參考文獻 |
參考文獻
Al Khalil, M. I. (2002). “Selecting the appropriate project delivery method using AHP.” International Journal of Project Management, 20(6), 469-474.
Al-Harbi, Al-Subhi, K. M. (2001). “Application of the AHP in project management.” International Journal of Project Management, 19(1), 19-27.
Altrock, C. V. & Krause, B. (1994). “Multi-criteria decision-making in German automotive industry using fuzzy logic.” Fuzzy Sets and Systems, 63(3), 375-380.
Arrow, K. J. (1951, 1963 rev. ed.). Social Choice and Individual Value, 2nd edition, New Haven, Yale University Press.
Arrow, K. J. & Intriligator, M. D. (1986). Handbook of Mathematical Economics, Volume III, New York, Elsevier.
Bellman, R. E. & Zadeh, L. A. (1970). “Decision-making in a fuzzy environment.” Management Science, 17(4), 141-164.
Buckley, J. J. (1985). “Ranking alternatives using fuzzy numbers.” Fuzzy Sets and Systems, 15(1), 21-31.
Carlson, C. & Fuller, R. (1996). “Fuzzy multiple criteria decision making: Recent developments.” Fuzzy Sets and Systems, 78(2), pp.139-153.
Chang, P. L. & Chen, Y. C. (1994). “A fuzzy multi-criteria decision making method for technology transfer strategy selection in biotechnology.” Fuzzy Sets and Systems, 63(1), 131-139.
Chen, S. J. & Hwang, C. L. (1992). Fuzzy Multiple Attribute Decision Making, Methods and Applications, Springer-Verlag Berlin Heidelberg.
Chen, Y. C. (2002). “An application of fuzzy set theory to external performance evaluation of distribution centers in logistics.” Soft Computing, 6(1), 64-70.
Cheng, C. H. & Mon, D. L. (1994). “Evaluating weapon system by Analytical Hierarchy Process based on fuzzy scales.” Fuzzy Sets and Systems, 63(1), 1-10.
Cheung, S. O., Lam, T. I., Leung, M. Y. & Wan, Y. W. (2001). “An analytical hierarchy process based procurement selection method.” Construction Management and Economics, 19(1), 427-437.
Cheung, F. K. T., Kuen, J. L. F. & Skitmore, M. (2002). “Multi-criteria evaluation model for the selection of architecture consultants.” Construction Management and Economics, 20(7), 569-580.
Chu, A. T. W., Kalaba, R. E. & Spingarn, K. (1979). “A Comparison of Two Methods for Determining the Weights of Belonging to Fuzzy Set.” Journal of Optimization Theory and Applications, 27(4), 531-538.
Davis, L. & Williams, G. (1994). “Evaluating and Selecting Simulation Software Using the Analytic Hierarchy Process.” Integrated Manufacturing Systems, 5(1), 23-32.
Dubois, D. & Prade, H. (1978). “Operations on fuzzy numbers.” International Journal of Systems Science, 9(6), 613-626.
Fishburn, P. C. (1973). Theory of Social Choice, Princeton University Press, Princeton, New Jersey.
Fong, S. W. & Choi, S. K. Y. (2000). “Final contractor selection using the analytical hierarchy process.” Construction Management and Economics, 18(5), 547-557.
Goodman, L. A. & Markowitz, H. (1952). “Social Welfare Function Based on Individual Rankings.” American Journal of Sociology, 58(3), 257-262.
Hastak, M. (1998). “Advanced automation or conventional construction process.” Automation in Construction, 7(4), 299-314.
Hwang, C. L. & Lin, M. J. (1987). Lecture Notes in Economics and Mathematical Systems Vol.281: Group Decision Making under Multiple Criteria: Methods and Applications, Now York, Springer-Verlag.
Hwang, C. L. & Masud, A. S. Md. (1979). Lecture Notes in Economics and Mathematical Systems Vol.164: Multiple Objective Decision Making- Methods and Applications, Now York, Springer-Verlag.
Hwang, C. L. & Yoon, K. (1981). Multiple Attribute Decision Making: Methods and Applications, New York: Springer-Verlag.
Keeney, R. L. & Raiffa, H. (1993). Decisions with Multiple Objectives: Preference and Value Tradeoffs, New York, Wiley.
Laarhoven, P. J. M. & Pedrycz, W. (1983). “A fuzzy extension of Saaty’s priority theory, Fuzzy Sets and Systems.” 11(3), 229-241.
Ling, Y. Y. (2003). “A conceptual model for selection of architects by project managers in Singapore.” International Journal of Project Management, 21(2), 135-144.
Lu, S. T., Hsieh, T. Y., Lee, J. S. & Tzeng, G, H. (2001). “A Decision Support System for Planning and Design Tender Selection in Public Buildings.” Proceedings of the First International Conference on Electronic Business (ICEB), Hong Kong, December 19-21, 215-217.
Mahdi, I. M., Riley, M. J., Fereig, S.M. & Alex, A. P. (2002). “A multi-criteria approach to contractor selection.” Engineering Construction and Architectural Management, 9(1), 29-37.
McIntyre, C. and Parfitt, M. K. (1998). “Decision support system for residential land development site selection process.” Journal of Architectural Engineering, ASCE, 4(4), 125-131.
Mueller, D. C. (1989). Public Choice II: A revised edition of Public Choice, Cambridge University Press, New York.
Saaty, T. L. (1977). “A scaling method for priorities in hierarchical structures.” Journal of Mathematical Psychology, 15(2), 234-281.
Saaty, T. L. (1980). The analytic hierarchy Process, McGraw-Hill, New York.
Saaty, T. L. (1990). Decision Making For Leaders, University of Pittsburgh.
Seo, F. & Sakawa, M. (1985). “Fuzzy Multiattribute Utility Analysis for Collective Choice.” IEEE Transactions on Systems, Man, and Cybernetics, SMC-15(1), pp.45-53.
Tang, M. T., Tzeng, G. H. and Wang, S. W. (1999). “A Hierarchy fuzzy MCDM method for studying electronic marketing strategies in the information service industry.” Journal of International Information Management, 8(1), 1-22.
Teng, J. Y. and Tzeng, G. H. (1996). “Fuzzy multicriteria ranking of urban transportation investment alternatives.” Transportation Planning and Technology, 20(1), 15-31.
Tsaur, S. H., Tzeng G. H. & Wang G. C. (1997). “The application of AHP and fuzzy MCDM on the evaluation study of tourist risk.” Annals of Tourism Research, 24(4), 796-812.
Tzeng, G. H., Shiah, T. A. & Teng, J. Y. (1994). “A multiobjective decision making approach to energy supply mix decisions in Taiwan.” Energy Sources, 16(3), 301-316.
Tzeng, G. H., Tzen, M. H., Chen, J. J. & Opricovic, C. (2002). “Multicriteria selection for a restaurant location in Taipei.” International Journal of Hospitality Management, 21(2), 175-192.
Zadeh L. A. (1965). “Fuzzy sets.” Information and Control, 8(2), 338-353.
Zadeh L. A. (1975, 1976). “The concept of a linguistic variable and its application to approximate reasoning.” Information Sciences, 8(1), 199-249, 8(2), 301-357; 9(3), 43-80.
Zeleny, M. (1982). Multiple Criteria Decision Making, New York, McGraw-Hill.
王文俊(2000),認識Fuzzy,全華科技圖書,台北。
王錦堂、劉克峰(1997),建築設計指導,東華書局,台北。
王國武(2002),政府採購法決標方式之決策分析暨其權重實證的研究,國防大學國防管理學院後勤管理研究所碩士論文。
石國宏(2001),戰後臺灣建築競圖中「建築樣式」與「文化表徵」關係之研究—以公共建築為例,中原大學建築研究所碩士論文。
行政院公共工程委員會(2003),政府採購法令彙編。
行政院公共工程委員會(2003),最有利標作業手冊。
呂守陞、余壬癸 (2002),「山坡地開發雜項工程影響因子評估之研究」,建築學報,第39期,第71-86頁。
呂世通、謝定亞、曾國雄(2002),「模糊多評準決策法於公共建築規劃設計方案之評選」, 2002中華民國都市計畫、區域科學與住宅學會聯合年會暨研討會論文摘要集,台北大學,第 F2-1-F2-2頁。(full paper in CD-ROM)
李文智、梁瓊如、林惠玲、陳正倉(1997),統計學-問題與解答,雙葉書廊,台北。
余斯慰、唐治平(2001),「最有利標運用AHP法決標之研究」,第五屆營建工程與管理研究成果聯合發表會,第617-630頁,雲林科技大學。
林益源(1987),公共工程技術顧問評選決標方式之研究,台灣大學土木工程學系碩士論文。
黃有光 (1999) ,福利經濟學,茂昌圖書有限公司,台北。
黃忠發、呂世通、謝定亞(2001),「營造業外包商評選決策模式之建立與應用」,知識經濟、科技創新與組織管理學術研討會,銘傳大學台北校區,第 474-491頁。
周正祥(1998),公共工程最有利標決標模式之研究,國立台灣科技大學營建工程技術研究所碩士論文。
徐益梁(1998),應用模糊多評估準則決策於工程最有利標之研究,淡江大學建築學系碩士論文。
陳盛隆(2003),公共工程採最有利標評選施工廠商作業之研究,中華大學營建管理研究所碩士論文。
陳海鳴(1993),管理概論-理論與台灣實證,第三版,華泰文化事業有限公司,台北。
郭斯傑、蔡洲顥(1999),「建築工程系統模板評選決策模式之建立與應用」,建築學報,第31期,第91-105頁。
曾國雄、蕭再安、鄧振源,(1988),「多評準決策方法之分析比較」,科學發展月刊,第16 卷第7 期,1008~1017 頁。
曾國雄,鄧振源,「AHP的內涵特性與應用(上)、(下)」,中國統計學報,第二十七卷,第六期,第5-22頁、第二十七卷第七期,第1-20頁(1989)。
曾浩璽、王翊(2003),「最有利標選商模式之缺失及其改善建議」,第七屆營建工程與管理研究成果聯合發表會論文全集,第142-149頁,高雄第一科技大學。
楊錫麒、李益昌、高慈穗(2001),「公共工程評選制度對設計管理之影響」,第五屆營建工程與管理研究成果聯合發表會,第485-492頁,雲林科技大學。
審計部台北市審計處(2002),臺北市政府暨所屬各機關九十年度列管重大工程計畫執行情形,專案調查報告。
謝定亞,呂世通,徐國堂(2002),「模糊多評準決策在國民學校工程採購模式評選之應用」,公共事務評論,第三卷,第一期,第1-36頁。
劉馨隆(2000),公共工程建設計畫時序性組合規劃之研究,中央大學土木工程學系博士論文。 |