中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/1539
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 41789755      在线人数 : 193
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/1539


    题名: 陸面機械清淤作業機具指派最佳化之研究;Opitimal assignment of dredging mechanines for mechanical excavation
    作者: 范元淵;Yuan-Yuan Fan
    贡献者: 土木工程學系碩士在職專班
    关键词: 清淤;機具指派;整數線性規劃;最佳化;啟發解;dredging;mechanical assignment;integer linear programming;optimization;heuristics
    日期: 2008-06-20
    上传时间: 2009-09-21 09:31:18 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 台灣地區受地勢陡峭及季節性雨量豐枯不均的影響,造成水資源蓄積不易,加上環保意識的提升而阻礙水庫興建、全球氣候變遷、水庫集水區之人為開發破壞日益嚴重及地質條件惡化等影響,造成可直接引用之水源日益減少,故如何達成水庫永續經營之目標,為當局目前之首要工作。然對於水庫清淤作業之執行,目前國軍部隊仍以個人實務經驗進行機具指派,缺乏科學的方法實施系統性之分析,常導致不佳的決策。 緣此,本研究針對台灣地區水庫相關之陸面機械清淤問題,利用數學規劃方法,在已知的假設及限制條件下,建立一整數規劃模式及一啟發解法以求解模式。為測試模式之實用性,本研究參考國軍之一疏濬工程資料,進行一範例分析,並比較本研究模式與人工經驗指派的差異,測試結果顯示本研究模式與演算法的效果甚佳,可為決策者在清淤作業上指派機具之參考。 Due to the steep terrain and unbalanced seasonal rainfall, it is hard to store the water resources. Furthermore, the interrupted buildup of reservoir caused by the enhanced environmental consciousness, the global climate changes, the increasingly damaged watershed by human development and the geology aggravation, all above influences will decrease using water. Therefore, it is our priority to achieve the sustainable use goal of reservoir. However, as to the desilting assignment, the national troops mechanical assignment still against the practical experience but not the scientific technique to analysis, so that usually cause poor decision. Thus, this research uses the mechanical excavatio as research scope in this paper, and through the Integer linear programming technique and well-know assumption and constraint to delevelop an optimization model and heuristic algorithms to solve the problem. Besides, to verify the suitability to this mode, the national troops takes Shihmen Reservoir dredging project as an example, to compare the mode and manpower assignments. The tested result shows that research’s model is better. It can be used in desilting assignment for dredging and acts as the reference in desilting machineries assignment.
    显示于类别:[土木工程學系碩士在職專班] 博碩士論文

    文件中的档案:

    档案 大小格式浏览次数


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明