參考文獻 |
1. Akgunduz, A.; Zetu, D.; Banerjee, P.; Liang, D. (2002). Evaluation of sub-component alternatives in product design processes. Robotics and Computer Integrated Manufacturing 18, pp. 69-81
2. Alegre-Vidal, J.; Lapiedra-Alcami, R.; Chiva-Gómez, R. (2004). Linking operations strategy and product innovation: an empirical study of Spanish ceramic tile producers. Research Policy 33, pp. 829-839
3. Bernroider, E.W.N. & Stix, V. (2006). Profile distance method—a multi-attribute decision making approach for information system investments. Decision Support Systems 42, pp. 988– 998
4. Browning, T.R. (2001). Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Transaction on Engineering Management 40(3), pp. 292-306.
5. Browning, T.R. & Eppinger, S.D. (2002). Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transaction on Engineering Management 49(4), pp.428-442.
6. Chan, L. & Wu, M. (2002). Quality function deployment: A literature review. European Journal of Operational Research 143, pp. 463-497
7. Chen, Y.-J.; Chen, Y.-M.; Wang, C.-B.; Chu, H.-C.; Tsai, T.-N. (2005a). Developing a multi-layer reference design retrieval technology for knowledge management in engineering design. Expert Systems with Applications 29, pp. 839-866.
8. Chen, C.-H.; Khoo, L.P.; Yan, W. (2005b). PDCS-a product definition and customisation system for product concept development. Expert Systems with Applications 28, pp. 591-602.
9. Chen, C.-H.; Khoo, L.P.; Jiao L. M. (2004). Information deduction approach through quality function deployment for the quantification of the dependency between design tasks. International Journal of Production Research 42(21), pp.4623-4637
10. Chen, P.P. (1981). Entity-relationship approach to information modeling and analysis. Proceedings of the 2nd International Conference on Entity-Relationship Approach, Amsterdam.
11. Chen, S.-J. & Lin, L. (2003). Decomposition of interdependent task group for concurrent engineering. Computers and Industrial Engineering 44, pp. 435-459.
12. Chen, C.-H.; Ling, S.F.; Chen, W. (2003). Project scheduling for collaborative product development using DSM. International Journal of Project Management 21, pp. 291-299.
13. Clemen, R.T. (1996). Making Hard Decisions: An Introduction to Decision Analysis. 2nd Ed., Duxbury Press, New York.
14. Cristiano, J.J.; Liker, J.K.; White, III, C.C. (2001). Key factors in the successful application of quality function deployment (QFD). IEEE Transactions on Engineering Management 48(1), pp.81-95
15. Czuchry, A.J. & Yasin, M.M. (2003). Managing the project management process. Industrial Management and Data Systems 103(1), pp. 39-46.
16. Darringer, J.A.; Bergamaschi, R.A.; Bhattacharya, S.; Brand, D.; Herkersdorf, A.; Morrell, J.K.; Nair, I.I.; Sagmeister, P.; Shin, Y. (2002). Early analysis tools for system-on-a-chip design. IBM Journal of Research and Development 46(6), pp. 691-707
17. Dvir, D.; Raz, T.; Shenhar, A.J. (2003). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management 21, pp. 89-95
18. Eppinger, S.D. & Salminen, V. (2001). Patterns of product development interactions. International Conference on Engineering Design, ICED 01 Glasgow, August 21-23.
19. FIPS (Federal Information Processing Standards Publication) 184 (1993a) Announcing the Standard for Integration Definition for Function Modeling (IDEF0) http://www.itl.nist.gov/fipspubs/idef02.doc
20. FIPS (Federal Information Processing Standards Publication) 184 (1993b) Announcing the standard for integration definition for information modeling (IDEF1X). http://www.idef.com/pdf/Idef1x.pdf
21. Hicks, B.J.; Cully, S.J.; Allen, R.D.; Mullineux, G.. (2002). A framework for the requirements of capturing, storing and reusing information and knowledge in engineering design. International Journal of Information Management 22, pp. 263-280
22. Hung, H.-F.; Kao, H.-P.; Ku, K.-C. (2007a). Evaluation of design alternatives in collaborative development and production of modular products. International Journal of Advanced Manufacturing Technology 33, pp. 1065-1076, Available online first at http://dx.doi.org/10.1007/s00170-006-0548-9.
23. Hung, H.-F.; Kao, H.-P.; Chu, Y.-Y. (2007b). An empirical study on knowledge integration, technology innovation and experimental practice. Expert Systems with Applications 36(4), Available online first at http://dx.doi.org/10.1016/j.eswa.2007.06.017.
24. Hung, H.-F.; Kao, H.-P.; Juang, Y.-S. (2007c). An integrated information system for product design planning. Expert Systems with Applications 37(1), Available online first at http://dx.doi.org/10.1016/j.eswa.2007.07.030.
25. Hwang, C.L. & Lin, M.J. (1987). Group Decision Making under Multiple Criteria- Methods and Applications, Springer-Verlag, Berlin Heidelberg.
26. Hwang, C.L.; Yoon, K.P. (1981). Multiple attribute decision making: Methods and applications, Springer, New York.
27. Kao, H.-P.; Su, E.; Wang, B. (2002). I2QFD: a blackboard-based multiagent system for supporting concurrent engineering projects. International Journal of Production Research 40(5), pp. 1235-1262
28. Karsak, E.E.; Sozer, S.; Alptekin, S.E. (2002). Product planning in quality function deployment using a combined analytic network process and goal programming approach. Computers & Industrial Engineering 44, pp. 171-190
29. Kim. Y.-M.; Kim, J.-H.; Kim, S.-H. (2000). Use of multi-attribute decision analysis for designing operations system framework in telecommunications management network. Computers & Operations Research 27, pp. 1375-1388
30. Kumar R, Midha PS (2001) A QFD based methodology for evaluating a company’s PDM requirements for collaborative product development. Industrial Management and Data Systems 101(3):126-131
31. Lahtinen, V.; Kuusilinna, K.; Kangas, T.; Hamalainen, T. (2002). Interconnection scheme for continuous-media systems-on-a-chip. Microprocessors and Microsystems 26, pp. 123-38.
32. Lee, E.; Woo, S.; Sasada, T. (2001). The evaluation system for design alternatives in collaborative design. Automation in Construction 10, pp. 295-301
33. Li, D. (2003). Fuzzy Multiobjective Many-Person Decision Makings and Games, National Defense Industry Press, Beijing.
34. Li, D.-F. (2007) Compromise ratio method for fuzzy multi-attribute group decision making. Applied Soft Computing 7, pp. 807–817
35. Loch, C. (2000). Tailoring product development to strategy: case of a European technology manufacturer. European Management Journal 18(3), pp. 246-258
36. Mohamed, A. & Celik, T. (2002). Knowledge based-system for alternative design, cost estimating and scheduling. Knowledge-Based Systems 15, pp.177-188
37. Myint, S. & Tabucanon, M.T. (1998). The framework for an expert system to generate alternative products in concurrent engineering design. Computers in Industry 37, pp. 125-134
38. Nellore, R. & Balachandra, R. (2001). Factors influencing success in integrated product development (IPD) projects. IEEE Transactions on Engineering Management 48(2), pp. 164-174
39. Park, K.S. & Kim, S.H. (1997). Tools for interactive multiattribute decision-making with incompletely identified information. European Journal of Operational Research 98, pp. 111-123.
40. Parker, H. (2000). Interfirm collaboration and the new product development process. Industrial Management and Data Systems 100(6), pp. 255-260
41. PMI (1996). A Guide to the Project Management Body of Knowledge. Project Management Institute.
42. Porter, M.E. (1985). Competitive Advantage: Creating and Sustaining Superior Performance. Free Press, New York
43. Porter, M.E. (1998). What is strategy. In Porter ME (ed). On Competition. Harvard Business School Press, Boston, pp 39-74
44. Prahalad, C.K. & Hamel, G. (1990). The core competence of the corporation. Harvard Business Review 68(3), pp. 79-91
45. Rao, A.; Carr, L.P.; Dambolena, I.; Kopp, R.J.; Martin, J.; Rafii, F.; Schlesinger, P.F. (1996). Total Quality Management: A Cross Functional Perspective. John Wiley & Sons, Inc., New York.
46. Rajsuman, R. (2000). System-on-a-Chip: Design and Test. Artech House, Boston.
47. Shtub, A.; Bard, J.F.; Globerson, S. (2004). Project Management: Processes, Methodologies, and Economics, 2nd Ed. Prentice-Hall International (UK) Limited, London.
48. Stalk, G.; Evans, P.; Shulman, L.E. (1992). Competing on capabilities: the new rules of corporate strategy. Harvard Business Review 70(2), pp. 57-69
49. Steward, D.V. (1981). The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management 28(3), pp. 71-74.
50. Triantaphyllou, E. (2000). Multi-Criteria Decision Making Methods: A Comparative Study. Kluwer Academic Publishers, Norwell.
51. Ulrich, K.T. & Eppinger, S.D. (2000). Product Design and Development. Second Ed. New York: McGraw-Hill.
52. Voros, J. (2002). Product balancing under conditions of quality inflation, cost pressures and growth strategies. European Journal of Operational Research 141, pp. 153-166
53. Westerveld, E. (2003). The project excellence model: linking success criteria and critical success factors. The Journal of Product Innovation Management 21, pp. 411-418
54. Xu, X.W. & Liu T. (2003). A web-enabled PDM system in a collaborative design environment. Robotics and Computer Integrated Manufacturing 19, pp. 315-328
55. Zanakis, S.H.; Solomon, A.; Wishart, N.; Dublish, S. (1998). Multiattribute decision making: A simulation comparison of select methods, European Journal of Operational Research 107 (3), pp. 507-529.
56. Zhang, Q.; Lim. J.-S.; Cao, M. (2004). Innovation-driven learning in new product development: a conceptual model. Industrial Management and Data Systems 104(3), pp. 252-261 |