摘要(英) |
In recent years, with the continuous development of high-tech industry and constant advancement of process technologies, the new processes and new chemicals used in the semi-conductor plants are getting more complicated and dangerous. Thus, the safety and health operation management and emergency response of the unexpected accident in the plant require more manpower and resource to guarantee the safety in the plant area and reduce the probability of the unexpected disaster and accident occurrence. That is why the Emergency Response Team (ERT) is set up in the plant to respond to the disaster and accident, and perform first-aid and the related operations. Besides guaranteeing the plant safety and preventing the unexpected disasters and accidents, the attendance of ERT members will also indirectly affect their working efficiency and disaster recovery operation in the safety maintenance. Currently the ERT members work in three shifts system. Moreover, the semi-conductor plants are mostly in 24-hour operation. In terms of the manpower assignment, the managers mostly make decision based on the experience, and carry out manual scheduling operation. This deficient method fails to achieve the fair principle, and consumes much time in operation.
For above issues, the study takes a semi-conductor plant located in Hsinchu Science Park as an example, by which the model developed in the study is proven to be reasonable and practical. It constructs a mathematic optimization model and calculates solution by using LINGO-9.0 software package. In this way, it works out the most even attendance schedule and manpower assignment optimization for the ERT members. The study results show the model developed in the study is more efficient than the manual assignment based on experience, which also achieves the fairness in the attendance schedule. It can provide reference for the high-tech plants in the practice of ERT manpower assignment.
|
參考文獻 |
1.洪傳譜,「高科技廠房先進救災設備配合緊急應變程序之研究」,國立交通大學,碩士論文,2005年。
2.徐孝璋,「緊急應變訓練模式設計與探討」,國立交通大學,碩士論文,2013年。
3.張克誠,「災後搶修設計工作人力指派最佳化之研究」,國立中央大學,碩士論文,2007年。
4.張立偉,「災後工程緊急搶修作業排程之研究」,私立淡江大學,碩士論文,2001 年
5.陳彥夫,「半導體與光電廠緊急應變能力調查」,私立高雄醫學大學,碩士論文,2001年。
6.陳家慶,「新竹科學工業園區緊急應變機制建立規劃」,國立交通大學,碩士論文,2006年。
7.陳建銘,「某半導體廠的化學品洩漏預防及其緊急應變探討」,國立交通大學,碩士論文,2013年。
8.馮宣皓,「緊急應變人員訓練落實度調查-以半導體廠為例」,國立交通大學,碩士論文,2006年。
9.楊光宗,「警察派出所人員排班問題之研究」,國立海洋大學,碩士論文,2002年。
10.賴世若,「以整數規劃與模擬求解服務業班別排程問題」,私立中原大學,碩士論文,1996年。
11.顏上堯、婁自強、陳佳宏,「警察勤務編排模式之研究」,中央警察大學交通學報,第三卷,第二期,頁35-54,2003年。
12.顏上堯、官明郎,「設計作業人員指派最佳決策模式之研究」,中國土木水利工程學刊,第十八卷,第十四期,頁135-144,2006年。
13.顏上堯,施佑林,呂理卿,「營建人機作業指派最佳決策模式之研究」,技術學刊,第二十三卷,第二期,頁137-147,2008年。
14.Azaiez, M.N. and Al Sharif, S.S., “A 0-1 Goal Programming Model For Nurse Scheduling”, Computers and Operations Research, Vol. 32, No. 3, pp.491-507, 2005.
15.Ford, J.K. and Schmidt, A.M., “ Emergency response training: Strategy for enhancing real-world performance”, Journal of Hazardous Material, No.75, pp.195-215, 2000.
16.Kowalski, K.M., “A human component to consider in your emergency management plan:The critical incident stress factor”, Safety Science, No.20 , pp.115-123, 1995.
17.Patterson, J.H., “A Comparision of Exact Approaches Solving the Multiple Constrained Resource Project Scheduling Problem”, Management Science, Vol. 30, No. 7, pp. 854-867, 1984.
18.Tsai, C.C. and Lee, C.J.,“ Optimization of nurse scheduling problem with a two-stage mathematical programming model”, Asia Pacific Management Review,Vol. 15, No.4, pp. 503-516, 2010.
19.Wallace, W.A., and Balogh, F.D., “Decision Support Systems Disaster Management”. Public Administration Review. Vol.45, pp.134-147, 1985.
20.Yan, S. and Huo, C.H., “A Optimization of Multiple Objective Gate Assignments,” Transportation Research, Vol. 35A, pp. 413~432 , 2001.
21.Yan, S. and Chen, H.L., “A Scheduling Model and a Solution Algorithm for Inter-city Bus Carriers, ” Transportation Research, Vol. 36A, pp. 805~825 , 2002.
|