中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/100533
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81560518      Online Users : 3608
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/100533


    Title: Process reengineering and improvement for building precast production
    Authors: 陳介豪;Chen, Jieh-Haur;Yang, Li-Ren;Tai, Hsing-Wei
    Contributors: 工學院土木工程學系
    Keywords: Construction engineering;Precast process;Productivity;Reengineering;Simulation
    Date: 2016-08-01
    Issue Date: 2026-04-21 14:05:35 (UTC+8)
    Publisher: Elsevier;Elsevier B.V
    Abstract: 摘要: Current production methods for the building of precast concrete elements are gradually becoming insufficient to meet industry demands. Most precast factories incorporate fixed molding production lines to produce building structural elements such as beams, trabeculae and pillars. Improvement of current production has reached its limits. The objective of this study is to perform process reengineering so as to create more efficient precast processes. The results of the literature review and advice from 16 experts suggest that the current process used to produce a precast element, which is comprised of 16 steps in a single module, should be redesigned to include 13 steps in 3 modules. Using historical data as input, the Arena software, Version 13, is adopted to simulate both the traditional and proposed methods, and then compare the results for practicability. An overall savings of production time of 24% can be reached by changing the current/traditional method to the flow-shop type production method. •Precast production was reengineered based on flow-shop method.•Traditional precast production line has been modified to 3 flow-shop modules.•The proposed model can save almost 25% of production time.
    出版者: Elsevier B.V
    出版日期: 2016-08
    出處: Automation in construction, 2016-08, Vol.68, p.249-258
    資源來源: Elsevier ScienceDirect Journals Complete
    版權: 2016 Elsevier B.V.
    識別號: ISSN: 0926-5805
    識別號: DOI: 10.1016/j.autcon.2016.05.015
    Appears in Collections:[Department of Civil Engineering] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML25View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明