摘要(英) |
Under the internal and external competition pressure, the project carries out lean production system to develop a suitable manufacture management model. Therefore,the research adopts the case study method to the corporation that launched into the management philosophy of Lean Production. The study clarified the implement of lean production system to suggest a functional program that conform lean production and to systematize it. With the major study results shown as follows:
1. Background, process and effect
(1) The factory entered into the project when the corporation carried out lean prodution.
(2) Improvement procedures: The primary stage: to decrease the inventory of material and semi-product; the planning stage: to draw value stream map; the analysis stage: to merge and smallize the production lines; the execution stage: to improve the production model and process; thevaluate stage: to improve the transportation of material.
(3) Performance estimated: the key point of inprovement is the P4 production line circulation and a work process, the result of improvement is more than 30% and the inventory is better.
2. The influlence factor of performance: support from top management, resistance to change, the guidance from advisers, and etc.
3. To thoroughly clarify the performance difference before, in the middle of, and after lean production be launched.
Focus on P4 line improvement, mini line has replaced original line to curtail man-hour and cost down. The objective of improvement is to continuously decrease the inventory of DTD (Dock to Dock) SMT and MI.
|
參考文獻 |
一、中文部分
1.Q公司(2008)。LEAN教育訓練教材。
2.Q公司(2008)。投影機工廠專案報告。
3.王派榮(2001)。豐田生產方式運作之研究-台灣國瑞汽車公司及其協力廠之成功案例 。中原大學企業管理學系碩士論文。
4.江金龍(譯)(1998)。成功的企業轉型。台北市:尖端。(龍澤正雄與筒井信行,1998)
5.林陽助(1991)。台灣地區汽車製造業轉型經營策略之研究-以十家汽車製造公司為例。 中興大學企業管理研究所碩士論文。
6.財務顧問網管理知識庫(2004)。精益生產,http://www.cwgw.com/(2009/3/16)
7.陳福霖(2003)精實的生產管理。 http://www.aheadmaster.com/knowledge/200304-2.htm (2009/3/16)
8.蘇雄義(1999)。供應鏈整合— 觀念性分析架構、整合程序與個案。東吳經濟商學學報,25,1-24。
二、英文部份
1.Bonney et al.(1999). T Are push and pull systems really so different?. Internation journal of production economics, 19, 81-96.
2.BS 5192. (1993). Guide to production control PartⅠ. British Standards Institution, London
3.Christopher, M.(1998). Logistics and Supply Chain Management : Strategies for Reducing Cost and Improving Servic. Financial Times Pitman.
4.Ebrahimpour, Maling and R. J. Schonberger.(1984). The Japanese Just-In-Time / Total Quality Control Production System: Potential for Developing Countries. International Journal of Production Research, 22( 3), 422-426.
5.Ellram,L.M.(1991). Supply Chain Management: The Industrial Organization Perspective. International Journal of Physical Distribution and Logistics Management,.13-22.
6.Handfield, R. B. and Nichols, E. L. Jr.(1999). Introduction to Supply Chain Management. Prentice-Hall.
7.John B. R.(1965). The American Automobile – Brief History. Chicago & London: The University of Chicago Press.
8.Krackhardt, D.(1992). The strength of strong ties: The importance of Philos in organization. In: Nohria, N. and Eccles, R.G.(Eds), Networks and organizations. Boston: Harvard Business School Press. pp. 216-239.
9.Liker, J. K.(2003). The Toyota Way: 14 management principles from the world’s greatest manufacture. Columbus, OH: The McGraw-Hill Companies, Inc.
10.Oliver, K. R. and Webber, M. D.(1982). Supply Chain Management Logistics Catches up with Strategy.Outlook, cit.
11.Thomas, D.J. and Paul M. G.(1996). Coordinated Supply Chain Management. European Journal of Operational Research, 94, 1-15.
12.W.E. Goddard, R.B. Brooks(1984). Just-in-time:a goal for MRPⅡ,Readings in Zero Inventory. Conference Proceedings APICS。
13.Womack, J. P., & Jones, D. T.(1990). The Machine That Changed The World. Rawson Associates. New York.
14.Womack, J. P., & Jones, D. T.(1996). Lean Thinking Banish waste and create wealth in your corporation. Simon & Schuster, New York.
15.Yin, R.K.(1987). Case Study Research: Design and Method. Sage Publication.
|