    题名: 專案範圍變動下應變成本之重新配置:系統動態學在專案風險管理的應用;System Dynamics in Project Risk Management: Reallocating the Contingency Cost under the Project Scope Change
    作者: 尚靜宜;Ching-I Shang
    贡献者: 工業管理研究所
    关键词: 應變成本;專案範圍;系統動態;Contingency cost;System dynamics;Project scope
    日期: 2002-07-01
    上传时间: 2009-09-22 14:11:33 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: The fast changing environment and the complexity of projects has increased risk exposure. Traditional tools and technologies used in the process of risk management are not appropriate owning to its static analysis attribute. The project manager perceives the importance of taking prospective tools to face the challenge and keep the effort to control the project. This research proposes a project risk dynamics model to lead the project manager how to reallocate the contingency cost under the project scope change with a holistic view. By combining the process of risk management and system dynamics analysis in the project management, early signs of risk emergence, which would remain unperceived until problems would aggravate, can be identified in the project. Hence, the project manager can take better advantage offered by System Dynamics modeling, while enhancing the performance of the existing risk management process. Project scope change creates a series of effects and causes cost overruns that affect the schedule and lower performance in the long run. This research presents a risk dynamics framework that displays a trade-off process between cost and schedule and thereby attempts to revise the contingency cost and keep it under control. A pipeline work package is modeled and discussed. The fast changing environment and the complexity of projects has increased risk exposure. Traditional tools and technologies used in the process of risk management are not appropriate owning to its static analysis attribute. The project manager perceives the importance of taking prospective tools to face the challenge and keep the effort to control the project. This research proposes a project risk dynamics model to lead the project manager how to reallocate the contingency cost under the project scope change with a holistic view. By combining the process of risk management and system dynamics analysis in the project management, early signs of risk emergence, which would remain unperceived until problems would aggravate, can be identified in the project. Hence, the project manager can take better advantage offered by System Dynamics modeling, while enhancing the performance of the existing risk management process. Project scope change creates a series of effects and causes cost overruns that affect the schedule and lower performance in the long run. This research presents a risk dynamics framework that displays a trade-off process between cost and schedule and thereby attempts to revise the contingency cost and keep it under control. A pipeline work package is modeled and discussed.
    显示于类别:[工業管理研究所 ] 博碩士論文

    文件中的档案:

    档案 大小格式浏览次数


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明