參考文獻 |
1.Agin, N., and D. Cullen (1975). “An algorithm for transportation routing and vehicle loading.” Logistics:1-20, North Holland, Amsterdam.
2.Agin, N. I., and D. E. Cullen (2017). “An Algorithm for Transportation Routing and Vehicle Loading.” Logistics, North Holland, Amsterdam.
3.Alves, T., and A. R. Andrade (2021). “Scheduling Maintenance Technicians in a Railway Depot.” Joint Rail Conference. April 20–21, 2021. Baltimore, Maryland. Virtual, Online.
4.Bakhtiary, A., J. A. Zakeri, and S. Mohammadzadeh (2021) “An opportunistic preventive maintenance policy for tamping scheduling of railway tracks.” International Journal of Rail Transportation 9(1): 1-22.
5.Baldi, M. M., F. Heinicke, A. Simroth, and R. Tadei (2016). "New heuristics for the stochastic tactical railway maintenance problem." Omega 63: 94-102.
6.Barnhart, C., E. L. Johnson, G. L. Nemhauser, M. W. P. Savelsbergh, and P. H. Vance (1998). "Branch-and-price: Column Generation for Solving Huge Integer Programs." Operations Research 46: 316-829.
7.Basciftci, B., S. Ahmed, and N. Gebraeel (2020). "Data-driven maintenance and operations scheduling in power systems under decision-dependent uncertainty." IISE Transactions 52(6):589-602.
8.Benders, J. F. (1962), "Partitioning procedures for solving mixed-variables programming problems", Numerische Mathematik 4(3): 238–252.
9.Budai, G., D. Huisman, and R. Dekker (2006). "Scheduling Preventive Railway Maintenance Activities." Journal of the Operational Research Society 57(9): 1035-1044.
10.Camci, F. (2015). "Maintenance Scheduling of Geographically Distributed Assets with Prognostics Information." European Journal of Operational Research 245(2): 506-516.
11.Camerini, P.K., L. Fratta, and F. Maffioli (1975). “On improving relaxation methods by modified gradient techniques.” Mathematical Programming Study 3:6-25.
12.Chang, C. C. (2014). "Optimum Preventive Maintenance Policies for Systems Subject to Random Working Times, Replacement, and Minimal Repair." Computers & Industrial Engineering 67: 185-194.
13.Chang, H. L. (2006). “Applying Reliability-Centered Maintenance (RCM) Approach to Repair Level Design for Railway Rolling Stocks - An Example of EMU Power Subsystem of TRA.” National Chiao Tung University Institutional Repository,National Science and Technology Council:PB9508-2220 68。
14.Chen, C. W. (2013). “Electric Multiple Unit Maintenance Scheduling - An example of Taipei MRT.” Master thesis. Huafan University.
15.Chen, C.Y., S. Yan, and Y.S. Wu (2019), “A Model with a Solution Method for the Taxi Pooling Problem with Stochastic Vehicle Travel Times,” International Journal of Sustainable Transportation 13(8): 582-596.
16.Cheng, G.Q., B.H. Zhou, and L. Li (2017). “Joint Optimization of Lot Sizing and Condition-based Maintenance for Multi-component Production Systems.” Computers & Industrial Engr. 110: 538-549.
17.Chu, J.C., S. Yan, and H.J. Huang (2017). “A multi-trip split delivery vehicle routing problem with time windows for inventory replenishment under stochastic travel times.” Network & Spatial Economics 17: 41-68.
18.Clarke, M. (1998). “Irregular Airline Operations: a Review of the State-of-the-practice in Airline Operations Control Center.” Journal of Air Transport Management 4: 67-76.
19.D′Ariano, A., D. Pacciarelli, M. Pistelli, and M. Pranzo (2015). “Real‐time Scheduling of Aircraft Arrivals and Departures in a Terminal Maneuvering Area.” Networks 65(3): 212-227.
20.Desaulniers, G., J. Desrosiers, Y. Dumas, M. M. Solomon, and F. Soumis (1997). “Daily Aircraft Routing and Scheduling.” Management Science 43: 841-855.
21.Fecarotti, C., J. Andrews, and R. Pesenti (2021). “A mathematical programming model to select maintenance strategies in railway networks.” Reliability Engineering & System Safety, Vol. 216, Article ID: 107940.
22.Fisher, M. L. (1981). “The Lagrangian relaxation method for solving integer programming problem.” Management Science 27: 1-18.
23.Garey M. R., and D. S. Johnson (1979). “Computers and intractability: a guide to the theory of NP-completeness.” WH Freeman & Company, San Francisco, CA.
24.Jafari L., and V. Makis (2016). “Joint Optimization of Lot-sizing and Maintenance Policy for a Partially Observable Two-unit System.” Intl Journal of Advanced Manufacturing Technology 87(5-8): 1621-1639.
25.Jarrah, A. I. Z., G. Yu, N. Krishnamurthy, and A. Rakshit (1993). “A Decision Support Framework for Airline Flight Cancellations and Delays.” Transportation Science 27(3): 266-280.
26.Jin, H., S. Chen, X. Ran, G. Liu, and S. Liu (2022). “Column generation-based optimum crew scheduling incorporating network representation for urban rail transit systems,” Transportation Research Part C: Emerging Technologies 169, 108155.
27.Jozefowiez, N., C. Mancel, and F. Mora-Camino (2013). “A Heuristic Approach Based on Shortest Path Problems for Integrated Flight, Aircraft, and Passenger Rescheduling under Disruptions.” Journal of the Operational Research Society 64(3): 384-395.
28.Li, J., Yin, G., X. Wang, and W. Yan (2022), “Automated decision making in highway pavement preventive maintenance based on deep learning,” Automation in Construction 135:104-111.
29.Liao, Z., H. Li, J. Miaoi, and F. Corman (2021), “Railway capacity estimation considering vehicle circulation: Integrated timetable and vehicles scheduling on hybrid time-space networks,” Transportation Research Part C: Emerging Technologies 124, Article ID: 102961.
30.Lidén, T. (2015). “Railway Infrastructure Maintenance - a Survey of Planning Problems and Conducted Research.” Transportation Research Procedia 10: 574-583.
31.Lidén, T., T. Kalinowski, and H. Waterer (2018). “Resource considerations for integrated planning of railway traffic and maintenance windows.” Journal of Rail Transport Planning & Management 8(1):1-15.
32.Lin, B., and Y. Zhao (2021), “Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling,” Reliability Engineering & System Safety 215:107893.
33.Liu, G., S. Chen, X. Ran, H. Jin, and Q. Chen (2020). “Optimum Infrastructure Maintenance Scheduling Model for Urban Rail Transit Considering Possession Conflict Resolution.” 20th COTA International Conference of Transportation Professionals August 14–16, 2020. Xi’an, China (Conference Cancelled).
34.Lu, C. C., S. Yan, and Y. W. Huang (2018). “Optimal Scheduling of a Taxi Fleet with Mixed Electric and Gasoline Vehicles to Service Advance Reservations.” Transportation Research Part C 93: 479-500.
35.Luan, X., J. Miao, L. Meng, F. Corman, and G. Lodewijks (2017). “Integrated Optimization on Train Scheduling and Preventive Maintenance Time Slots Planning.” Transportation Research Part C: Emerging Technologies 80: 329-359.
36.Mansi, R., S. Hanafi, C. Wilbaut, and F. Clautiaux (2012). “Disruptions in the Airline Industry: Math-heuristics for Re-assigning Aircraft and Passengers Simultaneously.” European Journal of Industrial Engineering 10(6): 690-712.
37.Mjirda, A. R. B., H. Allaoui, and G. Goncalves (2016). “On the Joint Optimization of the Periodic Preventive Maintenance and the Spare Parts Inventory Problem.” IFAC-PapersOnLine 49(12): 881-885.
38.Naoum-Sawaya, J., and S. Elhedhli (2013). “A Stochastic Optimization Model for Real-time Ambulance Redeployment.” Computers & Operations Research 40 (8), 1972-1978.
39.Pan, H., L. Yang, and Z. Liang (2022). “Demand-oriented integration optimization of train timetabling and rolling stock circulation planning with flexible train compositions: A column-generation-based approach.” European Journal of Operational Research. In Press.
40.Pargar, F. (2015). “A Mathematical Model for Scheduling Preventive Maintenance and Renewal Projects of Infrastructure.” AusRAIL PLUS, Doing it Smarter. People, Power, Performance. 24-26 November 2015, Melbourne, Victoria, Australia.
41.Pargar, F., O. Kauppila, and J. Kujala (2017). “Integrated Scheduling of Preventive Maintenance and Renewal Projects for Multi-unit Systems with Grouping and Balancing.” Computers & Industrial Engineering 110: 43-58.
42.Paul, J. A., and M. Zhang (2019). “Supply location and transportation planning for hurricanes: A two-stage stochastic programming framework.” European Journal of Operational Research 274(1): 108-125.
43.Peng, F., and Y. Ouyang (2012). “Track Maintenance Production Team Scheduling in Railroad Networks.” Transportation Research Part B 46: 1474-1488.
44.Peng, F., and Y. Ouyang (2013). “Optimal Clustering of Railroad Track Maintenance Jobs.” Computer-Aided Civil and Infrastructure Engineering 29: 235-247.
45.Peng, F., S. Kang, X. Li, Y. Ouyang, K. Somani, and D. Acharya (2011). “A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem.” Computer-Aided Civil and Infrastructure Engineering 26: 129-145.
46.Pita, J. P., C. Barnhart, and A. P. Antunes (2013). “Integrated Flight Scheduling and Fleet Assignment under Airport Congestion.” Transportation Science 47(4): 477-492.
47.Pour, S. M., J. H. Drake, L. S. Ejlertsen, K. M. Rasmussen, and E. K. Burke (2018). “A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem.” European Journal of Operational Research 269(1): 341-352.
48.Rudek, I., and R. Rudek (2021). “Heuristic workload scheduling algorithms for rolling stocks with mixed preventive maintenance policies.” International Conference on Methods and Models in Automation and Robotics (MMAR): 297-302.
49.Saltzman, R. M., and H. I. Stern (2022). “The multi-day aircraft maintenance routing problem.” Journal of Air Transport Management 102:102224.
50.Shang, P., Y. Yao, L. Yang, L. Meng, and P. Mo (2021). “Integrated Model for Timetabling and Circulation Planning on an Urban Rail Transit Line: a Coupled Network-Based Flow Formulation.” Networks and Spatial Economics 21(2): 331-364.
51.Tang, C. H., S. Yan, and Y. H. Chen (2008). “An Integrated Model and Solution Algorithms for Passenger, Cargo, and Combi Flight Scheduling.” Transportation Research Part E 44(6): 1004-1024.
52.Thengvall, B. G., G. Yu, and J. F. Bard (2001). “Multiple Fleet Aircraft Schedule Recovery Following Hub Closures.” Transportation Research Part A: Policy and Practice 35(4): 289-308.
53.Urbani, M., M. Brunelli, and A. Punkka (2022). “An approach for bi-objective maintenance scheduling on a networked system with limited resources.” European Journal of Operational Research. In Press.
54.Wang Y., Z. Shang, D. Huisman, A. D′Ariano, and J.C. Zhang (2018). “A Lagrangian Relaxation Approach Based on a Time-Space-State Network for Railway Crew Scheduling (No. EI2018-45).” Econometric Institute Research Papers. September 2018. Retrieved from http://hdl.handle.net/1765/114114.
55.Wang, Z. (2021). “Optimization Model for EMU Collaborative Scheduling Problem among Multiple China Railway High-speed Depots.” International Conference on Electronic Information Engineering and Computer Science (EIECS):298-305.
56.Wang, Z., T. Shi, W. Zhang, and H. Wang (2021). “Optimized Model and Algorithm for Scheduling Turnaround Routes of Electric Multiple Units.” 2021 IEEE 23rd Int Conf on High Performance Computing & Communications; 7th Int Conf on Data Science & Systems; 19th Int Conf on Smart City; 7th Int Conf on Dependability in Sensor, Cloud & Big Data Systems & Application (HPCC/DSS/SmartCity/DependSys): 1325-1330.
57.Warburg, V., T. G. Hansen, A. Larsen, H. Norman, and E. Andersson (2008). “Dynamic Airline Scheduling: an Analysis of the Potentials of Refleeting and Retiming.” Journal of Air Transport Management 14(4): 163-167.
58.Yan, S., and C. H. Tang (2008). “An Integrated Framework for Intercity Bus Scheduling Under Stochastic Bus Travel Times.” Transportation Science 42(3):318-335.
59.Yan, S., and C. H. Tseng (2002). “A passenger demand model for airline flight scheduling and fleet routing.” Computers and Operations Research 29:1559–1581.
60.Yan, S., and C. Lin (1997). “Airline Scheduling for the Temporary Closure of Airports.” Transportation Science 31(1): 72-82.
61.Yan, S., and C. Y. Chen (2011). “An Optimization Model and a Solution Algorithm for the Many-to-Many Car Pooling Problem.” Annals of Operations Research 191:37-71.
62.Yan, S., and Y. L. Shih (2009). “Optimal Scheduling of Emergency Roadway Repair and Subsequent Relief Distribution.” Computers and Operations Research 36(6): 2049 - 2065.
63.Yan, S., C. H. Tang, and J. H. Chen (2014a). “Common-use Check-in Counter Reassignments with a Variable Number of Service Lines and Variable Length of Time Window.” Journal of the Chinese Institute of Engineers 37: 643-658.
64.Yan, S., C. Y. Chen, and C. C. Wu (2012a). “Solution Methods for the Taxi Pooling Problem.” Transportation 39(3):723-748.
65.Yan, S., C. Y. Chen, and C. H. Tang (2009a). “Gate Reassignment Following Temporary Airport Closures.” Transportmetrica 5(1):25-41.
66.Yan, S., C. Y. Chen, and S. C. Lin (2009b). “Ship Scheduling and Container Transshipment Planning for Liners in Short Term Operations.” Journal of Marine Science and Technology, Japan 14:417-445.
67.Yan, S., F.Y. Hsiao, and Y.C. Chen (2015). “Inter-school bus scheduling under stochastic travel times.” Networks and Spatial Economics 15:1049-1074.
68.Yan, S., and H. F. Young (1996). “Decision support framework for multi-fleet routing and multi-stop flight scheduling.” Transportation Research, Part A 30(5) 379-398.
69.Yan, S., and H. L. Chen (2002). “A scheduling model and a solution algorithm for inter-city bus carriers.” Transportation Research, Part A 36, 805-825.
70.Yan, S., H. C. Lin, and Y. C. Liu (2011). “Optimal Schedule Adjustments for Supplying Ready Mixed Concrete Following Incidents.” Automation in Construction 20:1041-1050.
71.Yan, S., J. C. Chu, and Y. L. Shih (2014). “Optimal Scheduling for Highway Emergency Repairs under Large-Scale Supply-Demand Perturbations.” IEEE Transactions on Intelligent Transportation Systems 15(6):2378-2393.
72.Yan, S., J. R. Lin, Y. C. Chen, and F.R. Xie (2017). “Rental Bike Location and Allocation under Stochastic Demands.” Computers & Industrial Engineering 107: 1-11.
73.Yan, S., S. S. Wang, and M. W. Wu (2012b). “A Model with a Solution Algorithm for the Cash Transportation Vehicle Routing and Scheduling Problem.” Computers & Industrial Engineering 63(2):464-473.
74.Yan, S., W. Lai, and M. Chen (2008). “Production Scheduling and Truck Dispatching of Ready Mixed Concrete.” Transportation Research, Part E 44(1): 164-179.
75.Yan, S., W. C. Wang, G. W. Chang, and H. C. Lin (2016). “Effective Ready Mixed Concrete Supply Adjustments with Inoperative Mixers under Stochastic Travel Times.” Transportation Letters 8: 286-300.
76.Yan, S., Y. J. Tung, and C. H. Tang (2007). “An Intercity Bus Scheduling Model Incorporating Variable Market Share.” IEEE Transactions on systems, man, and cybernetics- Part A 37(6): 921-932.
77.Yan, S., C. H. Chen, and T. S. Yeh. (2008). “The Mixed Deterministic and Stochastic Demand Models for Mass Rapid Transit Carriage Maintenance Shift Setting and Manpower Supply Planning in Long-Term Operations”, Transportation Planning Journal 37(1): 79-108。
78.Yan, T. H. (2018) ,Optimization of Short-Term Track Utilization and Maintenance Scheduling,Master thesis, National Taiwan University。
79.Yang, T. H., S. Yan, and H. H. Chen (2003). “An Airline Maintenance Manpower Planning Model with Flexible Strategies.” Journal of Air Transport Management 9(4): 233-239.
80.Zhang S., M. Du, J. Tong, and Y. F. Li (2019). “Multi-objective optimization of maintenance program in multi-unit nuclear power plant stations.” Reliability Engineering & System Safety 188:532-548.
81.Zhang Y., D. Andrea, B. He, and Q. Peng (2019). “Microscopic optimization model and algorithm for integrating train timetabling and track maintenance task scheduling.” Transportation Research Part B 127: 237-278.
82.Zhang, C., Y. Gao, L. Yang, Z. Gao, and J. Qi (2020). “Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation.” Transportation Research Part B: Methodological 134: 64-92.
83.Zhang, T., J. Andrews, and R. Wang (2013). “Optimal Scheduling of Track Maintenance on a Railway Network.” Quality and Reliability Engineering International 29(2): 285-297.
84.Zhou, J., X. Xu, J. Long, and J. Ding (2021). “Integrated optimization approach to metro crew scheduling and rostering.” Transportation Research Part C: Emerging Technologies 123:102975.
85.Zhou, W., S. Li, J. Kang, and Y. Huang (2022). “Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock.” Mathematics 10(10): 1639.
86.Zhu, W., M. Fouladirad, and C. Bérenguer (2015). “Condition-based Maintenance Policies for a Combined Wear and Shock Deterioration Model with Covariates.” Computers & Industrial Engineering 85: 268-283. |