參考文獻 |
1. 汪進財、劉得昌「動態班機排程方法」,運輸計劃季刊,第二十三卷,第三期,第327-348頁,1993。
2. 汪進財、盧清泉,「臨時飛航事件班機調度因應策略之研究」,運輸計劃季刊,第二十五卷,第二期,第255-288頁,1996。
3. 陳春益、李宇欣與盧華安「飛機調度與定期維修整合模式之研究」,運輸計劃季刊,第二十六卷,第一期,第69-94頁,1997。
4. 顏上堯、何淑萍,「飛航排程暨班次表之建立」,運輸計劃季刊,第二十三卷,第一期,第73-90頁,1994。
5. 顏上堯、羅智騰「因應預期性航具維修之系統飛航排程」,中國土木水利工程學刊,第八卷,第三期,第447-456頁,1996。
6. Arguello, M. F., Bard, J. F. and Yu, G.,”A GRASP for Aircraft Routing in Response to Groundings and Delays,” Journal on Combinatorial Optimization, Vol. 5, 211-228, 1997.
7. Bird, C. J., “A Branch and Bound Approach to Aircraft and Maintenance Scheduling,” AGIFORS 17, 1977.
7. Bird, C. J., “A Branch and Bound Approach to Aircraft and Maintenance Scheduling,” AGIFORS 17, 1977.
9. Deckwitz, T.A., ”Interactive Dynamic Aircraft Scheduling,” Flight Transportation Laboratory, Report R-84-5. Massachusetts Institute of Technology, 1984.
10. Etschmaier, M. M. and D. F. X. Mathaisel, “Aircraft Scheduling the State of the Art,” AGIFORS 24, 1984.
10. Etschmaier, M. M. and D. F. X. Mathaisel, “Aircraft Scheduling the State of the Art,” AGIFORS 24, 1984.
12. Feo, T. A. and J. F. Bard, “Flight Scheduling and Maintenace Base Planning,” Management Science, Vol. 35, No. 12, pp. 1415-1432,1989.
13. Gershkoff, I., “Aircraft Shortage Evaluator,” presented at ORSA/TIMS Joint National Meeting, St.Louis, MO,1987.
14. Gray, P., “System Tool for Aircraft Routing,” AGIFORS 25, 1985.
15. Healy, P., “A Tool for Adjusting the Flight Schedule During High Volume Irregular Operations,” AGIFORS 32, 1992.
16. Jarrah, A.I., G. Yu, N. Krishnamurthy and A. Rakshit, “A Decision Support Framework for Airline Flight Cannellations and Delay,” Transportation Science, Vol.27, No.3, 1993.
17. Jedlinsky, D. C., “The Effect of Interruptions on Airline Schedule Control,” Massachusetts Institute of Technology, August, 1967.
18. Joshi, S. and R. Muthukrishnan, “Incremental Tools for Aircraft Schedule Control,” Massachusetts Institute of Technology, August 1993.
19. Krishnamurthy, N., “Models for Irregular Operation at United Airlines,” AGIFORS 31, 1991.
20. Levin, A., “Some Fleet Routing and Scheduling Problems for Air Transportation Systems,” MIT, FTL Report R68-5, January 1969.
21. Nakazawa, S., “Dynamic Scheduling in Operation Control System,” AGIFORS 31, 1991.
22. Richter R. J., “Experience with the Aircraft Rotation Model,” AGIFORS 10, 1970.
23. Simpson, R. W., “Scheduling and Fleet Routing Models for Airline Systems,” MIT, FTL Report R68-3, December 1969.
24. Tdodorovic, D. and G. Stojkovic, “Model for Operational Daily Airline Scheduling,” Transportation Planning and Technology, Vol. 14, pp.273-285, 1990.
25. Tdodorovic, D., ”A Model for Designing the Meteorologically Most Reliable Airline Schedule,” European Journal of Operational Research, Vol.21, No.2, pp. 156-164,1985.
25. Tdodorovic, D., ”A Model for Designing the Meteorologically Most Reliable Airline Schedule,” European Journal of Operational Research, Vol.21, No.2, pp. 156-164,1985.
27. Teodorovic,D.,Airline Operation Research, Gordon and Breach Science Publishers, Ch.3, pp.172-281,1988.
28. Yan S, and Young H. F.,”A Decision Support Framework for Multi-fleet Routing and Multi-stop Flight Scheduling,” Transp Res,-A, Vol. 30, No.5, pp379-398.
29. Yan, S and Lin, C.,”Airline Scheduling for the Temporary Closure of Airports,” Transportation Science, Vol. 31, 72-82, 1997.
30. Yan, S and Tu, Y.,”Multi-Fleet Routing and Multi-Stop Flight Scheduling for Schedule Perturbation,” European Journal of Operational Research, Vol. 103, 155-169, 1997.
31. Yan, S. and Yang, D.,”A Decision Support Framework for Handling Schedule Perturbation,” Transportation Research, Vol. 30B, 405-419, 1996.
31. Yan, S. and Yang, D.,”A Decision Support Framework for Handling Schedule Perturbation,” Transportation Research, Vol. 30B, 405-419, 1996. |