參考文獻 |
[1] 莊孟蒼,2013,設計並建立一個基於軟體專案變更影響之綜合分析模型,國立中央大學碩士論文。
[2] Ahmad, A., & Dey, L. (2007). A k-mean clustering algorithm for mixed numeric and categorical data. Data & Knowledge Engineering, 63(2), 503-527.
[3] Al-Sedairy, S. T. (2001). A change management model for Saudi construction industry. International Journal of Project Management, 19(3), 161-169.
[4] Alguwaizani, A. (2012). Degeneracy on K-means clustering. Electronic Notes in Discrete Mathematics, 39, 13-20.
[5] Ali, U., & Kidd, C. (2014). Barriers to effective configuration management application in a project context: An empirical investigation. International Journal of Project Management, 32(3), 508-518.
[6] Black, S. (2008). Deriving an approximation algorithm for automatic computation of ripple effect measures. Information and Software Technology,50(7), 723-736.
[7] Borra, S., & Di Ciaccio, A. (2010). Measuring the prediction error. A comparison of cross-validation, bootstrap and covariance penalty methods. Computational statistics & data analysis, 54(12), 2976-2989.
[8] Braglia, M., & Frosolini, M. (2014). An integrated approach to implement Project Management Information Systems within the Extended Enterprise. International Journal of Project Management, 32(1), 18-29.
[9] Chang, D. X., Zhang, X. D., & Zheng, C. W. (2009). A genetic algorithm with gene rearrangement for K-means clustering. Pattern Recognition, 42(7), 1210-1222.
[10] Cheikhi, L., Abran, A., & Desharnais, J. M. (2012, October). Analysis of the ISBSG software repository from the ISO 9126 view of software product quality. In IECON 2012-38th Annual Conference on IEEE Industrial Electronics Society (pp. 3086-3094). IEEE.
[11] Chen, C. Y., & Chen, P. C. (2009). A holistic approach to managing software change impact. Journal of Systems and Software, 82(12), 2051-2067.
[12] Chen, S. P., & Tsai, M. J. (2011). Time–cost trade-off analysis of project networks in fuzzy environments. European Journal of Operational Research, 212(2), 386-397.
[13] Choi, K., & Kwak, Y. H. (2012). Decision support model for incentives/disincentives time–cost tradeoff. Automation in Construction, 21, 219-228.
[14] Delen, D., Walker, G., & Kadam, A. (2005). Predicting breast cancer survivability: a comparison of three data mining methods. Artificial intelligence in medicine, 34(2), 113-127.
[15] Di Fatta, G., Blasa, F., Cafiero, S., & Fortino, G. (2013). Fault tolerant decentralised K-Means clustering for asynchronous large-scale networks. Journal of Parallel and Distributed Computing, 73(3), 317-329.
[16] Dillibabu, R., & Krishnaiah, K. (2005). Cost estimation of a software product using COCOMO II. 2000 model–a case study. International Journal of Project Management, 23(4), 297-307.
[17] Estublier, J., Leblang, D., Hoek, A. V. D., Conradi, R., Clemm, G., Tichy, W., & Wiborg-Weber, D. (2005). Impact of software engineering research on the practice of software configuration management. ACM Transactions on Software Engineering and Methodology (TOSEM), 14(4), 383-430.
[18] Fang, C., Jin, W., & Ma, J. (2013). k’-Means algorithms for clustering analysis with frequency sensitive discrepancy metrics. Pattern Recognition Letters, 34(5), 580-586.
[19] Guerrero, M. A., Villacampa, Y., & Montoyo, A. (2014). Modeling construction time in Spanish building projects. International Journal of Project Management, 32(5), 861-873.
[20] Hazır, Ö., Haouari, M., & Erel, E. (2010). Robust scheduling and robustness measures for the discrete time/cost trade-off problem. European Journal of Operational Research, 207(2), 633-643.
[21] Horsburgh, J. S., & Reeder, S. L. (2014). Data visualization and analysis within a Hydrologic Information System: Integrating with the R statistical computing environment. Environmental Modelling & Software, 54, 51-61.
[22] Hwang, B. G., & Low, L. K. (2012). Construction project change management in Singapore: Status, importance and impact. International Journal of Project Management, 30(7), 817-826.
[23] Ibbs, C. W. (1997). Quantitative impacts of project change: size issues.Journal of Construction Engineering and Management, 123(3), 308-311.
[24] Ibbs, C. W., Wong, C. K., & Kwak, Y. H. (2001). Project change management system. Journal of Management in Engineering, 17(3), 159-165.
[25] IEEE. (2012). IEEE Standard for Configuration Management in Systems and Software Engineering : IEEE 828-2012. In IEEE Standards Association.
[26] ISBSG The global and independent source of data and analysis for the IT industry (2014). http://www.isbsg.org
[27] Ishii, N., Takano, Y., & Muraki, M. (2014). An order acceptance strategy under limited engineering man-hours for cost estimation in Engineering–Procurement–Construction projects. International Journal of Project Management, 32(3), 519-528.
[28] Jain, A. K. (2010). Data clustering: 50 years beyond K-means. Pattern Recognition Letters, 31(8), 651-666.
[29] Kim, J., Kang, C., & Hwang, I. (2012). A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem. International Journal of Project Management, 30(2), 264-272.
[30] Kim, J. H. (2009). Estimating classification error rate: Repeated cross-validation, repeated hold-out and bootstrap. Computational Statistics & Data Analysis, 53(11), 3735-3745.
[31] Kumaraswamy, M., Miller, D., Yogeswaran, K., (1998). Claims for extension of time in civil engineering projects. Construction Management and Economics, 16(3), 283-294.
[32] Lechler, T. G., Ronen, B., & Stohr, E. A. (2005). Critical chain: a new project management paradigm or old wine in new bottles?. Engineering Management Journal, 17(4), 45-58.
[33] Lee, S.H., Peña-Mora, F., Park, M., (2005). Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects. Journal of Construction Engineering and Management, 131(8), 890-902.
[34] Li, B., Sun, X., & Keung, J. (2013). FCA-CIA: An Approach of Using FCA to Support Cross-level Change Impact Analysis for Object Oriented Java Programs. Information and Software Technology, 55(8), 1437-1449.
[35] Li, Q., Salman, R., Test, E., Strack, R., & Kecman, V. (2013). Parallel multitask cross validation for Support Vector Machine using GPU. Journal of Parallel and Distributed Computing, 73(3), 293-302.
[36] Mendes, E., & Lokan, C. (2008). Replicating studies on cross-vs single-company effort models using the ISBSG Database. Empirical Software Engineering, 13(1), 3-37.
[37] Mirza, M. N., Pourzolfaghar, Z., Shahnazari, M. (2013). Significance of Scope in Project Success. Procedia Technology, 9, 722-729.
[38] Molinaro, A. M., Simon, R., & Pfeiffer, R. M. (2005). Prediction error estimation: a comparison of resampling methods. Bioinformatics, 21(15), 3301-3307.
[39] Papke-Shields, K. E., Beise, C., & Quan, J. (2010). Do project managers practice what they preach, and does it matter to project success?. International Journal of Project Management, 28(7), 650-662.
[40] Park, P. S., & Kshirsagar, A. M. (1996). Correlation between successive values of Anderson′s classification statistic in the hold-out method. Statistics & probability letters, 27(3), 259-265.
[41] Park, S., & Bae, D. H. (2011). An approach to analyzing the software process change impact using process slicing and simulation. Journal of Systems and Software, 84(4), 528-543.
[42] Partington, D. (1996). The project management of organizational change.International Journal of Project Management, 14(1), 13-21.
[43] Pendharkar, P. C., & Rodger, J. A. (2009). The relationship between software development team size and software development cost. Communications of the ACM, 52(1), 141-144.
[44] Perminova, O., Gustafsson, M., & Wikström, K. (2008). Defining uncertainty in projects–a new perspective. International Journal of Project Management, 26(1), 73-79.
[45] Pikkarainen, M., Haikara, J., Salo, O., Abrahamsson, P., & Still, J. (2008). The impact of agile practices on communication in software development. Empirical Software Engineering, 13(3), 303-337.
[46] Prapamontol, T., Sutan, K., Laoyang, S., Hongsibsong, S., Lee, G., Yano, Y., Hunter, R. E., Ryan, P. B., Barr, D. B., Panuwet, P. (2014). Cross validation of gas chromatography-flame photometric detection and gas chromatography–mass spectrometry methods for measuring dialkylphosphate metabolites of organophosphate pesticides in human urine. International Journal of Hygiene and Environmental Health, 217(4), 554-566.
[47] Project Management Institute. (2004). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) Third Edition. In Project Management Institute.
[48] Project Management Institute. (2008). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) Fourth Edition. In Project Management Institute.
[49] Rand, G. K. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management, 18(3), 173-177.
[50] Rovegard, P., Angelis, L., & Wohlin, C. (2008). An empirical study on views of importance of change impact analysis issues. Software Engineering, IEEE Transactions on, 34(4), 516-530.
[51] Shao, C., Paynabar, K., Kim, T. H., Jin, J. J., Hu, S. J., Spicer, J. P., Wang, H., & Abell, J. A. (2013). Feature selection for manufacturing process monitoring using cross-validation. Journal of Manufacturing Systems, 32(4), 550-555.
[52] Stasis, A., Whyte, J., & Dentten, R. (2013). A Critical Examination of Change Control Processes. Procedia CIRP, 11, 177-182.
[53] Steyn, H. (2002). Project management applications of the theory of constraints beyond critical chain scheduling. International Journal of Project Management,20(1), 75-80.
[54] Turner, J. R., & Müller, R. (2003). On the nature of the project as a temporary organization. International Journal of Project Management, 21(1), 1-8.
[55] Turver, R. J., & Munro, M. (1994). An early impact analysis technique for software maintenance. Journal of Software Maintenance: Research and Practice, 6(1), 35-52.
[56] Tzortzis, G., & Likas, A. (2014). The MinMax k-Means clustering algorithm. Pattern Recognition, 47(7), 2505-2516.
[57] Voropajev, V. (1998). Change management—A key integrative function of PM in transition economies. International Journal of Project Management, 16(1), 15-19.
[58] Voss, M. (2012). Impact of customer integration on project portfolio management and its success—Developing a conceptual framework.International Journal of Project Management, 30(5), 567-581.
[59] Warburton, R. D. (2011). A time-dependent earned value model for software projects. International Journal of Project Management, 29(8), 1082-1090.
[60] Yang, F., & Xiao, B. J. (2012). A web based MDSplus data analysis and visualization system for EAST. Fusion Engineering and Design, 87(12), 2161-2165.
[61] Zhang, L. (2013). Managing project changes: Case studies on stage iteration and functional interaction. International Journal of Project Management, 31(7), 958-970.
[62] Zhao, Z. Y., Lv, Q. L., Zuo, J., & Zillante, G. (2009). A Prediction System for Change Management in Construction Project. Journal of Construction Engineering and Management, 136(6), 659-669.
[63] Zucchini, W. (2000). An introduction to model selection. Journal of Mathematical Psychology, 44(1), 41-61. |