中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/100043
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81671796      Online Users : 2664
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/100043


    Title: Incorporating lost productivity calculation into delay analysis for construction projects
    Authors: 楊智斌;Yang, Jyh-Bin;Huang, Kuei-Mei;Lee, Chang-Hung;Chiu, Chui-Te
    Contributors: 工學院土木工程學系
    Keywords: Analysis;Civil Engineering;Construction;Construction industry;Construction Management;construction projects;Contractors;Delay;delay analysis;delay claim;Engineering;Geotechnical Engineering & Applied Earth Sciences;Impact analysis;Industrial Pollution Prevention;lost productivity;Mathematical analysis;Productivity;Project engineering;schedule management;Schedules;토목공학
    Date: 2014-03-01
    Issue Date: 2026-04-21 13:46:21 (UTC+8)
    Publisher: Korean Society of Civil Engineers;Berlin/Heidelberg: Elsevier Inc
    Abstract: 摘要: Schedule delays commonly occur in construction projects and often result in delay claims. Several studies have proposed different schedule delay analysis methodologies. By using as-planned and as-built schedules, most previous studies have concentrated on calculating the impact of identified delay events on project duration but have neglected to connect impact calculation from detailed delay evidence in their analyses. Lost productivity, which is a primary cause of schedule delays, entails the completion of work at less than the planned rate of production; it is usually experienced by contractors. To solve analysis problem of schedule delays associated with lost productivity, this study proposes a delay analysis method (the LOPE method) that integrates a lost productivity calculation approach and a well-known schedule delay analysis method, the collapsed as-built method. As demonstrated through a simplified case study, the proposed method is beneficial for calculating the impacts of schedule delays caused by lost productivity.
    其他題名: KSCE J Civ Eng
    出版者: Berlin/Heidelberg: Elsevier Inc
    出版日期: 2014-03
    出處: KSCE Journal of Civil Engineering, 2014, 18(2), , pp.380-388
    資源來源: Alma/SFX Local Collection
    版權: 2014 © Korean Society of Civil Engineers and Springer-Verlag Berlin Heidelberg 2014 published by Elsevier inc.
    版權: Korean Society of Civil Engineers and Springer-Verlag Berlin Heidelberg 2014
    版權: Korean Society of Civil Engineers and Springer-Verlag Berlin Heidelberg 2014.
    識別號: ISSN: 1226-7988
    識別號: EISSN: 1976-3808
    識別號: DOI: 10.1007/s12205-014-0128-8
    Appears in Collections:[Department of Civil Engineering] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML10View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明