參考文獻 |
1. Arenas, D., Pellegrini, P., Hanafi, S., & Rodriguez, J., “Timetable Optimization during Railway Infrastructure Maintenance”, In 7th International Conference on Railway Operations Modelling and Analysis-Rail Lille, 2017.
2. Chen, R., Qian, X., Miao, L., & Ukkusuri, S. V., “Optimal charging facility location and capacity for electric vehicles considering route choice and charging time equilibrium”, Computers & Operations Research, Vol. 113, 2020.
3. Dekker, R., “Applications of maintenance optimization models: a review and analysis”, Reliability Engineering and System Safety, Vol. 51, Issue. 3, pp. 229- 240, 1996.
4. Eiselt, H. A., & Marianov, V., “A bi-objective model for the location of landfills for municipal solid waste”, European Journal of Operational Research, Vol. 235, Issue. 1, pp.187-194, 2014.
5. Gopalan, R., “The Aircraft Maintenance Base Location Problem”, European Journal of Operational Research, Vol. 236, Issue. 2, pp.634-642, 2014.
6. Gorman, M. F., & Kanet, J. J., “Formulation and Solution Approaches to the Rail Maintenance Production Gang Scheduling Problem”, Journal of Transportation Engineering, Vol. 136, Issue. 8, 2010.
7. Guo, R., Han, B. M., & Wang, F. T., “Integral Optimization Model for Scheduling Railway Maintenance”, Journal of Transportation Systems Engineering and Information Technology, Vol. 13, Issue. 4, pp. 149-156, 2013.
8. Hakimi, S. L., “Optimum locations of switching centers and the absolute centers and medians of a graph”, Operations Research, Vol. 12, Issue. 3, pp.450-459, 1964.
9. Kiefer, A., Schilde, M., & Doerner, K. F., “Scheduling of maintenance work of a large-scale tramway network”, European Journal of Operational Research, Vol. 270, Issue. 3, pp. 1158-1170, 2018.
10. Kris T .Lieckens, Pieter J. Colen, & Marc R. Lambrecht., “Optimization of a stochastic remanufacturing network with an exchange option”, Decision Support Systems, Vol. 54, Issue. 4, pp.1548-1557, 2013.
11. Liden, T., “Railway infrastructure maintenance-a survey of planning problems and conducted research”, Transportation Research Procedia, Vol. 10, pp. 574-583, 2015.
12. Peng, F., & Ouyang, Y., “Optimal Clustering of Railroad Track Maintenance Jobs”, Computer-Aided Civil and Infrastructure Engineering, Vol. 29, pp. 235-247, 2014.
13. Pour, S. M., Drake, J. H., Ejlertsen, L. S., Rasmussen, K. M., & Burke, E. K., “A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem”, European Journal of Operational Research, Vol. 269, Issue. 1, pp. 341-352, 2018.
14. Rappold, J. A., & Van Roo, B. D., “Designing multi-echelon service parts networks with finite repair capacity”, European Journal of Operational Research, Vol. 199, Issue. 3, pp. 781-792, 2009.
15. Soh, S. S., Radzi, N. H., & Haron, H., “Review on scheduling techniques of preventive maintenance activities of railway”, Fourth International Conference on Computational Intelligence, Modelling and Simulation, 2012.
16. Sriskandarajah, C., Jardine, A. K. S., & Chan, C. K., “Maintenance scheduling of rolling stock using a genetic algorithms”, Journal of the Operational Research Society, Vol. 49, Issue. 11, pp. 1130-1145, 1998.
17. Su, Z., Jamshidi, A., Núñez, A., Baldi, S., & De Schutter, B., “Integrated condition- based track maintenance planning and crew scheduling of railway networks”, Transportation Research Part C: Emerging Technologies, Vol. 105, pp. 386-391, 2019.
18. Weber, A., “Theory of Location of Industries, Translated with an introduction and notes by Carl J, by Russel & Russel”, New York. 1909
19. Working, H, & Hotelling, H., “Applications of the theory of error to the interpretation of trends”, Journal of the American Statistical Association, Vol. 24, Issue. 165, pp.73-85, 1929.
20. Xie, W., Ouyang, Y., & Somani, K, “Optimizing Location and Capacity for Multiple Typesof Locomotive Maintenance Shops”, Computer-Aided Civil and Infrastructure Engineering, Vol. 31, pp.163-175, 2016.
21. You, M., Xiao, Y., Zhang, S., Yang, P., & Zhou, S., “Optimal mathematical programming for the warehouse location problem with Euclidean distance linearization”, Computers & Industrial Engineering, Vol. 136, pp. 70-79, 2019.
22. Zhang, C., Gao, Y., Yang, L., Gao, Z., & Qi, J., “Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation”, Transportation Research Part B: Methodological, Vol. 134, pp. 64-92, 2020.
23. 吳權泰,「馬可夫過程的預防維護模型之研究」,國立中央大學機械工程研究所,碩士論文,2003。
24. 林志棟、張岸礕、杜逸全、高潓璇,「公共工程全命週期營運維護階段品質管理之探討」,社團法人中華鋪面工程學會,2010。
25. 施亮輝、周振發、王德民,「捷運及鐵路維修機廠規劃及先進維修設備應用探討」,中華技術期刊,第 107 期,92-103 頁,2015。
26. 陳宏偉,「捷運設備維護保養排程最佳化之研究」,國立中央大學土木工程學系,碩士論文,2019。
27. 陳明和,「應用基因演算法及模糊理論於建築機電設備維護策略最佳化之研究」,國立中央大學土木工程研究所,碩士論文,2007。
28. 陳韻如,「電動機車電池交換站選址最佳化,隨機離散型事件模擬之應用」, 國立臺灣大學土木工程學研究所,碩士論文,2018。
29. 黃柏瑋,「市區公車場站選址暨電力補充設施配置最佳化」,國立中央大學土木工程學系,碩士論文,2019。
30. 蔡燕純,「應用馬可夫預防維護模型於維修保養策略之探討」,國立中央大學機械工程學系,碩士論文,2004。
31. 顏上堯、林妤玲、陳怡君,「最佳化報廢機車回收場區位途程模式之研究」, 中國土木水利工程學刊,第 32 卷,第 2 期, 135-146 頁,2020。 |