English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 94274/94274 (100%)
造訪人次 : 82881681      線上人數 : 2219
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: https://ir.lib.ncu.edu.tw/handle/987654321/106778


    題名: Integrated projects planning in IS departments: A multi-period multi-project selection and assignment approach with a computerized implementation
    作者: 陳仲儼;Chen, Chung-Yang;Liu, Heng-An;Song, Je-Yi
    貢獻者: 管理學院資訊管理學系
    關鍵詞: Assignment problem;Departments;Information system (IS) development projects;Information systems;Mixed integer programming;Multi-project multi-period;Production planning;Project management;Projects selection and assignment;Studies
    日期: 2013-09-16
    上傳時間: 2026-04-23 13:42:00 (UTC+8)
    出版者: Elsevier;Amsterdam: Elsevier B.V
    摘要: 摘要: •The paper is an inter-disciplinary research of applying OR in projects management.•Address a sustainability issue of handling continuous IS project demands in contemporary IT departments.•Features mixed-integer-programming model to optimize the selection and assignment of projects on a multi-period, multi-project basis.•It innovatively considers the losses due to unselecting or delaying projects in each time of selection and assignment.•It implements a computerized solution that automatically enables the sustainability of continuous and cumulative selections and assignments. This paper highlights the subject of integrated projects planning (IPP) in contemporary IS departments, and presents a multi-period, multi-project selection and assignment approach (MPPA) to assist the departments in handling continuous project-based IS requests. The MPPA features a model to optimize the selection and assignment of IS projects. In the scope of multi-project, multi-period planning, the model innovatively considers the losses due to (1) the accumulated postponement of a previously unselected IS request and (2) the expected delay of ongoing projects when inserting a new project request. The MPPA also features an event-based decisional process for cumulative selection and assignment on a multi-period basis. Due to the complex and contextual nature of data in this paper, a computerized system is implemented for aiding the execution of the model and the process. The paper reports on an industrial case for a demonstration of the proposed work. Finally the paper compares the MPPA with related work to summarize the value and role it may play in the IPP context.
    出版者: Amsterdam: Elsevier B.V
    出版日期: 2013-09-16
    出處: European journal of operational research, 2013-09, Vol.229 (3), p.683-694
    版權: 2013 Elsevier B.V.
    版權: Copyright Elsevier Sequoia S.A. Sep 16, 2013
    識別號: ISSN: 0377-2217
    識別號: EISSN: 1872-6860
    識別號: DOI: 10.1016/j.ejor.2013.02.057
    識別號: CODEN: EJORDT
    顯示於類別:[資訊管理學系] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML13檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明