參考文獻 |
英文文獻
Archimède, B., Charbonnaud, P., and Mercier, N., “Evaluation of Multisite Distributed Schedule with Perturbed Virtual Job shops”, Production planning and Control, Vol. 14, pp. 55-67, 2003.
Abbadie, A., Favier, S., Giroud, C., and Billon, T., “Investigation of copper removal efficiency on reclaimed wafers with HF-based solutions”, Microelectronic Engineering, Vol. 71, No. 3, pp. 310-320, February 2004.
Ayres, R., “Eco-efficiency, asset recovery and remanufacturing”, European Management Journal, Vol. 15, No. 5, pp. 557-574, October 1997.
Boulaksil, Y., Grunow, M., and Fransoo, J. C. “Capacity flexibility allocation in an outsourced supply chain with reservation”, International Journal of Production Economics, Vol. 129, No. 1, pp. 111-118, January 2011.
Beamon, B. M., “Supply chain design and analysis Models and methods”, International Journal of Production Economics, Vol. 55, No. 3, pp. 281-294, April 1988.
Bakal, S. I., and Akcali, E., “Effects of Random Yield in Remanufacturing with Price-Sensitive Supply and Demand”, Production and Operations Management, Vol. 15, No. 3 pp. 407-420, 2006.
Bauhuis, G. J., Mulder, P., Haverkamp, E. J., Schermer, J. J, Bongers, E., Oomen, G., Kostler, W., and Strobl, G., “Wafer reuse for repeated growth of III–V solar cells”, Research and Applications, Vol. 18, pp. 155-159, Apple 2010.
Bermon, S., and Hood, S., “Capacity optimization planning system(CAPS)”, Interfaces, Vol. 29, No. 5, pp. 31-50, 1999.
Cohen, J., Statistical power analysis for the behavioral sciences (2nd ed.), Lawrence Erlbaum Associates , Hillsdale, 1988.
Dowlatshahi, S., “A strategic framework for the design and implementation of remanufacturing operations in reverse logistics”, International Journal of Production Research, Vol. 43, No. 16, pp. 3455-3480, 2005.
Ferguson, M. E., and Toktay, L. B., “The Effect of Competition on Recovery Strategies”, Production and Operations Management, Vol. 15, No. 3, pp. 351-368, September 2006.
Gauter, S., Moudakir, T., Patriarche, G., Rogers, D.J., Sandana, V. E., Hosseini Teherani, F., Bove, P., El Gmili, Y., Pantzas, K., Sundaram, S., Troadec, D., Voss, P. L., Razeghi, M., and Ougazzaden, A., “Structural and compositional characterization of MOVPE GaN thin films transferred from sapphire to glass substrates using chemical lift-off and room temperature direct wafer bonding and GaN wafer scale MOVPE growth on ZnO-buffered sapphire”, Journal of Crystal Growth, Vol. 370, pp. 63-67, September 2013.
Hsu, J. W., Lo, H. L., Pan, C. C., Chen, Y. M., and Hsieh, T. K., “Test Wafer Control System in 300mm FAB”, IEEE Transactions on Semiconductor Manufacturing, pp. 33-36, 2004.
Jeffery, K. C., and Alberto, M. U., “A set covering formulation for agile capacity planning within supply chains”, International Journal of Production Economics, Vol. 95, No. 2, pp. 139-149, February 2005.
Karabuk, S., and Wu, S. D., “Coordinating strategic capacity planning in the semiconductor industry”, Operations Research, Vol. 51, No. 6, pp. 839-849, November 2003.
Liu, Y., Guy, O. J., Patel, J., Ashraf, H., and Knight, N., “Refractive index graded anti-reflection coating for solar cells based on low cost reclaimed silicon”, Microelectronic Engineering, Vol. 110, pp. 418-421, March 2013.
Lawrence, J. E., Cupertino, and Calif, “Method of Reclaiming A Semiconductor Wafer”, United States Patent, No. 3,923,567, December 1975.
Lee, J. E., Gen, M., and Rhee, K. G., “Network model and optimization of reverse logistics by hybrid genetic Algorithm”, Computers and Industrial Engineering, Vol. 56, No. 3, pp. 951-964, 2009.
Liang, Y., Pokharel, S., and Lim, G. H., “Pricing used products for remanufacturing”, European Journal of Operational Research, Vol. 193, No. 2, pp. 390-395, 2009.
Li, H., Hendry, L., and Teunter, R., “A strategic capacity allocation model for a complex supply chain: Formulation and solution approach comparison”, International Journal of Production Economics, Vol. 121, No. 2, pp. 505-518, October 2009.
Milne, R. J., and Wang, C. T., “Enhancing mathematical programming models to account for demand priorities increasing as a function of delivery date”, Journal of Industrial and Production Engineering, Vol. 31, No. 1, pp. 51-63, 2014.
Ovacik, I. M., and Weng, W., “A framework for Supply chain management in Semiconductor Manufacturing Industry”, IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp. 47-50, 1995.
Ostlin, J., Sundin, E., and Bjorkman, M., “Importance of closed-loop supply chain relationships for product remanufacturing”, International Journal Production Economics, Vol. 115, No. 2, pp. 336-348, February 2008.
Sinha, S., and Sarmah, S. P., “Supply-chain coordination model with insufficient production capacity and option for outsourcing”, Original Research Article Mathematical and Computer Modelling, Vol. 46, No. 11-12, pp. 1442-1452, December 2007.
Swaminathan, M., and Tayur, R., “Models for Supply Chains in E-Business”, Management Science, Vol. 49, No. 10, pp. 1387-1406, October 2003.
Tsui, B. Y., and Fang, K. L., “A Novel Wafer Reclaim Method for Amorphous SiC and Carbon Doped Oxide Films”, IEEE Transactions on Semiconductor Manufacturing, Vol. 18, No. 4, November 2005.
Toktay, L. B., and Wei, D., “Cost Allocation in Manufacturing–Remanufacturing Operations”, Production and Operations Management Society, Vol. 20, No. 6, pp. 841-847, March 2011.
Walanabc, A., Kobayahi, T., Egi, T., and Youshida, T., “Continuous and Independent Monitor Wafer Reduction in DREAM Fab”, IEEE Transactions on Semiconductor Manufacturing, pp. 303-306, 1999.
中文文獻
蘇思潔,「LED產業供應鏈之策略性規劃」,國立中央大學,碩士論文,2012年。
洪福益,「台灣矽晶圓再生產業之經營與發展研究」,清華大學,碩士論文,2008年。
|