中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/103393
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81671788      Online Users : 2658
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/103393


    Title: Applying FDEM, ERT and GPR at a site with soil contamination: A case study
    Authors: 陳建志;Wang, Tzu-Pin;Chen, Chien-Chih;Tong, Lun-Tao;Chang, Ping-Yu;Chen, Yi-Chieh;Dong, Tien-Hsing;Liu, Hsin-Chang;Lin, Chih-Ping;Yang, Kai-Hsing;Ho, Ching-Jen;Cheng, Shih-Nan
    Contributors: 地球科學學院地球科學學系
    Keywords: ERT;GPR;Remediation evaluation;Soil pollution
    Date: 2015-10-01
    Issue Date: 2026-04-23 11:29:35 (UTC+8)
    Publisher: Elsevier;Elsevier B.V
    Abstract: 摘要: This study employed the combination of three methods, namely the Frequency Domain Electromagnetic (FDEM), Electrical Resistivity Tomography (ERT) and Ground Penetrating Radar (GPR) to evaluate a heavy-metal contaminated site for both pre- and post-remediation investigations. The main goals were to verify the position and the integrity of the underground storage tanks (UST), and to determine the effectiveness of remediation to ensure no contaminants remained at the site. In general, the GPR survey was effective at locating shallowly buried objects. However, due to the highly conductive nature of the heavy-metal laden sludge, the GPR signals were attenuated severely. Thus, the first attempt to use GPR in the pre-remediation investigation did not achieve the desired results and other methods were deployed. The existence of the UST and the sludge within were confirmed by ERT and the UST shape was mapped by FDEM. The principal remediation scheme was soil replacement by replacing the contaminated soil with clean silt. Based on the distinctive property differences of the contaminated soil and the clean silt, the completion of the remediation was confirmed by the differences between pre-remediation and post-remediation in GPR, ERT and FDEM results. •Study of applications of GPR, ERT and FDEM on the pre- and post remediation investigations at a soil contaminated site•In pre-remediation investigation GPR signals were severely attenuated by the sludge.•ERT pre-remediation investigation suggested the completeness of the USTs with sludge inside.•FDEM pre-remediation investigation defined the contamination distribution.•Using GPR, ERT and FDEM in post-remediation investigation can indirectly verify the accomplishment of remediation work.
    出版者: Elsevier B.V
    出版日期: 2015-10
    出處: Journal of applied geophysics, 2015-10, Vol.121, p.21-30
    資源來源: Elsevier ScienceDirect Journals Complete
    版權: 2015 Elsevier B.V.
    識別號: ISSN: 0926-9851
    識別號: EISSN: 1879-1859
    識別號: DOI: 10.1016/j.jappgeo.2015.07.005
    Appears in Collections:[Department of Earth Sciences ] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML12View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明