參考文獻 |
Akyiaa M. Hosten, James Bryce, Lucy P. Priddy, Gerardo W. Flintsch, Edgar de León Izeppi, Wayne O. Nelson,“Improving Network Condition with Preventive Maintenance – A Pavement Management System Case Study in Christiansburg, VA.” Proceeding of the TRB 92nd Annual Meeting. No. 13-27. (2013).
Ahmad, Z., Wasli, M. M. P., Fauzi, M. S. H. M., Jamil, M. R. M. and Siraj, S. “Fuzzy Delphi Analysis for Future Environmental Education Using Interactive Animation.” 2nd International Seminar Teaching Excellence and Innovation, Malaya. (2014).
Ashok, A., K M, T., Vincent, S., “Pavement Rehabilitation Prioritization Using Analytical Hierarchy Process (AHP).” IJIRSET, Vol. 5, Issue 5, 6858-6865, India. (2016).
ASTM Standard D6433-16, “Standard Practice of Roads and Parking Lots Pavement Condition Index Surveys.” American Society of Testing and Materials, ASTM International, USA. (2016).
ASTM Standard E1274-03, “Standard Test Method for Measuring Pavement Roughness Using a Profilograph.” American Society of Testing and Materials, ASTM International, USA. (2012).
ASTM Standard E1926-08, “Standard Practice for Computing International Roughness Index of Roads from Longitudinal Profile Measurements.” American Society of Testing and Materials, ASTM International, USA. (2015).
“City of Glendale, Arizona Pavement Management Program.” Executive summary report. Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019), Arizona (2013)
Farashah, M.K. and Tighe, S.L. “Development Practices for Municipal Pavement Management Systems Application.” Conference of the Transportation Association of Canada, Montreal, Quebec, Canada. (2014).
Gonzalez, E., Liu, J., Liu, W., Zhang, Z., Murphy, M., O’Connor, J.“AHP-based approach to prioritizing resources for highway routine maintenance.” Optimizing Resource Allocations for Highway Routine Maintenance. 0-6623. (2012).
Ishikawa, A., Amagasa,M., Shiga,T., Tomizawa, G., Tatsuta,R., and Mieno,H., ”The Max-Min Delphi Method and Fuzzy Delphi Method via Fuzzy Integration.”, Fuzzy Sets and Systems, 1993.
Liu, W. K. “Application of the Fuzzy Delphi Method and the Fuzzy Analytic Hierarchy Process for the Managerial Competence of Multinational Corporation Executives.” International Journal of e-Education, e-Business, e-Management and e-Learning, Vol. 3, No. 4, Taiwan. (2013).
“Maintenance Rating Program Handbook, Data Collection for Maintenance Rating Program.” Florida Department of Transportation, Office of Maintenance, Florida State, USA.
Mecham, F., Gibson, B., Hill, A., Compton, L., and Arnold, D., “Pavement Management Report.” (2015).
Meyer, D. “US Domestic Scan Program: Best Practices in Transportation Asset Management.” National Cooperative Highway Research Program, Project 20- 68.
Moazami, D., Behbahani, H., Muniandy, R. “ Pavement rehabilitation and maintenance prioritization of urban roads using fuzzy logic.” Expert Systems with Applications 38 (2011) 12869–12879. (2011).
“NYSDOT Maintenace and Operations Firs Guidance.” New York State Department of Transportation. (2004).
Mohanmad, S. N. A., Embi, M. A. and Nordin, N. “Determining e-Portfolio Elements in Learning Process Using Fuzzy Delphi Analysis.” International Education Studies, Vol. 8, No. 9, Malaysia. (2015).
Ou Yang, Y.P., Shieh, H.M., Leu, J.D. and Tzeng, G.H., “A Novel Hybrid MCDM Model Combined with DEMATEL and ANP with Applications.” (2008).
Prakasan, A. C., Tiwari, D., Shah, Y. U., and Parida, M.(2015).“Pavement maintenance prioritization of urban roads using analytical hierarchy process.” ISSN 1997-1400Int. J. Pavement Res. Technol. 8(2):112-122.
Saaty, T. l. “The Analytic Network Process.”, Iranian Journal of Operations Research, v1, 2008.
Scullion, T. and Smith, R., “TxDOT’s Pavement Management Information System: Current Status and Future Directions.” Texas Department of Transportation. FHWA/TX-98/1420-S. (1997).
Shah, Y. U., Jain, S. S., Jain, M. K., Tiwari, D., “A Critical Review of Prioritization Models for Pavement Maintenance Management Decisions.” 2nd International Conference on Emerging Trends in Engineering & Technology, New Delhi. (2013).
Shah, Y., Jain, S.S. and Parida, M. “Evaluation of Prioritization Methods for Effective Pavement Maintenance.” International Journal of Pavement Engineering, 15(3), pp.238-250. (2014).
Torres-Machi, C., Chamorro, A., Videla, C., Pellicer, E., and Yepes, V., “An Iterative Approach for the Optimization of Pavement Maintenance Management at the Network Level.” Hindawi Publishing Corporation The Scientific World Journal, Spain. (2014).
“WSDOT Maintenance Accountability Process Manual. Washington State Department of Transportation.” Field Operations Support Service Center. (2008).
Zhanmin Zhang, Michael R.Murphy, “Pilot Implementation of a Web-based GIS System to Provide Information for Pavement Maintenance Decision-Making.” Aweb-Based Pavement Performance and Maintenance Mamagement amd Gis Map Ping System for Easy Access to Pavement Condition Information : Final Report. (2013).
「あきる野市道路舗装維持補修の優先順位設定評価基準都市」,都市整備部管理課。
「広島市舗装修繕マニュアル」,道路交通局道路部道路課,平成27年。
「舗装の維持管理について」,宮崎県,県土整備部,道路保全課,平成27年。
「舗装維持管理ガイドライン」,長崎県土木部道路維持課,平成27年。
「鋪裝維持管理計畫(案)」,熊本縣土木部道路都市局道路保全課,平成24年。
ニチレキ株式会社
角川浩二、榎戸宏樹,「利用者費用を考慮した道路舗装の維持修繕の改善—維持管理指数(MCI)に基づく維持修繕基準の見直し‐」,土木學會第55回年次學術講演會,平成12年。
京都府道路施設維持管理實施計畫(修訂)。
舖裝試驗法便覽,日本道路協會,(1996)。
王志文,「彰化縣市區道路鋪面品質影響因素之研究--模糊層級分析法之應用」,國立中興大學應用經濟學系所,碩士論文,(2007)。
「市區道路鋪面養護作業手冊」,內政部營建署,(2002)。
佘品蓁,「道路設計因子對行車碳排放影響之研究」,國立中央大學土木工程學系,碩士論文,(2007)。
吳俊宏,「氣候變遷對國道一號柔性路面之衝擊」,國立高雄第一科技大學運籌管理研究所,碩士論文, (2011)。
吳姿樺,「結合DEMATEL與DANP法探討中部高快速道路績效之多評準決策」,碩士論文,逢甲大學運輸科技與管理學系,(2013)。
宋宗勳,「柔性鋪面狀況指標檢測之研究」,碩士論文,國立中央大學土木工程學系,(2004)。
宋柏勛,「資產管理機制應用於國道柔性鋪面維護之研究—以國道三號為例」,博士論文,國立中央大學土木工程學系,(2010)。
李冠頡,「應用DEMATEL及ANP決策方法於自行車道系統評估改善之研究-以桃園縣自行車道系統為例」,國立中央大學土木工程學系,碩士論文,(2010)。
周宏宇,「綠色拆屋評估指標系統之研究」,國立中央大學土木工程學系,碩士論文,(2009)。
林宗賢,「重車與環境因素對柔性鋪面的影響」,國立中央大學土木工程學系,碩士論文,(2003)。
林岳樺,「利用決策試驗與實驗評估法分析業主之專案組織結構與資源配置」,國立交通大學土木工程系所,碩士論文,(2009)。
林昆虎,「市區道路網級鋪面管理架構建立之研究-以臺北市為例」,博士論文,國立中央大學土木工程學系,(2015)。
林珈汶,「臺灣地區建立永續透水人行道之初步探討」,碩士論文,逢甲大學運輸科技與管理學系碩士班,(2013)。
林鶴斯,「建築資訊模型導入地下管線管理與精進道路養護之策略研究」,博士論文,國立中央大學土木工程學系,(2016)。
邱俊唐,「高雄港在亞太地區轉運競爭力之研究」,碩士論文,國立中央大學土木工程學系,(2007)。
「柔性鋪面損壞調查手冊」,內政部營建署,(2002)。
洪境聰,「以績效為基礎的公路養護組織與制度之研究」,博士論文,國立中央大學土木工程學系,(2007)。
洪境聰,「柔性鋪面現況服務能力指標與預測模式建立之研究」,碩士論文,國立中央大學土木工程學系,(2000)。
張家瑞、陳韋倫、何宗運,「整合DEMATEL及ANP方法發展臺灣地區道路系統之養護評級計畫」,中華鋪面工程學會會刊,第十卷,第二期,第25-36頁,(2012)。
張慈芸,「大客車污染排放及耗能之關鍵因素分析」,逢甲大學交通工程與管理所,碩士論文,(2010)。
張馨文,「應用分析層級程序法評估機場鋪面管理系統之關鍵因子」,國立成功大學土木工程研究所,碩士論文,(2007)。
曹榮軒,「建置市區道路鋪面維護管理系統之研究-以桃園縣中壢市為例」,碩士論文,國立中央大學土木工程學系,(2012)。
許時豪,「柔性鋪面養護與維修技術智慧型諮詢系統雛型之建立」,淡江大學土木工程研究所,碩士論文,(2001)。
陳克斌,「綜合性指標在鋪面工程之應用」,淡江大學土木工程研究所,碩士論文,(2002)。
陳厚邑,「影像定位技術應用於國道巡查作業之研究」,碩士論文,國立中央大學土木工程學系,(2013)。
陳建達,「自動化鋪面平整度量測分析與破壞影像偵測系統之研究」,博士論文,國立中央大學土木工程學系,(2009)。
陳惠華,「重車對路面結構之影響」, 國立中央大學土木工程學系,碩士論文, (1998)。
傅介元,「市區道路鋪面維護管理之研究(以台北市主次要道路為例)」,碩士論文,國立中央大學土木工程學系,(2003)。
彭志鴻,「臺灣地區鋪面管理系統平台規劃與建置之研究」,博士論文,國立中央大學土木工程學系,(2012)。
黃全成,「都會型道路管理機制躍升之研究—以桃園縣政府為例」,碩士論文,國立中央大學土木工程學系,(2013)。
黃俊達,「 市區道路維護預算之決策輔助機制-以高雄市部分道路為案例」,碩士論文, 國立高雄第一科技大學營建工程系,高雄,(2008)。
管孟忠、陳以明、邵秀文,「應用混合式多評準決策方法建構技術創新專案管理能力評價模式」,管理資訊計算,第二卷,第一期,第199-220頁,(2013)。
蔡易縉,「最佳公路鋪面維護規劃」,國立成功大學土木工程研究所,碩士論文,台南,(2014)。
蔡品寬,「建構鋪面維護工程履歷於鋪面管理系統之研究—以桃園縣政府為例」,博士論文,國立中央大學土木工程學系,(2011)。
衛萬明,「因應永續成長原則下之都市生活品質指標建立與規劃發展策略之研究」,人文與社會科學簡訊,第十六卷,第二期,第78-86頁,(2015)。
鄭晟彬,「應用層級分析法(AHP)探討交通事故傷害之肇因」,國立勤益科技大學工業工程與管理所,碩士論文,(2012)。
蕭岳誌、張弘旻、冼永豪等人,「應用層級分析法(AHP)探討市區道路人行道無障礙評分標準」,科技整合管理第19研討會論文集,第562-573頁,(2016)。
謝博帆,「應用多評準決策之DANP方法評估濕地生態旅遊資源滿意度—以七股濕地為例」,碩士論文,國立中山大學海洋環境及工程學系,(2014)。
魏光譽,「以平衡計分卡建構縣市政府道路養護管理指標之研究」,碩士論文,國立中央大學土木工程學系,(2014)。
羅健文、邱良忠,「應用模糊德爾菲法與分析網路程序法建立綠色運輸與遊憩路線規劃指標之研究」,臺灣土地研究,第十八卷,第二期,第81-108頁,(2015)。
蘇家弘,「以鋪面工程生命週期建構全國鋪面維護管理系統架構之研究」,碩士論文,國立中央大學土木工程學系,(2011)。 |