參考文獻 |
Akhbari, M., (2022). “Integration of multi-mode resource-constrained project scheduling under bonus-penalty policies with material ordering under quantity discount scheme for minimizing project cost.” Scientia Iranica E 29(1), 427-446.
Brucker, P., Jurisch, B., & Sievers, B., (1994). A branch and bound algorithm for the job-shop scheduling problem. Discret. Appl. Math. 49, 107–127.
Brucker, P., & Schlie, R. (1990). Job-shop scheduling with multi-purpose machines. Computing, 45, 369-375.
Bagheri, A., & Zandieh, M., (2011). “Bi-criteria flexible job-shop scheduling with sequence-dependent setup times - Variable neighborhood search approach.” Journal of Manufacturing Systems 30, 8-15.
Bierwirth C., & Kuhpfah J., (2017). “Extended GRASP for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective.” European Journal of Operational Research 261, 1-23.
Baykasoglu, A., & Özbakır, L., (2010). “Analyzing the effect of dispatching rules on the scheduling performance through grammar-based flexible scheduling system.” International Journal of Production Economics 124, 369–381.
Blazewicz, J., & Finke, G., (1994). “Scheduling with resource management in manufacturing systems”. European Journal of Operational Research, 1-14.
Balas, E., (1969). Machine sequencing via disjunctive graphs: an implicit enumeration algorithm. Operations research, 17(6), 941-957.
Braune, R. & Zäpfel, G., (2016). “Shifting bottleneck scheduling for total weighted tardiness minimization—A computational evaluation of subproblem and reoptimization heuristics”. Computers & Operations Research, 66, 130-140
Carlier, J., & Pinson, E., (1994). “Adjustment of heads and tails for the job-shop problem”. European Journal of Operational Research, 78(2), 146-161.
Carlier, J., & Pinson, É., (1989). “An algorithm for solving the job-shop problem”. Management science, 35(2), 164-176.
Coello, C. A., & Cortés, N. C., (2005). “A study on the Inverted Generational Distance (IGD) indicator.” IEEE Transactions on Evolutionary Computation, 9(1), 58-67.
Dauzère-Pérès S., & Paulli J., (1997). “An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search.” Annals of Operations Research 70, 281-306.
Deb K., Pratap A., Agarwal S., & Meyarivan T., (2002). “A fast and elitist multiobjective genetic algorithm: NSGA-II.”, IEEE Transactions on Evolutionary Computation 6 (2), 182–197.
Dang, Q.-V., van Diessen, T., Martagan, T., & Adan, I., (2021). “A matheuristic for parallel machine scheduling with tool replacements”. European Journal of Operational Research, 291.
De Giovanni, L., & Pezzella, F., (2010). “An improved genetic algorithm for the distributed and flexible job-shop scheduling problem”. European Journal of Operational Research, 200(2), 395-408.
Garcia-Leon A. A., Dauzere-Peres S. & Mati Y., (2019). “An efficient Pareto approach for solving the multi-objective flexible job-shop scheduling problem with regular criteria”. Computers and operations research 108, 187-200.
Gao, J., Sun, L., & Gen, M., (2008). “A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems.” Computers & Operations Research, 35(9), 2892–2907.
Ghiani, C. A., Ying, Z., de Vellis, J., & Gomez-Pinilla, F., (2007). “Exercise decreases myelin-associated glycoprotein expression in the spinal cord and positively modulates neuronal growth”. Glia, 966–975.
Geiger C. D., Kempf K. G., & Uzsoy R., (1997). “A tabu search approach to scheduling an automated wet etch station.” Journal of Manufacturing Systems ,16(2), 102-116.
González M. A., Vela C. R., & Varela R., (2015). “Scatter search with path relinking for the flexible job shop scheduling problem”. European Journal of Operational Research 245(1), 35-45.
Goh, C. K., & Tan, K. C., (2009). “Non-dominance ratio for preference articulation in evolutionary multiobjective optimization”. IEEE Transactions on Evolutionary Computation, 13(2), 347-365.
Ho, N. B., Tay, J. C., & Lai, E. M.-K., (2007). “An effective architecture for learning and evolving flexible job-shop schedules”. European Journal of Operational Research, 179(2), 316-333.
Ho, N. B., & Tay, J. C., (2005). Evolving dispatching rules for solving the flexible job-shop problem. In 2005 IEEE Congress on Evolutionary Computation (pp. 2848-2855).Nowicki E., Smutnicki C., (1996). “A fast taboo search algorithm for the job shop problem.”, Management Science 42, 797–813.
Jensen, M.T., (2003). “Generating robust and flexible job shop schedules using genetic algorithms”, IEEE Transactions on Evolutionary Computation 7, 275–288.
Jia, S., Hu, & Z.-H., (2014). “Path-relinking tabu search for the multi-objective flexible job shop scheduling problem”. Computers & Operations Research 47, 11–26.
Kuhpfah, J., & Bierwirth, C. (2016). “A study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objective”. Computers & Operations Research,Vol. 66,44-57
Kim, Y.K., Park, K., & Ko, J. (2003). “A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling”. Computers & Operations Research 30, 1151–1171.
Knopp, S., Dauzère-Pérès, S., & Yugma, C., (2017). “A batch-oblivious approach for complex job-shop scheduling problems”. European Journal of Operational Research, 263(1), 50-61..
Kuo, Y.H., (2023). “An extended batch-oblivious approach for flexible Job shop with batching and material consumption when minimizing the total weighted material consumed and makespan”. Unpublished master’s thesis, National Central University, Taoyuan City.
Moradi, E., Fatemi Ghomi, S. M. T., & Zandieh, M., (2011). “Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem”. Expert Systems with Applications, 38, 7169-7178.
Mecler, J., Subramaninan, A., & Vidal, T., (2021). “A simple and effective hybrid genetic search for the job sequencing and tool switching problem”. Computers and Operations Research.
Mousakhani M., (2013). “Sequence-dependent setup time flexible job shop scheduling problem to minimize total tardiness.” International Journal of Production Research 51.12, 3476-3487.
Mati Y., Dauzère-Pérès S., & Lahlou C., (2011). “A general approach for optimizing regular criteria in the job-shop scheduling problem.” European Journal of Operational Research 212(1), 33-42.
Pezzella, F., Morganti, G., & Ciaschetti, G., (2008). “A genetic algorithm for the flexible job-shop scheduling problem.” Computers & Operations Research 35, 3202–3212.
Privault, C., & Finke, G., (1995). “Modelling a tool switching problem on a single NC-machine”. Journal of Intelligent Manufacturing, 87–94.
Pinedo, M., & Singer, M., (1999). “A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop”. Naval Research Logistics, 46, 1-17
Pinedo, M. L., (2008). “Scheduling: Theory, Algorithms, and Systems (4th ed.)”. Springer.
Rabiee, M., Zandieh, M., & Ramezani, P., (2012). “Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches”. International Journal of Production Research, 50, 7327–7342.
Rahmati, S.H.A., & Zandieh, M., (2011). “A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem.” International Journal of Advanced Manufacturing Technology 58, 1115–1129.
Rahmati, S.H.A., Zandieh, M., & Yazdani, M., (2013). “Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem.” International Journal of Advanced Manufacturing Technology 64, 915–932.
Riquelme, J. C., Coello Coello, C. A., Montes Sánchez, G., & Mostaghim, S. (2015). “Interactive evolutionary multi-objective optimization based on Kriging models.” Information Sciences 298, 139-155.
Roy, B. & Sussman, B. (1964). Les problèmes d’ordonnancement avec contraintes disjonctives, Note DS No. 9 bis, SEMA, Montroug.
Sheen, G.-J. (2022). “Saving value-based Genetic Algorithm for Bi-objective Parallel Batch Machine Scheduling Problem”, NSTC project (110-2410-H-008-011-) final report.
Shen L., & Buscher U., (2012). “Solving the serial batching problem in job shop manufacturing systems”. European journal of operational research 221, 14-26.
Shen L., Dauzère-Pérès S., & Neufeld J. S., (2017). “Solving the Flexible Job Shop Scheduling Problem with Sequence-Dependent Setup Times.” European journal of operational research 265, 503-516.
Snyman, S., & Bekker, J., (2019). “Comparing the performance of different metaheuristics when solving a stochastic bi-objective job shop scheduling problem.” In Proceedings of the 2019 ORSSA Annual Conference.
Tamssaouet, K., Dauzère-Pérès, S., Knopp, S., Bitar, A., & Yugma, C., (2022). “Multiobjective optimization for complex flexible job-shop scheduling problems”. European Journal of Operational Research, 296(1), 87-100.
Van Laarhoven, P. J. M., (1988). Theoretical and computational aspects of simulated annealing (PhD thesis). Erasmus University Rotterdam.
Vilcot G., & Billaut J. C., (2008). “A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem”. European journal of operational research 190, 389-411.
Wang, S., &Yu, J., (2010). “An effective heuristic for flexible job-shop scheduling problem with maintenance activities.” Computers & Industrial Engineering, 436-447.
Wu, M. C., Lin, C. S., Lin, C. H., & Chen, C. F., (2017). “Effects of different chromosome representations in developing genetic algorithms to solve DFJS scheduling problems”, Computers & Operations Research, 101-112.
Yuan, Y., & Xu, H. (2015)., “Multiobjective flexible job shop scheduling using memetic algorithms.” IEEE Transactions on Automation Science and Engineering, 12(1), 336-353.
Yazdani, M., Amiri, M., & Zandieh, M., (2010). “Flexible job-shop scheduling with parallel variable neighborhood search algorithm.” Expert Systems with Applications 37, 678–687.
Zoraghi, N., Najafi, A., & Niaki, S., (2015). “Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches”. International Journal of Engineering - Transaction C: Aspects, 28, 896-902.
Zhang, H., & Gen, M., (2005). “Multistage-based genetic algorithm for flexible job-shop
scheduling problem.” Journal of Complexity International 11, 223–232 |