中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/11103
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 81570/81570 (100%)
Visitors : 47132063      Online Users : 497
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/11103


    Title: 運用時間斐氏圖模擬SCOR流程;Simulate the SCOR Process with Time Based Petri Net
    Authors: 翁志豪;Chih-Hao Weng
    Contributors: 工業管理研究所
    Keywords: 企業流程 供應練;PETRI NET;BUSINESS PROCESS;SUPPLY CHAIN
    Date: 2004-05-27
    Issue Date: 2009-09-22 14:13:59 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 摘要    我們將介紹供應練觀念,而SCOR流程是一個由美國供應練協會提出的基本供應練。一些用來描述流程的工具很少能模擬流程階段性所花費的時間,而時間斐氏圖正好符合正個特性。時間斐氏圖示用來描述系統且用一個符號來描述系統狀態.傳統的斐氏圖用來解決單一事件的流程問題,這篇論文中我們將會訂定我們自己的時間斐氏圖元件和原則,以運用來模擬我們多重事件的流程問題。同一石間我們也將針對SCOR流程中的訂貨生產流程的原料供應,製造,運送三個流程來模擬.最後我們會運用我們的時間斐氏圖運算幾個階段運算的例子。 Abstract In this paper, we introduce the concept of supply chain and supply chain management. When we want to discuss the issue of the supply chain, the SCOR Model must consider first, so we introduce what is SCOR Model. We know there are several tools to describe the process but fewer can monitor the process with spending time. The Petri Net is the tool to describe the system and we can present the states of the system by its token. But the base Petri Net always focuses on the single case rather than the multiple cases. For the issue, we create some elements and make the definitions of these elements, and then we also define our firing rules of my Petri Net and the relationships between the markings in the mathematical way. By using the elements that we created, we can simulate the process about the multiple cases and we can use the Petri Net to know the time of the process and calculate the total time that the job spent. In the research, we will make a correct proof and we will distribute the three parts (Source, Make, Deliver) of MTO (Make-TO-Order) of the SCOR Model. After understanding all the definitions of the elements of the MTO process, we will translate the MTO process into Petri net and follow the Petri net rule we created before and we will show how the marking and time change in several states.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明