參考文獻 |
[1] Agnihothri, S.R. and R.S. Kenett, “The impact of defects on a process with rework”, European Journal of Operational Research, 80, 308–327 (1995).
[2] Banerjee, P.K. and M.A. Rahim, “Economic design of -chart under Weibull shock models”, Technometrics, 30, 407-414 (1988).
[3] Barlow, R.E. and F. Proschan, Mathematical theory of reliability, Wiley, New York (1967).
[4] Ben-Daya, M. and M. Makhdoum, “Integrated production and quality model under various preventive maintenance policies”, Journal of the Operational Research Society, 49, 840-853 (1998).
[5] Ben-Daya, M., “Integrated production maintenance and quality model using the imperfect maintenance concept”, IIE Transactions, 31, 491-501 (1999).
[6] Ben-Daya, M., “The economic production lot-sizing problem with imperfect production process and imperfect maintenance”, International Journal of Production Economics, 76, 25-264 (2002).
[7] Chakraborty, S. and N.V. Rao, “EBQ for a multistage production system considering rework”, Operations Research 25, 75–88 (1988).
[8] Chen, C.S. and T.H. Savits, “A cost relationship between age and block replacement policies”, Journal of Applied Probability, 25, 789-796 (1988).
[9] Chen, M. and R.M. Feldman, “Optimal replacement policies with minimal repair and age-dependent cost”, European Journal of Operational Research, 98, 75-84 (1997).
[10] Flapper, S.D.P. and T. Jensen, “Logistic planning of rework with deteriorating work-in-process”, International Journal of Production Economics, 88 (1), 51–59 (2004).
[11] Flapper, S.D.P., J.C. Fransoo, R.A.C.M. Broekmeulen and K .Inderfurth, “Production and control of rework in the process industries: A review”, Production Planning and Control, 13 (1), 26–34 (2002).
[12] Gupta, T. and S. Chakraborty, “Looping in a multistage production system”, International Journal of Production Research 22 (2), 299–311(1984).
[13] Hariga, M. and M. Ben-Daya, “Note: the economic manufacturing lot-sizing problem with imperfect production process: bounds and optimal solutions”, Naval Research Logistics, 45, 423-432 (1998).
[14] Hassin R., “A dichotomous search for a geometric random variable”, Operations Research, 32: 423-439 (1984).
[15] He, Q.M., Y. Gerchak and A. Grossfeld-Nir, “Optimal inspection order when process failure rate is constant”, International Journal of Reliability, Quality and Safety Engineering, 3(1), 25-41 (1996).
[16] Kander, Z., “Inspection policies for deteriorating equipment characterized by N quality levels”, Naval Research Logistics Quarterly, 25, 243-255 (1978).
[17] Kijima, M., H. Morimura and Y. Suzuki, “Periodical replacement problem without assuming minimal repair”, European Journal of Operational Research, 37, 194-203 (1988).
[18] Kijima, M., “Some results for repairable systems with general repair”, Journal of Applied Probability, 49, 215-223 (1997).
[19] Lee, H.L. and M.J. Rosenblatt, “A production and maintenance planning model with restoration cost dependent on detection delay”, IIE Transaction, 21(4), 368-375 (1989).
[20] Lee, H.H., M.J. Chandra and V.J. Deleveaux, “Optimal batch size and investment in multistage production systems with scrap”, Production Planning and Control, 8 (6), 586–596 (1997).
[21] Lin, C.Y., “Optimization of maintenance, production and inspection strategies while considering preventative maintenance error”, Journal of Information & Optimization Sciences, 25, 543-555 (2004).
[22] Lin, T.M., S.T. Tseng and M.J. Liou, “Optimal inspection schedule in the imperfect production system under general shift distribution”, Journal of Chinese Institute of Industrial Engineers, 8(2), 73-81 (1991).
[23] Luss, H. and Z. Kander, “Inspection policies when duration checking is non-negligible”, Operational Research Quarterly, 25, 299-309 (1974).
[24] Makis, V. and A.K.S. Jardine, “A note on optimal replacement policy under general repair”, European Journal of Operational Research, 69, 75-82 (1993).
[25] Mohandas, K., D. Chaudhuri and B.V.A. Rao, “Optimal periodic replacement for a deteriorating production system with inspection and minimal repair”, Reliability Engineering and System Safety, 37, 73-77 (1992).
[26] Munford, A.G. and A.K. Shahani, “A nearly optimal inspection policy”, Operational Research Quarterly, 23, 373-379 (1972).
[27] Nahmias, S., Production and Operations Analysis, McGraw Hill, Singapore (1997).
[28] Nakagawa, T., “A summary of imperfect preventive maintenance policies with minimal repair”, RAIRO Operations Research, 14(3), 249-255 (1980).
[29] Nakagawa T., “Periodic inspection policy with preventive maintenance”, Naval Research Logistics Quarterly, 31, 33-40 (1984).
[30] Pham, H. and H. Wang, “Invited review imperfect maintenance”, European Journal of Operational Research, 94, 425-438 (1996).
[31] Porteus, E.L., “Optimal lot sizing, process quality improvement and setup cost reduction”, Operations Research, 34, 137-144 (1986).
[32] Porteus, E.L., “The impact of inspection delay on process and inspection lot sizing”, Management Science, 36(8), 999-1007 (1990).
[33] Rahim, M.A., “Joint determination of production quantity, inspection schedule, and control chart design”, IIE Transactions, 26(6), 2-11 (1994).
[34] Raz, T., Y.T. Herer and A. Grosfeld-Nir, “Economic optimization of off-line inspection”, IIE Transactions, 32, 205-217 (2000).
[35] Rosenblatt, M.J. and H.L. Lee, “Economic production cycles with imperfect production process”, IIE Transactions, 18, 48-55 (1986).
[36] Sheu, S.H., “A modified block replacement policy with two variables and general random minimal repair cost”, Journal of Applied Probability, 33, 557-572 (1996).
[37] Sheu, S.H., “Extended optimal replacement model for deteriorating systems”, European Journal of Operational Research, 112; 503-516 (1999).
[38] Sheu, H.S. and J.A. Chen, “Optimal lot-sizing problem with imperfect maintenance and imperfect production”, International Journal of Systems Sciences, 35(1), 69-77 (2004).
[39] Sheu, S.H. and W.S. Griffith, “Multivariate age-dependent imperfect repair”, Naval Research Logistics, 38, 839-850 (1991).
[40] Sheu, S.H., Y.B. Lin, and G.L. Liao., “Optimal policies with decreasing probability of imperfect maintenance”, IEEE Transactions on Reliability 54(2); 347-357, (2005).
[41] Silver, E.A., D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling, Wiley, New York, (1998).
[42] Silver, E.A. and R. Peterson, Decision systems for inventory management and production planning, John Wiley, New York (1985).
[43] Tseng, S.T., R.H. Yeah and W.T. Ho, “Imperfect maintenance for deteriorating production systems”, International Journal of Production Economics, 55, 191-201, (1998).
[44] Wang, C.H. and S.H. Sheu, “Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system”, Computers & Operations Research, 28, 1093-1110, (2001).
[45] Zacks, S. and W.J. Fenske, “Sequential determination of inspection epochs for reliability system with general lifetime distributions”, Naval Research Logistics Quarterly, 20, 377-386, (1973). |