參考文獻 |
Bielge, U et. al. 1977 "AGV systems with multi-load carriers: basic issues and potential benefits", Journal of Manufacturing Systems, 16(3) 159-174
Bozer, Y. A. and Srinivasan, M. M., 1989, “Tandem configurations for AGV systems offer simplicity and flexibility,” Material Handling System, 21(2), 23-27.
Bozer, Y. A. and Srinvasan, M. M., 1992, “Tandem AGV system : a partitioning algorithm and performance comparison with conventional AGV systems,” European Journal of Operational Research, 63(1) , 173-191.
Bozer, Y. A., and Yen, C. K., 1996, “Intellignet dispatching rules for trip-based material handling systems”, Journal of Manufacturing Systems, 15(4), 226-239.
Egbelu, P. J., 1987a, “The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle base transport System,” Material Flow, 2, 17-32.
Egbelu, P. J. and Tanchoco, J. M. A., 1986, “Potentials for bi-directional guide-path for automated guided systems,” International Journal of Production Research, 24(5), 1075-1097.
Gaskins, R. J., and Tanchoco, J. M. A., 1987, “Flow path design for automated guided vehicle systems,”International Journal of Production Research, 25(5), 667-676.
Gaskins, R. J., Tanchoco, J. M. A., and Taghoboni, F., 1989, “Virtual flow paths for free-ranging automated guided vehicle system,” International Journal of Production Research, 27(1), 91-100.
Ho, Y. C., and Shaw, H. C., 1998, “The performance of multiple-load AGV systems under different guide path configurations and vehicle control strategies,” the Joint Conference of the Fifth International Conference on Automation Technology and 1998 International Conference of Production Research(Asia Meeting) , July 20-22, Grand Hotel, Taipei, Taiwan, R.O.C., 1998.
Kim, C. W. and Tanchoco, J. M. A., 1991, “Conflict-free shortest path bi-directional AGV routing,” International Journal of Production Research, 29(12), 2377-2391.
Klein, C. M. and Kim, J., 1996, “AGV dispatching”, International Journal of Production Research, 34(1), 95-110.
Lee, J., Tangjarukij, M., and Zhu, Z., 1996,”Load selection of automated guided vehicles in flexible manufacturing systems”, International Journal of Production Research, 34(12), 3388-3400
Maxwell, W. L. and Muckstadt, J. A., 1982, “Design of automatic guided vehicle systems,” IIE Transaction, 14(2), 114-124.
Nayyar., P. and Khator, S. K., 1993, “Operational Control of multi-load vehicles in an automated guided vehicle system”. Computers and Industrial Engineering, 25(1-4), 503-506.
Newton, D., 1985, “Simulation model calculates how many automated guided vehicle are needed,”Industrial Engineering, 8(2), 68-77.
Occena, L. G. and Yokota, T., 1991, “Modeling of an automated guided vehicle system (AGVs) in a just-in-time (JIT) environment,” International Journal of Production Research, 29(3), 495-511.
Rajotia, S., Shanker, K., and Batra, J. L., 1998, “Determination of optimal AGV fleet size for an FMS,” International Journal of Production Research, 36(5), 1177-1198.
Sinriech, D. and Tanchoco, J. M. A., 1995, “An introduction to the segmented flow approach for discrete material flow systems,” International Journal of Production Research, 33(12), 3381-3410.
Sinriech, D. Tanchoco, J. M. A., and Herer, Y. T., 1996, “The segmented bi-directional single-loop topology for material flow systems,” IIE Transactions, 28(1), 40-54.
Tanchoco, J. M. A. and Sinriech, D., 1991, “OSL-optimal single loop guided paths for AGVs,” International Journal of Production Research, 30(3), 665-681.
Tanchoco, J. M. A., and Co, C. G., 1994, “Real-time control strategies for multiple-load AGVs,” Material Flow Systems in Manufacturing, edit by Tanchoco, J. M. A. (Chapman & Hall), pp. 300-331.
Yim. D., and Linn. R. J., 1993, “Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system”. International Journal of Production Research, 31(1), 43-57. |