參考文獻 |
1. Cook, D.P., “A Simulation Comparison of Traditional, JIT and TOC Manufacturing Systems in a Flow Shop with Bottleneck,” Production and Inventory Management Journal, 1, pp.73-78, 1994.
2. Dileep, R. S., Industrial Scheduling, PWS Publishing Company, 1997.
3. Evans, J. R., Production/Operations Management, 5th ed., West Publishing Company, 1997.
4. Fogarty, D. W., Blackstoe, J. H., and Hoffmann, T. R., Production & Inventory Management , South-Western Publishing Co., 1991.
5. Goldratt, E. M., and E. F. Rebert,The Race, North River Press, 1986.
6. Goldratt, E. M., and J. Cox, The Goal, North River Press, 1986.
7. Goldratt, E. and Fox, R.,The Race, North River Press, Inc.,New York,1986.
8. Goldratt, E.M., Theory of Constraints, North River Press, Great Barrington, MA, 1990.
9. Goldratt, E. M.,The Hystack Syndrome, North River Press, 1990.
10. Higgins, P., Le Roy, P., and Tierney, L., Manufacturing Planning and Control, Chapman & Hall, New York, 1996.
11. Klusewitz, G. and Rerick, R., “Constraint management through the Drum—Buffer— Rope,” IEEE Advanced Semiconductor Manufacturing Conference, pp.275-280, 1998.
12. Kayton, D., “Using the theory of constraints’ production application in a semiconductor fab with a reentrant bottleneck,” IEEE/CPMT Int’l Semiconductor Manufacturing Technology Symposium, pp.352-357, 1998.
13. Lozinski, C. and Glassey C. R., “Bottleneck starvation indicators for shop floor control,” IEEE Transactions on Semiconductor Manufacturing, Vol. 1, No. 4, pp.147-153, 1988.
14. Matsuura, H. and Kurosu, S. and Lehtimaki, A. “Concepts, practices and expectations of MRP, JIT and OPT in Finland and Japan,” International Journal of Production Economics, Vol. pp.267-272, 1995.
15. Miltenburg, J., “Comparing JIT, MRP, and TOC, and embedding TOC into MRP,” International Journal of Production Research, Vol.33, No.4, pp.1147-1169, 1997.
16. Patterson, M. C., “Analysis of setup time at constraints resources,” International Journal of Production Research, Vol. 31, No. 4, pp.845-849, 1993.
17. Ronen, B. and Starr, M. K., “Synchronized Manufacturing As in OPT: From Practice to Theory,” Computers industrial Engineering, Vol. 18, No. 4, pp.585-600, 1990.
18. Rippenhagen, C. and Krishnaswamy, S., “Implementing the Theory of Constraints Philosophy in Highly Reentrant Systems,” Winter Simulation Conference, pp.993-996, 1998.
19. Schragenheim, E., and Ronen, B., “Drum-Buffer-Rope Shop Floor Control,” Production and Inventory Management Journal, Third Quarter, pp.18-23, 1990.
20. Schragenheim, E., and Ronen, B., “Buffer Management: A Diagnostic Tool for Production Control,” Production and Inventory Management Journal, Second Quarter, pp.74-79, 1991.
21. Spencer, M.S., “Using the Goal in An MRP System,” Production and Inventory Management Journal, pp.22-28, 1991.
22. Schroder, R.G., Anderson, J.C., Tupy, S.E., and Hite, E.M., “A Study of MRP Benefits and Costs,” Journal of Operations Management, Vol.2, No.1, pp.1-9, 1981.
23. Wu, S.Y., Morris, J.S. and Gordon, T.M., “ A Simulation Analysis of the Effectiveness of Drum-Buffer-Rope Scheduling in Furniture Manufacturing,” Computers &Industrial Engineering, Vol.26, NO4, pp.757-764,1994.
24. 王國政,「以限制理論研究在迴路作業下緩衝區對產出的影響」,國立交通大學,碩士論文,1993。
25. 李汶娟,「限制驅導式現場排程與管理機制之研究」,中華大學,碩士論文,2002。
26. 李長興,「限制理論在專業假撚廠生產管理之應用研究」,逢甲大學,碩士論文,2006。
27. 吳鴻輝、李榮貴,限制驅導式現場排程與管理技術,全華書局,1999。
28. 吳鴻輝,「瓶頸迴流前後作業之最佳作業間隔模式之研究」,工業工程學刊,第十七卷,第四期,349-358 頁,2000。
29. 翁立宇,「限制理論應用在配銷管理之實證研究」,國立交通大學,碩士論文,2004。
30. 陳義恒,「智慧型製造前置時間控制系統的發展」,東海大學,碩士論文,1994。
31. 陳建柏,「在工具機業關鍵零組件供料限制下運用限制驅導式排程之研究」,東海大學,碩士論文,2004。
32. 陳邑鑫,「考慮瓶頸作業下的排程方法」,南台科技大學,碩士論文,2004。
33. 陳建良,「排程概述」,機械工業雜誌,122-137頁,1996。
34. 張盛鴻、馮鈺敏、杜瑩美、黃承龍、李榮貴,「以限制理論為基礎之晶圓製造廠派工法則」,工業工程學刊,第16 期,第2 卷, 209-220頁,1999。
35. 張喬齡,「TOC式扣件生產系統之模擬實例研究」,國立成功大學,碩士論文,2004。
36. 張保隆等著,生產管理,華泰書局,1997。
37. 黃承龍、張盛鴻、李榮貴,「瓶頸漂移分析與對策之研究」,工業工程學刊,第十八卷,第四期,73-81頁,2001。
38. 傅豪,「IC Design House 之庫存管理改善 ~ 試行限制理論於 M公司之研究」,國立交通大學,碩士論文,2005。
39. 蔡佳蓉,「瓶頸迴流的限制驅導節奏之設計方法研究」,中華大學,碩士論文, 2001。
40. 葉麗芬,「雙目標非等效平行機台排程問題之探討」,元智大學,碩士論文, 2001。
41. 賴士葆,生產/作業管理-理論與實務,華泰書局,1993。
42. 謝忠志 ,「DBR現場排程及管理決策支援系統之建構-運用基因演算法及模糊理論」,國立台北科技大學,碩士論文, 2001。
43. 譚華山,「DBR在配電盤生產排程之可行性探討--以個案公司為例」,國立台灣科技大學,碩士論文, 2004。 |