付類於北部36.85%,中部24.65%,南部64.94%;賠償類於北部63.15%;中部75.35%;南部35.06%。
| zh_TW |
dc.description.abstract | The construction dispute is an ancient issue, probably since the time of Hammurabi Code or even earlier. Nowadays, these issues have increasingly been a common social phenomenon in public works, and contribute to a major portion to legal practice. Existing studies regarding public works disputes and claims have drawn on small-scale cases to the exclusion of other cases and few have met the requirements of statistical tests. This study performs an investigation of a total of 400 cases of civil litigation in which owners lost their disputes in Taiwan High Courts and branches between 1999 and 2008. Category analysis coding is used to construct a Log-linear model for judgment decisions; this model is augmented by Multiple Correspondence Analysis to reduce judicial opinions of over 4 million words to a two-dimensional figure, allowing for visual interpretation and identifying specific cases for qualitative examination. The primary findings were: (1)the Government Procurement Law has contribute to shortening litigation times; (2)professional engineering agencies are easily involved in lawsuits, (3)the judgment affirmed of the First Instance review of court houses in different regions are different; (4)the social science methods provide a new channel for construction disputes research.
| en_US |
DC.subject | 公共工程 | zh_TW |
DC.subject | 施工履約爭議 | zh_TW |
DC.subject | 民事訴訟 | zh_TW |
DC.subject | 類目分析 | zh_TW |
DC.subject | 對數線性模型 | zh_TW |
DC.subject | 多元對應分析 | zh_TW |
DC.subject | Public Works | en_US |
DC.subject | Construction Contract Disputes | en_US |
DC.subject | Civil Litigation | en_US |
DC.subject | Catagorical Analyses | en_US |
DC.subject | Log-Linear Model | en_US |
DC.subject | Multiple Correspondence Analyses | en_US |
DC.title | 台灣公共工程施工履約爭議民事訴訟之研究-以可歸責於採購機關為核心 | zh_TW |
dc.language.iso | zh-TW | zh-TW |
DC.title | Quantitative and Visualized Interpretation of Public Works Civil Litigation Scenario of Fact Review in Taiwan | en_US |
DC.type | 博碩士論文 | zh_TW |
DC.type | thesis | en_US |
DC.publisher | National Central University | en_US |