參考文獻 |
Ahmed, E., Magdy, A., Fu, C. C., and Curt, D. A., “Developing a Quality Measure for Evaluating the Contractor Performance in Asphalt Pavement Construction.” International journal of pavement research and technology, 6(1), 22-30, 2013.
Akintoye, A., and MacLeod, M.J., “Risk analysis and management in construction.” International Journal of Project Management, PRM, Vol.15, No.1, pp31-38, 1997.
Alarcón, L. F., and Mourgues, C., “Performance Modeling for Contractor Selection.” Journal of Management in Engineering ,ASCE, 18(2), 52-60, 2002.
Anderson, W. L., and Ross, R. L., “The methodology of profit maximization:An Austrian alternative.” Journal of Austrian Economics, 8(4), 31-34, 2005.
Ballard, G., and Howell, G., “Implementing Lean Construction: Improving Downstream Performance.” Proceedings of the Second Annual Conference of the International Group for Lean Construction, Santiago, Chile, 1994.
Bräysy, O. and Gendreau M., “Vehicle Routing Problem with Time Windows, Part I: Route Construction and Local Search Algorithms.” Transportation Science, 39, 104–118, 2005.
Cripps, M., and Norman, I., “The Design of Auctions and Tenders With Quality Thresholds: The Symmetric Case.” The Economic Journal, 104:316-326, 2004.
Dixon, D., “The Truce between Lean and IT,” Industrial Engineer, Vol. 36, pp. 42-45, 2004.
Egemen, M., and Mohamed, A. N., “A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions.” Building and Environment, 42, 1373-1385, 2007.
Friedman, L., “A competitive bidding strategy.” Operations Research, Vol. 1, No.4, pp. 104-112, 1956.
Feng, C. W., and Wu, H. T., “Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks.” Automation in Construction, Vol. 15(2), pp. 186-199, 2004.
George, J. M., Rowlands, D., and Kastel, B., “Lean Six Sigma.” The McGraw-Hill Companies, Inc, 2002.
George, J. M., and Jones, G. R., “Understanding and managing organizational behavior.” Upper Saddle River, NJ: Pearson Prentice Hall, 2008.
Halpin, D. W. and Riggs, L. S., “Planning and Analysis of Construction Operations.” Wiley, New York, 1992.
Haur, J. C., Shang, I. L., and Tih, J. C., “Human Resource Allocation Model in Pavement Engineering.” International journal of pavement research and technology, 6(5):643-650, 2013.
Howell, G. and Ballard, G., “Implementing Lean Construction: Understanding and Action.” Proceedings Sixth Annual Conference of the International Group for Lean Construction, IGLC-6 IGLC-6, Guaruja, Brazil,pp. 13-15 August, 2008.
Howell, G. A., “What Is Lean Construction–1999. ” Proceedings Seventh Annual Conference of the International Group for Lean Construction, IGLC-7, Berkeley, C. A., July 26-28. 1-10, 1999.
Huang, S. J. and Han, W.M., “An empirical analysis of risk components and performance on software projects,” The Journal of System and Software, Vol. 80, pp. 42-50, 2007.
Huseby, A. B. and Stogen, S., “Dynamic risk analysis:the DynRisk concept.”International Journal of Project Management, Vol. 10, No. 3, pp. 160-164, 1992.
Jieh, H. C., Shang, I. L. and Tih, J. C., “Human Resource Allocation Model in Pavement Engineering,” International journal of pavement research and technology,Vol. 6(5),pp. 643-650, 2013.
Jiang, J. J. and Klein, G., “Risks to different aspects of system success.” Information & Management, 36,263-272, 1999.
Kristy, O. C., Kathleen, E. M., and Roger, G. S., “ Relationships between implementation of TQM, JIT, and TPM and manufacturing performance.” Journal of Operations Management, 2001.
Lee, S. H., Diekmann, J. E., Songer, A. D. and Brown, H., “Identifying Waste:Applications of Construction Process Analysis.” Proceedings Seventh Annual Conference of the International Group for Lean Construction, IGLC-7, Berkeley, C.A., July 26-28. 63-72. Vol. 19, Issue 6, pp. 675–694, 1999.
Lin, C. T., and Chen, Y. T., “Bid/no-bid decision-making – a fuzzy linguistic approach.” International Journal of Project Management, 22, 585–593, 2004.
March, J.G. and Shapira, Z., “Managerial perspectives on risk and risk taking.” Management Science, Vol. 33, No. 11, pp. 1404-1418, 1987.
Ningyuan, L., Susan, T., Guoping, Q. and Zhaohui, L., “The Roles of Applied Performance Indicators in Network Pavement Management – Canadian Experience.” International journal of pavement research and technology, 6(5):673-678, 2013.
Salem, O., Solomon, J., Genaidy, A., and Luegring, M., “Site Implementation and Assessment of Lean Construction Techniques,” Lean Construction Journal 2005 ,Vol 2 # 2 October, 2005.
Salem, O., Solomon, J., Genaidy, A., and Minkarah, I., “Lean Construction: From Theory to Implementation.” Journal of Management in Engineering, 22(4), 168–175, 2006.
Sameh, Z., Abdullah, A. H., and Sultan, A. H., “Integration of Construction Quality in Makkah Municipality Pavement Management Maintenance System (PMMS).” International journal of pavement research and technology, 6(5):679-687, 2013.
Shen, J. Q., Lie, Y. D., Han, B. L. and Xiao, Y. D., “ Real-time and Dynamic Schedule Optimization of Construction Projects on the Basis of Lean Construction. ” Journal of Chongqing University, 6(3):177-186, 2007.
Smith, G. R. and Bohn, C. M., “Small to Medium contractor contingency and assumption of risk.” Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 2, pp. 101-108, 1999.
Pranshoo, S., Musharraf, Z., David, A., and Zahid, H., “Field Construction and Mechanistic Performance of Hot Mix Asphalt Containing Reclaimed Asphalt Pavement.” International journal of pavement research and technology, 6(4):403-413, 2013.
Thompson, P. M., and Psaraftis, H., “Cyclic Transfer Algorithms for Multi-Vehicle Routing and Scheduling Problems.” Operations Research, 41, pp. 935-946, 1993.
Yi, J., Guangyuan, Z., Shuo, L., Bowen, G. and Yonghong, Y., “A Model for Life-Cycle Benefit and Cost Analysis of Highway Projects.” International journal of pavement research and technology, 6(5):633-642, 2013.
丁滌塵、陳建良、程振寰、黃博滄、王孔政、黃建融,「以精實生產與無線射頻辨識技術提升倉儲作業效率」,品質學報,21卷1期,1~15頁,2014。
王順生,許再豐,「以精實生產改善企業成本競爭力」,中國工業工程學會九十八年度年會暨學術研,2009。
古柏,辛德勒,企業硏究方法,古永嘉、楊雪蘭譯,三版,麥格羅希爾出版,臺北市,2010。
江靜芳,「精簡營建於預拌混凝土供應鏈應用之研究」,國立中央大學,土木工程研究所,碩士論文,1999。
宋秉清,「風險管理應用於營建工程專案之研究─以捷運新莊線為例」,國立臺灣海洋大學,河海工程學系,碩士論文,2011。
余幼龍,工廠流程管理,初版,憲業企管發行,臺北市,2006。
李長貴,績效管理與績效評估,初版,華泰發行,臺北市,1997。
何應欽,「精實生產導入與推動之探討-以A公司為研究對象」,國立中央大學,土木工程研究所,,碩士論文,2007。
呂英志,「即時資訊下車輛路線問題之研究」,逢甲大學,交通工程與管理研究所,碩士論文,2002。
芬奇,現代作業管理,黃聯海譯,三版,麥格羅希爾出版,臺北市,2010。
邱政章,「基於機率原理的競標理論在臺灣地區營造業競標之實證研究」,中華大學,土木工程研究所,碩士論文,1999。
吳有微,「工程專案時程風險管理蒙地卡羅模擬之應用」,中興工程季刊,108期,P55-65,2010。
吳獻堂,「動態營建資源即時配送最佳化模式之開發—以混凝土配送為例」,國立成功大學,土木研究所,博士論文,2006。
洪顯宗,「捷運工程施工風險評估模式之研究」,國立中央大學,營建管理研究所,碩士論文,2008。
林植峰,「瀝青混凝土路面施工品質管理-以雪山隧道為例」,國立中央大學土木工程研究所碩士在職專班,2007。
林信宏,「海運承攬運送業顧客流失風險管理之研究」,國立高雄海洋科技大學,航運管理研究所,碩士論文,2012。
林宏偉,「瀝青混凝土鋪面加鋪作業溫降量測之開放交通時機研究」,國立中央大學,土木工程研究所,碩士論文,2002。
林傑斌,劉明德,陳湘,資料採掘與OLAP理論與實務,初版,文魁資訊,臺北市,2002。
胡政源,質化與量化技術與應用,初版,鼎茂圖書,臺中市,2009。
柯韋如,「營造廠執行專案採購精實管理之研究」,國立臺灣大學,土木工程學研究所,碩士論文,2007。
孫崇文,「道路瀝青混凝土鋪築效益最佳化之研究」,國立中央大學,土木工程研究所,碩士論文,2009。
翁振益,周瑛琪,決策分析方法與應用,初版,華泰文化,臺北市,2007。
翁大哲,「多場站物流配送系統之動態車輛指派與路徑規劃」,國立雲林科技大學,土木工程研究所,碩士論文,1998。
姜堯民,財務管理原理,初版,新陸書局,臺北市,2005。
馬修梅,看豐田如何年化百萬創意為千萬獲利,劉復苓譯,初版,經濟新潮社出版,臺北市,2008。
高旭超,「公路工程項目風險管理系統模型及其應用」,山東科技大學學報,24卷4期,2005。
連忠銓,「動態即時路徑規劃應用於物流管理之研究」,醒吾技術學院,資訊科技應用研究所,碩士論文,2010。
陳耀茂,可靠度工程方法與應用,初版,五南出版,臺北市,民國90年。
陳水湶,「探討精實產品設計與管理之概念」,品質月刊,第44卷第4期, 17-26頁,2008。
陳坤賓、胡黃德,「模擬退火演算法應用於車輛途程問題之研究」,中國工業工程學會八十七年度年會論文集,494~499 頁,1998。
陳伊枷,「公共工程得標廠商特性分析」,中央大學,營建管理研究所,碩士論文,2008。
陳怡如,「以精實管理及模擬最佳化求解高科技廠建廠施工人力數量問題」,國立成功大學,製造資訊與系統研究所,碩士論文,2013。
陳重秀,「瀝青混凝土拌和廠提昇經營管理策略之研究」,國立中央大學,土木工程研究所,碩士論文,2008。
陳耀光,「整合性競標策略模型之模擬研究」,國立成功大學,建築研究所,碩士論文,1997。
許光華,何文榮,專案管理_理論與實務,初版,華泰出版,臺北市,1998。
郭志浩,豐田汽車管理模式,初版,憲業企管社,臺北市,2008。
郭育仁,「營建工程投標決策模擬研究」,國立成功大學,製造資訊與系統研究所,碩士論文,2010。
廖培倫,「嵌入式無線通訊整合之物流管理車用系統設計與實現」,淡江大學,土木工程研究所,碩士論文,2009。
鄧家駒,風險管理 Risk Management,四版,華泰發行,臺北市,2005。
鄭燦堂,風險管理_理論與實務,初版,五南出版社,台北市,2013。
蔡明高,「瀝青混凝土拌和廠導入資訊化之探討」,國立中央大學,土木工程研究所,碩士論文,2008。
蔡斯偉,「考慮生產排程及產能限制之預拌混凝土車輛派遣問題研究」,中華大學,運輸科技與物流管理學系,碩士論文,2012。
範旭濤,單旭國,「工程項目風險應對策略」,遼寧行政學院學報,10卷8期,2008。
劉明德,柳克婷,數量方法,初版,新文京開發,臺北縣中和市,2006。
劉宛陵,「公共工程開口合約之研究-以公路維護為例」,國立中央大學,營建管理研究所,碩士論文,2006。
劉祐帆,「公共工程專案風險管理系統之研究-以捷運工程為例」,臺灣大學,土木工程學研究所,碩士論文,2009。
劉家駒、沈育樹、林修正,「全面生產維護功能模式分析」,亞東學報,30期,143~166頁,2010。
賴湛培,「考慮原料補貨之預拌混凝土車輛聯合派遣問題研究」,中華大學,運輸科技與物流管理研究所,碩士論文,2010。
鍾朝嵩,TQM實踐法全面品質管理,初版,和昌發行,桃園縣,2010。
鍾雅芳,「運用精實六標準差手法改善資料品質─某TFT-LCD業者之個案研究」,國立中央大學,資訊管理學系,碩士論文,2011。
謝權信,「智慧型e化車輛導航系統研究」,中華大學,土木工程研究所,碩士論文,2002。
顏春煌,資料結構與演算法,初版,空大出版,臺北縣,2000。
韓治強,「營造業剩餘土石方清運工程最佳化研究」,國立中央大學,土木工程研究所,碩士論文,2012。
魏金灶,「工程投標案件評選模式之研究」,國立中央大學,土木工程研究所,碩士論文,2002。
蕭舜元、李榮貴、蔡志弘、蔡世傑,「QC改善履歷及精實六標差在改善活動方法上之整合及活用」,東亞論壇,468期,41~68頁,2010。 |