摘要(英) |
Taoyuan actively promoted the road-smoothing project since it upgraded to a special municipality. The project implements with a budget of NT 10 billion in 8 years, and has cooperated with the Road Quality Improving project from the Forward-kooking Infrastructure Planning, 2017. Select appropriate road sections in each district to cooperate with policy planning and report to the central government for subsidies. Include the forward-looking road quality project that has subsidised by the central government, to the Taoyuan road-smoothing project result, and with the annual repair work, to make Taoyuan citizens satisfied with the improvement of the road environment.
In the face of the declining birthrate and the gradual stepping into an advanced and super-aged society, the road quality improvement planning no longer focuses solely on road leveling. Instead, by planning the urban and rural traffic environment, creating a friendly human-oriented space road, creating a humane, affinity, reliable, comfortable and healthy environment, and integrating traditional transportation construction, while taking into account economy, efficiency, convenience, and safety characteristics, greatly improve the quality of road services, and achieve the vision of implementing the responsibility of universal care. In order to establish the road quality improvement planning version 2.0, this study uses hierarchical analysis, test questionnaires, expert questionnaires, verification questionnaires, etc., through investigations and interviews of industry experts and government agencies. Established 4 evaluation criteria and 9 quantitative indicators of the Road Quality Improvement Planning version 2.0, and then use the Taoyuan City Government to obtain subsidies for the forward-looking infrastructure construction case for verification and analysis.
In the road quality improvement planning version 2.0 established by this study, energy conservation, environmental protection and circular economy indicators takes 11% of total weight. In recent years, the policy orientation has focused on sustainable development, circular economy and energy saving and carbon reduction as the goal. Therefore, this study discusses the refined strategy of the application of circular economy in public projects, analyze the engineering characteristics and put forward the results of the effectiveness test for the application of slag steel pellets, planed asphalt concrete pellets and incineration pellets, etc. Additionally, we use a material supply plan to trace the source control of recycled materials: establish a circular economy management platform to track and manage the flow of circular economy materials in Taoyuan City Government’s public projects.
From forward-looking infrastructure to the application of circular economy to public projects, the main factors for its effective implementation include the most favorable criteria, selection of excellent manufacturers, and effective contracts. It makes the agency’s performance targets clear, promote manufacturers to improve quality, give them an environment for innovation, research and development, and save expenditures. This study also proposes technical and managerial performance indicators. For some roads in Qingpu, Taoyuan, the effectiveness contract execution model has been successfully implemented, using the effectiveness contract outsourcing strategy for maintenance projects.
Using the road asset management and maintenance management platform to integrate the relevant operating system of the Taoyuan City Government’s road engineering and collect historical data of road engineering. Finally, established a real-time management system and cooperate platform, its functions is to sort road maintenance needs, integrate road maintenance into effective contract tenders and project budgeting recommendations, as a reference for decision-making. |
參考文獻 |
1. Darter, Michael I., and Mohamed Y. Shahin. "Pavement rehabilitation: Identifying the need." Journal of Transportation Engineering 106.1 (1980).
2. ASTM, D. "Standard practice for roads and parking lots pavement condition index surveys." (2011).
3. ASTM. "Standard test method for airport pavement condition index surveys." Designation D5340–12 (2012).
4. Irick, Paul. "PRESENT SERVICEABILITY RATING AND PRESENT SERVICEABILITY INDEX CONCEPTS." Special Report-Highway Research Board 133 (1973): 8.
5. ASTM E1926-08. "Standard practice for computing international roughness index of roads from longitudinal profile measurements." ASTM International (2008).
6. 周家蓓、李怡萱,「鋪面平坦度檢測標準之探討」,中華技術,65,35-44,2005。
7. 臺北市交通管制工程處,「九十一年度台北市交通流量及特性調查」,1-4,2002。
8. 內政部,「前瞻基礎建設-城鄉建設提升道路品質計畫(核定本)」,36-38,2017。
9. 宋柏勛,「資產管理機制應用於國道柔性鋪面維護之研究-以國道三號為例」,國立中央大學,碩士論文,2009。
10. 宋宗勳,「柔性鋪面狀況指標檢測之研究」,國立中央大學,碩士論文,2004。
11. 林元生,「智慧型鋪面檢測車應用於鋪面平坦度之研究」,國立中央大學,碩士論文,2004。
12. 姚志廷,「以國際糙度指標分析網級柔性鋪面養護最適化之研究」,國立中央大學,碩士論文,2001。
13. 何旻哲,「國道高速公路平坦度檢測及舒適性指標分析之研究」,國立中央大學,碩士論文,2013。
14. Lin, Jyh-Dong, and Min-Che Ho. "A comprehensive analysis on the pavement condition indices of freeways and the establishment of a pavement management system." Journal of Traffic and Transportation Engineering (English Edition) 3.5 (2016): 456-464.
15. 張家瑞,「建立台灣瀝青路面網級養護管理系統-以公路局中壢工務段為例」,國立中央大學,博士論文,2001。
16. 陳永林,「HDM-4運用於國內高速公路養護管理之研究」,國立中央大學,碩士論文,2003。
17. 廖文偉,「瀝青刨除回收料應用於道路路基底層之研究」。國立中興大學,碩士論文,2011。
18. 徐登文、廖文偉、劉柏宏(2012)。過度老化瀝青混凝土刨除回收料應用於道路底層及基層可行性之研究,鋪面工程,10.4,1-10。
19. 杜嘉崇、葉榮晟、李艾倫,「刨除料應用於排水瀝青混凝土之研究」,鋪面工程,11.1,67-72,2013。
20. 鄭清元,「電弧爐煉鋼爐碴特性及取代混凝土粗骨材之研究」,國立中央大學,博士論文,2000。
21. 廖啟州,黃偉慶,蘇茂豐. 「廢鑄砂與電弧爐碴混合料取代瀝青混凝土粒料成效探討」,工業污染防治,103(2007):23-36.
22. 林志棟、林凱悅、呂柏璋,「氧化碴再利用於瀝青混凝土之探討」,鋪面工程,9(4),57-64,2011。
23. 蘇鈺荃,「電弧爐渣重金屬溶出特性及作為級配材料之可行性研究」,國立成功大學,碩士論文,2011。
24. 葉祥春,「垃圾焚化爐底碴應用於道路基底層之研究」,國立成功大學,碩士論文,2003。
25. 雷揚中,「焚化爐底碴應用於道路工程之研究」,國立中央大學,碩士論文,2004。
26. 陳建旭、郭柏宏、黃隆昇,「分析底碴再生粒料應用於瀝青混凝土之工程及環境特性」,中國土木水利工程學刊,24(1),25-32,2012。
27. 黃錦明,「建立一般廢棄物焚化底渣再利用決策方法論之研究」,國立臺灣大學,碩士論文,2006。
28. 林志棟、梁世賓、宋柏勛、孫世勤,「台灣地區焚化爐底渣在利用現況分析」,鋪面工程,6(4),69-80,2008。
29. 王聖堯,「焚化底渣濕篩污泥再利用作為控制性低強度材料之研究」,國立成功大學,碩士論文,2010。
30. 張孝全,「垃圾焚化底渣全資源化應用作為CLSM粒料之可行性研究」,中原大學,碩士論文,2016。
31. Department of Transportation, Federal Highway Administration, Office of Development, Implementation Division. "Soil stabilization in pavement structures: a user′s manual." (1980): 8.
32. 歐立宸,「焚化再生粒料穩定桃園紅土配比設計的控制條件研究」,中原大學,碩士論文,2019。
33. 彭凱烽、楊智斌,「成效式契約應用於公有建築物能源設備維護管理之案例分析」,營建管理季刊,94,37-55,2013。
34. 譚詠仁,「勞務採購應用成效式契約之初步研究」,國立中央大學,碩士論文,2014。
35. 吳亞蓓,「執行成效式契約之關鍵成功因素分析」,國立中央大學,碩士論文,2015。
36. 謝東昇,「成效式契約應用於專案管理技術服務之研究」,國立中央大學,碩士論文,2016。
37. Performance-based Contracting for Preservation and Improvement of The World Bank, September 2005
38. ZIETLOW, Gunter. Cutting costs and improving quality through performance-based road management and maintenance contracts-the Latin American and OECD experiences. Senior Road Executives Programme, Restructuring Road Management, German Development Cooperation, Birmingham, 2005..
39. Best Management Practices for Victoria, British Columbia, 2004.
40. Getting Ready for the First Renewal of the Sydney PSMC, Pavement Services, Road Runner. Issue 4, 2004.
41. Development of Performance Warranties for Performance Based Road Contracts, Mehmet Egemen Ozbek,Blackburg, Virginia, April 23, 2004.
42. The Quality of Road Service, Evaluation, Perception and World RoadAssociation),1999. Pages 72 to 78, 108 to 118.
43. Maintaining Roads. Experience with Output-based Contracts in Liautaud, World Bank. 2004.
44. Outsourcing of State DOT Capital Program Delivery Functions, TRB, (Transport Research Board), Vienna, Virginia, November 2003.
45. An international Perspective – Long-term Performance-based Road Conference, Rotorua,April 27 to 29, 2003. Main Roads WesternAustralia.
46. The Works Infrastructure Perspective, M Brown, Paper for the Bay Roads Exposed Conference, Rotorua,April 27 to 29, 2003. New Zealand Works.
47. Contratosde Conservación Vial por Niveles de Servicio ó porExperiencias de América Latina, Alberto Bull, Dr. Gunter Zietlow, 14th IRFWorld Congress in Paris, 2001.
48. A review of achievable efficiencies and associated issues under output based contracts, Ewan Hunter; Rowan Kyle Cntracting the Future Symposium, October 2001.
49. Far Does it Mitigate the Risk for Client and Contractor Chris Parkman, John Hallett, Theuns Henningand Mike Tapper, 2003.
50. Innovative Project Delivery Methods for Infrastructure, Pekka Pakkala, Perspective. Helsinki 2002.
51. Review of VDOT’sAdministration of the InterstateAsset Management USA, 2001.
52. Productivity - The Australian Case, Malcom Frost. Paper prepared for the World Congress in Paris, 2001.
53. Best Practices of Outsourcing Winter Maintenance Services, VMS Inc., 2001.
54. Review of VDOT′s Administration of the Interstate Asset Management December 2000.
55. Asset Management in the Road Sector, Expert Group on Asset Management Systems (IMI), OECD, 2000.
56. Asset Preservation Plan for the District of Columbia National Highway Michael Baker Jr., Inc., Washington, D.C., Prepared for the Federal Highway Department of Public Works, Nov. 1999.
57. 行政院公共工程委員會,「永續公共工程-節能減碳政策白皮書」,2-5,2011。
58. 行政院公共工程委員會,「振興經濟擴大公共建設投資計畫落實綠色內涵執行成果報告」,1-30,2012。
59. ASTM. "Standard test method for measuring the longitudinal profile of traveled surfaces with an accelerometer established inertial profiling reference." Annual books of ASTM standards 4 (1997): 703-707.
60. Abromas, Jonas, Jūratė Kamičaitytė-Virbašienė, and Aija Ziemeļniece. "Visual impact assessment of wind turbines and their farms on landscape of Kretinga region (Lithuania) and Grobina townscape (Latvia)." Journal of Environmental Engineering and Landscape Management 23.1 (2015): 39-49.
61. Barney, Jay. "Firm resources and sustained competitive advantage." Journal of management 17.1 (1991): 99-120.
62. Belt, Robin, Tyler Morrison, and Eric Weaver. Long-term pavement performance program falling weight deflectometer maintenance manual. No. FHWA-HRT-05-153. Turner-Fairbank Highway Research Center, (2006).
63. Beyer, Mark. "Gartner Says Solving′Big Data′Challenge Involves More Than Just Managing Volumes of Data." Gartner. Archived from the original on 10 (2011).
64. Berte, Elena, Thomas Panagopoulos, and Bruno Zanon. "An interpretative model for the management of contemporary cultural landscapes in linear infrastructure projects." Journal of Environmental Engineering and Landscape Management 21.4 (2013): 248-262.
65. Branca, Teresa Annunziata, et al. "Reuse and Recycling of By-Products in the Steel Sector: Recent Achievements Paving the Way to Circular Economy and Industrial Symbiosis in Europe." Metals 10.3 (2020): 345.
66. Chen, Jian-Shiuh, Shih-Fan Chen, and Min-Chih Liao. "Macroscopic and Microscopic Evaluation of Surface Friction of Airport Pavements." International Journal of Pavement Research & Technology 6.5 (2013).
67. Faruk, Abu NM, et al. "Traffic volume and load data measurement using a portable weigh in motion system: A case study." International Journal of Pavement Research and Technology 9.3 (2016): 202-213.
68. Guadagnino, Piero, et al. "Techniques of reuse for slags and flakes from the steel industry: a circular economy perspective." P-ESEM (2018): 93.
69. Ho, M. C., et al. "Establishment of the Urban Road Network Level Pavement Management System." Bridging the East and West. (2016): 167-173.
70. Huang, Min Yen, et al. "Investigated on predictive compressive strength model and setting time of controlled low-strength materials." International Journal of Pavement Research and Technology 13.2 (2020): 129-137.
71. James A.. O′Brien. Management Information Systems: managing information technology in the e-business enterprise. McGraw-Hill/Irwin, (2002).
72. Lin, Jyh Dong, et al. "Research of Building Pavement Maintenance Management System of Downtown Area-Zhongli City, Taoyuan County for Example." Advanced Materials Research. Vol. 671. Trans Tech Publications Ltd, (2013).
73. Liu, Hong-hai, et al. "Research and verification of transfer model for roughness conditions of pavement construction." International Journal of Pavement Research and Technology 9.3 (2016): 222-227.
74. Kay, R. Keith. "Pavement surface condition rating manual." Northwest Technologies Transfer Center. Northwest Technologies Transfer Center. Washington State Department of Transportation, Washington, (1992).
75. Karayannis, V. G. "Development of extruded and fired bricks with steel industry byproduct towards circular economy." Journal of Building Engineering 7 (2016): 382-387.
76. Masilionytė, Laura, et al. "Agroecosystems to decrease diffuse nitrogen pollution in northern Lithuania." Journal of Environmental Engineering and Landscape Management 22.3 (2014): 194-207.
77. Ma, Shu-hua, et al. "Mode of circular economy in China′s iron and steel industry: a case study in Wu′an city." Journal of Cleaner Production 64 (2014): 505-512.
78. Saraf, Chhote L. "Pavement condition rating system: review of PCR methodology." (1998). |