參考文獻 |
Bailey, S. J. (1995). Public SectorEconomics : Theory, Policy and Practice. Hampshire [England] : Macmillan Press.
Bell, C. E. and Park, K. (1990). "Solving Resource-Constrained Project Scheduling Problem by A Search." Naval Research Logistics, 37, 61-84.
Benayoun, J. el. al.(1971). "Linear Programming with Multiple Objective Functions : Step Methom(STEM)." Mathematical Programmimg, 1,3,366-375.
Burman, P. J. (1972). Precedence Networks for Project Planning and Control, McGraw-hill Book Company.
Carlsson C. (1982). "The Selection of R&D program Conent : Survey of Qualitative Method. " IEEE Transactions on Engineering Management. EM-14,4-13.
Chang, T. C. et. al. (1990). "Network Resource Allocation With Support of a Fuzzy Expert System." Journal of Construction Engineering and Management, 116, 2, 239-260.
Chang, T.-Y. (1991). Resource Scheduling in the Construction with the Critical Path Method. Master Report, University of Texas, Aaustin, TX., USA.
Charnes, A. and Cooper, W. W. (1977). " Goal Programming and Multi Objective Optimization — Part 1." European Journal of Operational Research, 1,1,39-54.
Charnes, A. L. and Storbeck, J.H. (1984) "A Goal Programming Model for the Siting of Multilevel EMS Systems." Socio-Economic Planning Sciences, 14,155-161.
Charon, I., and Hudry, O. (1993). ”The Noising Method : a New Method for Combinatorial Optimization.” Operation Research Letters, 14, 3, 133-137.
Chen, H.-K. and Chang, M.-S. (1993). "Multiobjective Network Scheduling with Efficient Use of Resource -The Application of Fuzzy Sets," The 1st Conference of Fuzzy Theory and Application in R.O.C.
Chen, S.-J. and Hwang, C.-L. (1992). Fuzzy Multiple Attribute Decision Making. Methods and Applications, Springer-Verlag Berlin Heidelbery.
Christofides, N. A. et. al. (1979). Combinatorial Optimization, John Wiley & Sons, Inc..
Cleland K. (1988). Project Management Handbook, Van Nostrand Reinhold.
Clemen, R. T. (1991). Making Hard Decisions, PWS-Kent Publishing Co., Boston.
Reeves, C. R. ed. (1993), Modern Heuristic Techniques for Combinatorial Problems. Published in the Americas by Halsted Press, an Imprint of John Wiley & Sons, Inc..
Bell, C. E. and Han, J. (1991). "A New Heuristic Solution Method in Resource-Constrained Project Scheduling." Navel Research Logistics, 38, 315-331.
Crowston, W. B., and Wanger, M. H. (1967). "Decision CPM : A Method for Simultaneous Planning, Scheduling and Control of Projects." Operations. Research, 15, 407-426.
Davis, E. W. and Heidorn, G. E. (1971), "An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints." Management Science, 17, 12, 803-816.
Dean, B. V. et. al. (1992). "Multiproject Staff Scheduling with Variable Resource Constraints." IEEE Transactions on Engineering Management, 39, 1, 59-72.
Demetrios, P. (1977). "Cost-Time Model for Large CPM Project Network." Journal of the Construction Division, ASCE, 103, CO2, 201-211.
Diaz, C. F. and Hadipiono, F. C. (1993)." Nondeterministic Networking Methods." Journal of Construction Management, 119, 1, 40-57.
Dimitri, G.-G. (1989). "A New Approach to the Activity-time Distribution in PERT." Journal of the Operational Research Society,Vol.40,No.4,P.389-393
Dodin, B. (1985). "Bounding the Project Completion Distribution in PERT Networks." Operations Research, 33, 4, 862-881.
Dueck, G. (1993). "New Optimization Heuristics : The Great Deluge Algorithm and the Record-to record Travel." Journal of Computatoin Physics, 104, 86-92.
Dueck, G. and Scheuer, T. (1990). ”Threshold Accepting: A General Purpose Optimization Algorithm Appearing Superior to Simuation Annealing.” Journal of Compution Physics, 90, 161-175.
Dumond, John and Mabert, V. A. (1988). "Evaluating Project Scheduling and Due Date Assignment Procedures : An Experimental Analysis." Management Science, .34, 1, 101-118.
Eckmann M. and Krelle, W. (1991). Lecture Notes in Ecomonomics and Mathematical System : Interactive Fuzzy Optimization. Mario Fedrizzi, Janusz Kacprzyk, Marc Roubens (EDs),Spinger-Velag.
Edwared W. and Patterson, J. H. (1975)." A Comparison of Heuristic Solutions in Resource-constrained Project Scheduling." Management Science, 21, 8, 944-955.
Fishman, G. S. (1978). Principles of Discrete Event Simulation. Wiley-Interscience Publication.
Friedmann, J. (1987). Planning in the public domain : from knowledge to action, Princeton University Press.
Geoffrion, A. M. et. al (1972). " An Interactive Approach for Multi-Criteria Optimization, with an Application to the Operation of an Academic Department." Management Science, 19,4, part 1, 357-368.
Glover, F. (1986). ”Further Paths for Integer Program and Links to Artificial Intelligence.” Computer & Operation Research, 13, 261-279.
Glover, F. (1989). ”Tabu Search, Part I.” ORSA Journal on Computing 3(1), 190-206.
Goldberg, D. E. (1989). Genetic Algorithms in search, optimization and machine learning, Addision-wesley publishing company, inc., Massachusetts.
Goldberg, D. E. (1997). Genetic Algorithms in Search, Optimization, and Machine Learning, Addision-Wesley, Reading, Massachusetts.
Gray R. (1993). Infrastructure planning and management, American Society of Civil Engineers, New York.
Gu, J. and Huang, X. (1994). ”Efficient Local Search With Search Space Smoothing: A Case Study of the Traveling Salesman Problem(TSP).” IEEE Transaction on Systems, Man and Cybernetics , 24, 5, 728-736.
Hagstrom, J. N. (1990). "Computing the Probability Distribution of Project Duration in a PERT Network." Networks, 20, 231-244.
Halpin, D. W. and Woodhead, R. W. (1980). Construction Management ,John Wiley and Sons.
Harris, R. B. (1990). "Packing Method for Resource Leveling (Pack)." Journal of Construction Engineering and Management, 116, 2, 331-350.
Hill, M. (1968). ”A Goal Achievement Matrix for Evaluating Alternative Plans.” Journal of the American Institute of Planners, 34, 1, 19-38.
Holland, J. H. (1975). Adaptation in Natural and Artificial System, Ann Arbor: The University of Michigan Press.
Holmes, J. C. (1972). “An Ordinary Method of Evaluation.” Urban Studies, 9, 1, 179-191.
Holmes, J. C. (1973). “An Ordinary Method of Evaluation : A Rejoinder.” Urban Studies, 10, 1, 101-104.
Hoover, S. V. and Perry, R. F. (1989). "Simulation --A Problem-Solving Approach." Addison-Wesley Publishing Company.
Hsieh, T.-Y. and Liu, H.-L. (1996). “A Heuristic approach for selecting construction projects with multiple objectives.” 1996 CIB Beijing International Conference.
Hsieh, T.-Y. and Liu, H.-L. (1997). “A Multi-objective Heuristic Approach for Infrastructure Portfolio with Limited Resources.” Journal of Infrastructure Systems in Civil Engineering, ASCE, 3, 4, 134-142.
Hsieh, T.-Y., Liu, H.-L. and Du, Y.-P. (1996). “A heuristic multi-objective approach for selecting automation investment with limited resources.” 4th Internal Conference. on Automation Technology, 105~112.
Hsu, C.-Y. (1994). Multi-Objective Decision. Wu Nien Book Company.
Hudson, W. R. et. al.(1997). Infrastructure Management, McDraw-Hill, New York, New York.
Hwang, C-L and Yoon, K. (1979). " Multiple Objective Decision Making Methods and Applications." Spring-Verlag, Berlin, Heidelberg, New York.
Hwang, C-L and Yoon, K. (1981). " Multiple Attribute Decision Making Methods and Applications." Spring-Verlag, Berlin, Heidelberg, New York.
Islei, G. and Lockett, A. G. (1988). “Judgmental Modeling Based on Geometric Least Square.” European Journal of Operational Research, 36, 27-35.
Keeney, R. L. (1973). “A Decision Analysis with Multiple Objectives: the Mexico City Airport .” The Bell Journal of Economics and Management Science, 4, 1, 101-117.
Keeney, R. L. and Raiffa, H. (1976). Decision with Multiple Objectives: Preference and Value Tradeoffs. John Wiley and Sons, New York.
Kelly, J. E. (1963). The Critical Path Method :Resources Planning and Scheduling. Muth, J. F. and Thompson, G. L. eds., Prude University.
Khorramshahahgol, R. and Steiner, H. M. (1988). "Resource Analysis in Project Evalution : A Multicriteria Approach." Journal of Operational Research Society, 39, 9, 795-803.
Kim, J.-R. and Gen, M. (2000). "A Genetic Algorithm for Solving Bicriteria Network Topology Design Problem." Journal of Japan Society for Fuzzy Theory and Systems Multiobjective, 12,1,43-54.
Kirkatrick, S., et. al. (1983). “Optimization by Simulated Annealing.“ Science, 220, 671-680.
Koopmans,T.C. (1951). Activity Analysis of production and Allocation. John Wiley & Sons, New York.
Kuhn, H. and Tucker, A. (1951). "Nonlinear Programming." Proceedings of Berkeley Symp. Math. Statist. Probability, 2nd, University of California Press, Berkeley.
Kurtulus, I. and Davis, E. W. (1982). "Multi-project Scheduling : Categorization of Heuristic Rules Performance." Management Science, 28, 2, 161-172.
Lee, C. B. (1991). Fuzzy Theory and Expert Systems, Department of Weapon Systems, Chung Cheng Technology Institute.
Leinbach, T. R. and Cromely, R. G. (1989). “Modeling Intergrated Development Investment in Rural Areas: An Indonesian Illustration, “International Regional Science Review, 12, 2, 229-243.
Leinbach, T. R. and Cromley, R. G. (1983). “A Goal Programming Approach to Public Investment Decisions: A Case Study of Rural Roads in Indonesia.“ Socio-Economic Planing Science, 17, 1, 1-10.
Les, H. and Smith, D. R. (1986). "Resource Allocation Amoung Competing Activities : A Lexicographic Minimax Approach." Operations Research Letters, 5, 5, 227-231.
Mehrez, A. and Sinuany-Stern, Z.(1983). " Resource Allocation to Interrelation Risky Project Using A Multiattribute Utility Function. " Management Science, 29.4.430-439.
Melin, J. W. and Whiteaker, B. (1981)."Fencing a Bar Chart." Journal of the Construction Division, ASCE, 107, CO3, 497-507.
Michalewicz, Z. (1996). Genetic algorithms + data structures = evolution programs. Spring-Verlag, Berlin.
Moeller, G. L. and Digman, L. A. (1981). "Operation Planning with VERT. "Operations.. Research, 29, 4, 676-697.
Mohing, R. H. (1984). "Minizing Cost of Resource Requiments in Project Networks Subject to a Fixed Completion." Operations Research, 32, 1, 89-120.
Morisugi, H. et al. (1981) " Measurement of Road User Benefits by means of A Multi-Attribute Utility Function." Papers of Regional Sciences Association, 46, 32-43.
Neumann, L. A. and Dresser, J. (1981). “New Approach for Analyzing Highway program Choices and Trade-offs.” Transportation Research Record, 752, 1-7.
Nowlan, D. M. (1975). “The Use of Criteria Weights in Rank Ordering Techniques of Project Evaluation.” Urban Studies, 12, 2, 169-176.
O'Brien, J. J. (1975). "VPM Scheduling for High-Rise Buildings." Journal of Construction Division, ASCE, 101, CO4, 895-905.
Osama, Y. A. and Rasdrof, W. J. (1993), "Prototype Integrated Cost and Scheduling Control System." Journal of Computing in Civil Engineering, 7, 2, 181-198.
Osman, I. H. (1993). “Metastrategy Simuated Annealing and Tabu Search Algorthms for the Vehicle Routing Problem.” Annals of Operation Research, 41, 421-451
Osman, I. H. and Kelly, J. P.(1996). ”Meta-heuristics: an Overview.” Osman, I. H. and Kelly, J. P. eds., Meta-heuristics: Teory and Applications, Kluwer Academic Publishers, Massachusett, 1-21.
Patterson, J. H. (1984). "A Comparision of Exact Approaches Solving the Multiple Constrained Resource Project Scheduling Problem." Management Science, 7, 7, 854-867.
Patterson, J. H. (1984). "A comparison of Exact Approach for Solving the Multiple Constrained Resource Project Scheduling Problem." Management Science, 16, 93-108.
Pearman, A. D. et al. (1989). "The Use of Multicriteria Techniques to Rank Highway Investment Proposals." in: Lockett, A.G. and Islei, G. (eds), Improving Decision Making in Organizations, Springer-Verlag.
Phillips, D. T. and Albeto, G.-D. Foundamentals of Netwok Analysis,Prentice-Hall Inc.
Prisker, A. B., Lawrence, L. J. and Wolfe, P. M. (1969). "Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach," Management Science, 16, 1, 93-108.
Sakawa, M. (1983). " Internative Computer Programs for Fuzzy Linear Programming with Multiple Ojectives." International Journal of Man-Machine Studies, 18, 5,489-503.
Satty, T. L. (1980). The Analytic Hierarchy Process. McGraw-Hill, New York.
Seibert, J. E. and Evans, G. W. (1991). "Time-Constrainted Resource Leveling." Journal of Construction Engineering and Management, 117, 3, 503-521.
Shirazi, B. et. al. (1990). "Analysis and Evaluation of Hueristic Methods for Static Scheduling." Jounal of Pallel and Distributed Computing, 10, 222-232.
Simaan, M. A. and Halpin, D. W. (1990). "Probabilistic Simulation Studies for Repetitive Construction Processes." Journal of Construction Engineering and Management, ASCE, 116, 14, 575-594.
Stern, E. (1978). " An Implementation-Scheduling Model for Urban Development project." Environment and Planning B: Planning and Design, 13, 47-61.
Stern, E. (1986), "A Implementaition-scheduling model for urban development project. " Environment and planning B: Planing and design, 13, 47-61.
Steuer, R. E.(1986). Multiple Criteria Optimization : Theory, Computation, and Application. John Wily and Sons, NewYork.
Takeda, E., et. al. (1987). "Estimating Criterion Weights Using Eigenvectors : A Comparative Study. " European Journal of Operational Research, 29, 360-369.
Talbot, F. B. (1982). "Resource-Constrainted Project Sheduling with Time-Resource Tradeoffs : The Nonpreemptive Case." Management Science, 28, 1197-1210.
Talbot, F. B. and James Patterson, H. (1978). "An Efficient Integer Programming Algorithm with Network Cut for Solving Resource-Constrained Scheduling Problems." Management Science, 24, 11, 1163-1174.
Teng, J-T. (1992). Interrelated Transportation Investment Project Selection: A Nonfuzzy and Fuzzy Multi-Objective Programming Methodology, Ph.D. Dissertation, National Chiao-Tung University, Taiwan, ROC. (in Chinese)
Tiebout, C. M. (1956). "A Pure Theory of Local Expenditures." Journal of Political Economy, 64, 416-424.
Tosirisuk, P. and Chanda, J. (1990). "Mutiple Finite Source Queueing Model with Dynamic Priority Scheduling." Naval Research Logistics,37, 365-381.
Ulusoy, G. and Ozdamar, L. (1989). "Heuristic Performance and Network/Resource Characteristics in Resource-Constrained Project Scheduling." Journal of the Operation Research Society, 40, 12, 1145-1152.
Vickrey,W. S. and Arnott, R. (1994). Public economics, Cambridge : Cambridge University Press.
Wiest, J. D. (1967). "A Heuristic Model for Scheduling Large Projects With Limited Resource." Management Science, 13, 6, 359-377.
Williams, A. and Giardina, E. eds. (1993). Efficiency in the public sector : the theory and practice of cost-benefit, anlysis. Edward Elgar Publishing company, England.
Yu, P. L. and Leitmann, G. (1973). "Compromise Solutions Domination Structure and Salukcadze’s solution. "Problems of control and Information Theory, 2, 3-4, 183-197.
Zadeh, L. A. (1963). "Optimality and Nonscalar-valued Performance Criteris." IEEE Transactions on Automatic Control, AC-8, 1, 59-60.
Zeleny, M. (1982). Multiple Criteria Decision Making. Mc Graw-Hill, Inc.
「政府公共建設計畫」規劃總說明(1999),行政院經濟建設委員會。
丁致成(1997),城市多贏策略-都市計畫與公共利益,創興出版有限公司。
下水道法(中華民國七十三年十二月二十一日總統令公告)。
中央對對省市政府補助事項處理原則(八十年十一月十九日行政院台(80)忠授字第一三三九一號函修正公布)。
中長程公共工程建設計畫先期作業要點草案(1999),行政院經經濟建設委員會。
中國經濟學會(1993),公共投資政策研討會論文集。
中華民國八十六年台北縣統計要覽(1998),台北縣政府。
內政部營建署補助地方政府辦理營建建設計畫經費實施要點(1999),內政部營建署。
六年國家建設計畫期中檢討報告(1993),行政院經濟建設委員會。
公共工程法草案(1997),行政院公共工程委員會。
王明堂(1993),都市交通效率指標之建立-以台北市為例,國立中興大學法商學院都市計畫研究所碩士論文。
王潤德(1996),類神經網路應用於多目標運輸方案評選之研究,國立成功大學交通管理研究所碩士論文。
台中生活圈道路系統建設計畫(1989),台灣政府省住宅及都市發展處。
台中生活圈道路系統建設計畫第一次修正(1997),台灣政府省住宅及都市發展處。
台北縣政府中程發展計畫(85~87年)(1994),台北縣政府。
台北縣政府中程發展計畫(87-91年)(1998),台北縣政府。
台北縣綜合發展計畫(1993),台灣大學建築與城鄉研究所。
台灣省十六個生活圈道路系統建設計畫總報告(一)摘要報告,台灣省政府住宅及都市發展局。
台灣省十六個生活圈道路系統建設計畫總報告(二)實質建設報告,台灣省政府住宅及都市發展局。
台灣省十六個生活圈道路系統建設計畫總報告,台灣省政府住宅及都市發展局。
台灣省市區道路管理規則(中華民國七十年三月十七日台灣省政府七0府都道字第一四一二五號令修正)
台灣省各縣市申請辦理都市計畫區公共工程既相關事項作業手冊(1986),台灣省政府住宅及都市發展局。
台灣省各縣市申請辦理都市計畫區公共工程須知(中華民國七十五年十一月十七日七五府住都法字第一五八四二五號)
台灣省政府住宅及都市發展局(1986),台灣省各縣市申請辦理都市計畫區公共工程既相關事項作業手冊。
台灣省政府住宅及都市發展局八十五年度各項工程預算項目評估彙計表。
台灣省政府住宅及都市發展局八十五年度經費類單位決算。
台灣省政府住宅及都市發展局辦理公園綠地建設建設作業須知(1994),台灣省政府住宅及都市發展局。
台灣省政府住宅及都市發展處八十六年度各項工程預算項目評估彙計表。
台灣省政府住宅及都市發展處八十六年度經費類單位決算。
市區道路管理條例(中華民國五十四年一月二十八日總統制定全文三十四條公布刊登總統府公報第一六一四號)。
石明炎(1985),投資決策分析,現代管理月刊雜誌社。
朱賓力(1988),「PERT於營建工程之應用」,現代營建,第九卷,第十期。
朱賓力(1989),「使用單時估計法易犯之錯誤二則」,現代營建,第十卷,第一期。
江俊謀(1997),公共工程執行績效評估制度與考評指標之研究,技術學院營建工程技術研究所碩士論文。
行政院列管十二項建設計畫推動情形(1998),行政院經濟建設委員會。
行政院列管十二項建設推動情形(1997),行政院經濟建設委員會管考處編印。
行政院列管十二項建設推動情形(1998),行政院經濟建設委員會管考處編印。
何東波(1979),台北市公共設施與財政關係之研究,國立中興大學都市計畫研究所碩士論文。
吳心琪(1996),震災後公路網搶修工程排程之研究,國立交通大學交通運輸研究所碩士論文。
吳冠毅(1996),整合環境影響評估於重大公共工程計畫決策程序之研究:以交通建設為例,國立台灣大學建築與城鄉研究所碩士論文。
吳清輝(1980),論住宅社區發展之成本與收益-公共設施建設成本與土地稅收益分析,國立政治大學地政研究所博士論文。
吳裀村(1986),「公共政策設計的概念」,住都雙月刊,第六0期。
吳義建(1997),「如何加強政府施政績效評估之研究」,審季季刊,第十七卷,第四期。
吳壽山(1993),交通建設計畫執行績效評估方法之研究,行政院經濟建設委員會委託研究計畫。
吳澤成(1998),都市公共工程建設計畫評估模式之研究,國立中央大學土木所碩士論文。
吳澤成、謝定亞、劉馨隆(1998),都市公共工程建設計畫評估之探討,住都雙月刊,132期,頁2-19。
吳澤成、謝定亞、劉馨隆(1998),都市公共工程建設計畫評估模式之研究,第二屆營建管理學生論文聯合發表會。
李金桐(1991),財政學,五南圖書出版有限公司。
李得璋(1987),營建經營管理-營建工程規畫與進度控制,財團法人營建研究中心。
李龍財(1993),農村社區公共設施最適供給決策之研究,國立中興大學農業經濟研究所碩士論文。
杜富燕(1997),政府重要經建投資計畫預算額度管制作業之研究,行政院經濟建設委員會委託研究計畫。
杜善良,「經建計畫的評估與考核」,六國出版社,民國七十四年十月。
周榮昌等(1999),公共投資於中小型交通建設之策略規劃與準則制定之研究,交通部科技顧問室專案研究報告。
周濟(1999),中長程公共建設計畫制度與政府資源配置之關聯與探討,行政院經濟建設委員會委託研究計畫。
林建元等(1995),公共工程計畫審議評估準則之研究(第一期),行政院公共工程委員會專案研究計畫成果報告。
林能白等(1997),公共工程計畫審議評估準則之研究(第二期),行政院公共工程委員會專案研究計畫成果報告。
林雪花(1995),公共工程之規畫與成本效益評估,台北市政府所屬各機關因公出國人員出國報告書。
林華德(1989),地方財政收支劃分問題之研究,財政部賦稅改革委員會。
林裕豐(1986),都市分期分區計畫研擬之探討-公共設施分期分區建設方案擬定,私立東海大學建築研究所碩士論文。
林耀煌(1991),營建工程施工規畫與管理控制,長松出版社,第九版。
侯繼明(1987),公共投資效益評估制度之檢討與改進,財政部稅制會。
政府重要經建投資計畫先期作業實施要點(行政院八十六年八月十三日台忠授字第0七八二六號函修正)。
政府重要經建投資計畫預算額度管制作業要點(八十五年七月十日行政院經濟建設委員會第八三四次委員會議通過)。
柯三吉(1993),中央對地方交通建設計畫補助標準評估之研究,交通部運輸研究所。
洪嘉宏(1989),計畫方案投資時序問題模式之研究,國立成功大學都市計畫研究碩士論文。
韋端(1997),「善用國家資源提升施政績效」,審季季刊,第十七卷,第二期。
唐富藏(1994),投資計畫評估,華泰書局。
徐仁輝(1998),公共財政學:公共預算與財務行政,智勝文化事業有限公司。
財政收支劃分法(中華民國七十年一月二十一日公布施行)。
區域計畫法(中華民國六十三年一月三十一日總統63台統(一)義字第0四四一號令公布)。
國土綜合開發計畫(1996),行政院經濟建設委員會。
國土綜合開發計畫研討會議事錄(1994)行政院經濟建設委員會。
國家建設六年計畫(民國80至85年)(1993),行政院經濟建設委員會。
常用法令(1994),彙編台灣省政府住宅及都市發展局。
張松波譯(1997),美國審計總署對公共工程建設計畫審計之簡介,審季季刊,第十七卷,第四期。
張信一(1995),我國中央政府重大公共工程計畫評估與預算編審制度改革之探討:以交通建設為例,國立臺灣大學會計學研究所碩士論文。
張則堯(1991),公共財及受益者付費問題,中國經濟月刊社出版。
張盛和(1976),公共財的理論,財政部財稅人員訓練所編印。
張順勝(1991),以公共財的觀念來分析我國都市計畫公共設施的規劃理念,國立成功大學都市計劃研究所碩士論文。
張溪河、謝平芳(1988),公園規畫與民眾參與,住都雙月刊,第七十二期。
張聰明(1991),都市計畫短程計畫制度之研究,中國文化大學實業計畫研究所博士論文。
採購法(1999),行政院公共工程委員會。
梁發進(1984),公共經濟學講座(上、下冊),財政部財稅人員訓練所。
梁勳烈(1997),「建設計畫之考評與績效審計」,審季季刊,第十七卷,第四期。
莊湧龍(1996),「公共工程績效評估因子之探討─以台灣省地區生活圈道路系統建設計畫為例」,住都雙月刊,第一二0期。
許志義(1994),多目標決策,五南圖書出版公司。
許亞儒(1980),由最大效用原理探討都市公共設施需求行為,國立成功大學都市計劃研究所碩士論文。
許松根、王塗發、陳振銘(1989),當前我國公共投資問題與對策,台灣經濟研究所。
郭大榮、蔡秀采譯(1996),美國政府審計準則,審季季刊第十六卷第三期。
郭崑謨(1988),投資決策導論 ,五南出版社。
都市計畫法(中華民國七十七年七月十五日總統令修訂)
陳文賢(1991),管理學科學--作業研究與數量方法,三民書局。
陳安亭(1998),專案工程模糊排程最適化求解之研究,國立台灣科技大學營建工程技術研究所碩士論文。
陳安亭(1998),專案工程模糊排程最適化求解之探討,國立台灣科技大學營建工程技術研究所碩士論文。
陳孝順(1985),「衛生下水道系統計畫方案之評估方法」,住都雙月刊,第四十七期。
陳炯郎(1994),公共工程營建管理效能之研究:以台灣省都市計畫區公共工程為例,私立中華工學院土木工程研究所碩士論文。
陳振銘、王塗發、許松根(1988),當前我國公共投資問題與對策,台灣經濟研究雜誌社。
陳淼川(1985),縣市綜合發展計畫財源籌措及運用之研究-以台北縣為例,中國文化大學實業計畫研究所碩士論文。
陳實(1991),政府之謎,書華出版事業有限公司。
陳豫(1994),「公共工程建設的省思」,浩然講座-亞太科技管理研究發展中心籌設系列,交通大學思源基金會。
彭光輝(1988),美國都會區與公共設施建設之研究,台灣省政府公費赴美研習『公共設施規畫與建設』回國報告書。
曾廣田(1980),都市建設財源問題研究,台南市政府財政局。
游銘富(1996),風險處理方式之選擇及因應:以公共工程為例,國立臺灣大學商學研究所碩士論文。
黃世鑫(1989),我國各級政府經濟功能劃分協調及地方財政問題,財政部賦稅改革委員會。
黃旭男(1993),資料包絡分析使用程序之研究即在非營利組織效率評估上之應用,交通大學管理科學研究所博士論文。
黃英俊(1977),國營事業投資計畫評估方法與作業之研究,行政院研究發展考 核委員會。
黃蔭昌(1996),「政府公共投資的審計」,審季季刊,第十六卷,第三期。
楊健邦(1999),市區道路建設計畫經費補助分配方法之研究,國立交通大學交通運輸研究所碩論文。
萬儀(1993),都會區公共設施之探討:台北都會區個案研究,私立中國文化大學中山學術研究所碩士論文。
葉日新(1994),都市公共服務外部績效量測與指標建立之研究,國立中山大學公共事務管理研究所碩士論文
葉如萍(1993),運輸計畫經濟評估課題之探討─以高速鐵路為例,國立成功大學碩士論文。
葉淑華(1994),「兩階段多準則評估方法之應用─以桃園捷運網方案評估為例」,住都雙月刊,第一一一期。
詹前輝(1996),以生命週期之觀點分析公共工程預算變動之現象,國立台灣大學土木工程研究所碩士論文。
詹裕亨(1986),台北市都市計畫設計準則之研究,國中文化大學實業計畫研究所。
預算法(中華民國六十年十二月十七日總統令修正公布全文七十九條)。
廖國禎(1991),營建管理--要徑法與工程規畫,科技圖書有限公司,第二版。
劉延琮(1987),重大運輸投資計畫成本控制之研究,國立台灣大學土木工程學研究所碩士論文。
劉鴻喜(1991),台灣省基層建設計畫執行績效之評估,台灣省政府經濟建設動員委員會。
劉馨隆(1993),專案投資組合及其時程及資源規劃之研究,國立中央大學土木所碩士論文。
劉馨隆(1994),專案投資組合及其時程與資源規畫之研究,國立中央大學土木工程研究所碩士學位論文。
審計報告書(1998),審計部。
蔡智充(1994),從營建管理制度之觀點探討公共工程推動規劃設計階段管理之改善要點,私立中華工學院土木工程研究所碩士論文。
蔡智發(1985),新竹市公共設施計劃之研究,國立中興大學都市計劃研究所碩士論文。
鄧振源(1992),相關性運輸投資計畫選擇之研究-非模糊與模糊多目標規劃方法,國立交通大學交通運輸研究所博士論文。
鄧振源(1994),公共部門多階段多目標投資規劃之研究,華梵人文科技學院。
鄧振源、曾國雄(1989),「層級分析法(AHP)的內涵特性與運用(下)」,中國統計學報,27卷,第七期。
鄧振源、曾國雄(1989),「層級分析法(AHP)的內涵特性與運用(上)」,中國統計學報,27卷,第六期。
謝忠賢(1997),訊息處理能力、工程特性與預算編列成果之關係:公共工程規劃設計階段之探討,國立臺灣大學商學研究所碩士論文。
謝金河(1997),農村地區公共設施供給公平及效率衡量之研究:以雲林生活圈公共醫療設施為例,國立中興大學農業經濟研究所碩士論文。
謝玲芬(1988),多目標(多準則)評估技術之探討及其在組織績效評估之應用,清華大學工業工程研究所碩士論文。
謝靜琪(1984),臺北市公共設施效益資本化之研究,國立中興大學都市計畫研究所碩士論文。
韓復華、卓裕仁(1996),「門檻接受法、成本擾動法與搜尋空間平滑法在車輛路線問題之應用研究與比較分析」,運輸學刊,第9卷,第3期。
韓復華、卓裕仁、陳國清(1999),「五種巨集啟發式解法在VRP問題上的應用與比較」,中華民國第四屆運輸網路研討會論文集。
韓復華、張靖、卓裕仁(1996),車輛路線問題研究:SA、TA、NM、SSS與交換型啟發方法之綜合應用分析,國立交通大學運輸工程與管理學系,八十五年度國科會專題研究計畫成果報告(NCS-85-2211-E-009-023)。
韓復華、楊智凱、卓裕仁(1997),「應用門檻接受法求解車輛路線問題之研究」,運輸季刊,第26卷,第二期。
簡俊明(1995),「交通政策之風險與不確定性」,住都雙月刊,第一一三期。
鐘正行、莊湧龍(1989),「台灣省市區道路優先闢建評估之研究」,住都雙月刊,第八十二期。 |