dc.description.abstract | Dr. Feigenbaum is that after the evolution of quality control is to check the quality, manufacturing, design, management, habits out of the five stages. And the research team collected information construction to check the statistical analysis, that now we have reached the quality of management is "quality is out of habit, "the state; many are quality is used to "fake" out of many of our quality control Even the first phase of "quality is to check out"are not met.
Manufacturers have the obligation according to the drawings, to confirm whether firms according to the drawings, must be confirmed by examining the mechanism. Vendor or the implementation of inspection supervision unit needs to leave evidence. The implementation of self-examination by the research firm, found that the inspection standards and supervision plan contract or does not comply, some workers have applied for items not yet completed the implementation plan of the form, at the same time check the time the project will not be the same inspection and approval, Lack of correlation of field inspection items are judged to be qualified, the situation will actually check the value of the field did not complete any items determined to be qualified, not running checks that the value of complete physical inspection and judged to be qualified, the value of checking out the check and the actual implementation of Operation of the logic does not match the contents of checks without completing any forms or signature stamp, not the actual implementation review officer shall review the operation signature, seal, etc. ... 30 missing, not self-examination of the situation to implement, can be quite serious.
By analyzing the causes of the lack of open, to abolish a certain amount of the following self-checking mechanism, the development of information system construction inspection, improve supervision, supervision, checking skills, engineering ethics and moral education to strengthen ... of 11 recommendations to improve the measures, expected to fully implement Construction-related inspection work, in order to achieve the establishment of three quality control mechanism to upgrade the quality of public works purposes.
| en_US |