中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/103237
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81606723      Online Users : 5099
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/103237


    Title: Using fuzzy multiple criteria decision-making approach for assessing the risk of railway reconstruction project in Taiwan
    Authors: 張東生;Lu, Shih-Tong;Chang, Dong-Shang;Yu, Shih-Heng
    Contributors: 管理學院企業管理學系
    Keywords: Algorithms;Construction;Decision Making;Design and construction;Fuzzy algorithms;Fuzzy logic;Fuzzy sets;Fuzzy systems;Methods;Models, Theoretical;Multiple criteria decision making;Railroads;Railway networks;Risk assessment;Risk Assessment - methods;Risk Factors;Risk management;Set theory;Studies;Taiwan;Traffic flow;Urban areas
    Date: 2014-01-01
    Issue Date: 2026-04-23 11:26:20 (UTC+8)
    Publisher: Hindawi Limited;Cairo, Egypt: Hindawi Publishing Corporation
    Abstract: 摘要: This study investigates the risk factors in railway reconstruction project through complete literature reviews on construction project risks and scrutinizing experiences and challenges of railway reconstructions in Taiwan. Based on the identified risk factors, an assessing framework based on the fuzzy multicriteria decision-making (fuzzy MCDM) approach to help construction agencies build awareness of the critical risk factors on the execution of railway reconstruction project, measure the impact and occurrence likelihood for these risk factors. Subjectivity, uncertainty and vagueness within the assessment process are dealt with using linguistic variables parameterized by trapezoid fuzzy numbers. By multiplying the degree of impact and the occurrence likelihood of risk factors, estimated severity values of each identified risk factor are determined. Based on the assessment results, the construction agencies were informed of what risks should be noticed and what they should do to avoid the risks. That is, it enables construction agencies of railway reconstruction to plan the appropriate risk responses/strategies to increase the opportunity of project success and effectiveness.
    其他題名: ScientificWorldJournal
    出版者: Cairo, Egypt: Hindawi Publishing Corporation
    出版日期: 2014-01-01
    出處: TheScientificWorld, 2014-01, Vol.2014 (2014), p.1-14
    資源來源: Agricultural & Environmental Science Collection
    版權: Copyright © 2014 Shih-Tong Lu et al.
    版權: COPYRIGHT 2014 John Wiley & Sons, Inc.
    版權: COPYRIGHT 2014 Hindawi Limited
    版權: Copyright © 2014 Shih-Tong Lu et al. Shih-Tong Lu et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
    版權: Copyright © 2014 Shih-Tong Lu et al. 2014
    識別號: ISSN: 2356-6140
    識別號: ISSN: 1537-744X
    識別號: EISSN: 1537-744X
    識別號: DOI: 10.1155/2014/239793
    識別號: PMID: 24772014
    Appears in Collections:[Department of Business Administration ] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML11View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明