參考文獻 |
一、西文部份:
1.Bordoloi, S.K., Cooper, W.W., Matsuo, H., 1999. Flexibility, adaptability, and efficiency in manufacturing systems. Production and Operations Management, 8 (2), 133-150.
2.Chung, P.W.H., Cheung, L., Stade, J., Jarvis, P., Moore, J., Macintosh, A., 2003. Knowledge-based process management : an approach to handling adaptive workflow. Knowledge-Based Systems, 16, 149–160.
3.Cooper, R., Slagmulder, R., 2004. Achieving full-cycle cost management. MIT Sloan Management Review, 46 (1), 44-53.
4.Demeulemeester, E.L., Herroelen, W.S., 1996. Optimal procedures for the discrete time/cost trade-off problem in project networks. European Journal of Operational Research, 88 (1), 50-68.
5.Dunne, E.J., Ghosh, J.B., Wells, C.E., 1995. The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, 81 (2), 225-238.
6.Ettlie, J.E., 1997. Quality, technology, and global manufacturing. Production and Operations Management, 6 (2), 150-188.
7.Hill, Charles, W.L., Gareth, R.J., 1995. Strategic Management Theory. 3/ed, Houghton Mifflin Co.
8.Kaiser, H.F., 1960. The application of electronic computers to factor analysis. Educational and Psychological Measurement, 20, 141-151.
9.Kerkhoff, J., Eager, T.W., Utterback, J., 1998. A systematic strategy for optimizing manufacturing operations. Production and Operations Management, 7 (1), 67-85.
10.Kušar, J., Duhovnik, J., Grum, J., Starbek, M., 2004. How to reduce new product development time. Robotics and Computer-Integrated Manufacturing, 20 (1), 1-15.
11.Park, J.H., Seo, K.K., 2004. Incorporating life-cycle cost into early product development. Proceedings of the Institution of Mechanical Engineers, 218 (9), 1059-1066.
12.Pisano, G.P., 1996. Learning-before-doing in the development of new process technology. Research Policy, 25 (7), 1097-1119.
13.Porter, M.E., 1980. Competitive Advantage: Techniques for Analyzing Industries and Competitors. The Fee Press, New York.198-202.
14.Prabuddha, De., Dunne, E.J., Ghosh, J.B., Wells, C.E., 1995. The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, 81 (2), 225-238.
15.Saraiva, P.M., Stephanopoulos, G., 1998. An exploratory data analysis approach within an interval-based optimization framework. Production and Operations Management, 7 (1), 19-37.
16.Scheer, A.W., 1992. Architecture of Integrated Information Systems: Foundations of Enterprise Modeling. Springer, Berlin.
17.Sloan, T.W., Shanthikumar, J.G., 2000. Combined production and maintenance scheduling for a multiple-product, single-machine production system. Production and Operations Management, 9 (4), 379-399.
二、中文部份:
1. 陳順宇(2004),多變量分析,華泰書局,第三版 |