中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/1547
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41685524      Online Users : 2751
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/1547


    Title: 建築基礎工程採用壁樁及其他工法成效之分析研究;Construction build to use wall-ytpe foundation and other manner results to analyze research
    Authors: 黃文隆;wen-lung Huang
    Contributors: 土木工程學系碩士在職專班
    Keywords: 深基礎開挖;連續壁;壁樁;載重試驗;高層建築;逆打工法;the continual wall;the wall pile;the carrying capacity experiment;the high-rise construction;counter work the law;and the deep foundation to excavate
    Date: 2008-10-09
    Issue Date: 2009-09-21 09:31:29 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 本研究是針對規劃設計階段基礎工法之選擇和基樁現地載重試驗後效益分析為研究對向,並以新板特區橋峰大樓基礎工程為研究範圍。 在規劃設計階段,工法的選擇直接與工程成本具有密切關係,除了材料本身具有市場價格外,技術、機具、人員、時程等變動形成直接或間接的影響,對於各式基樁工程所使用之機器設備在市場佔有率、施工可行性、技術人員、工期及工法考量等運用於壁樁、反循環樁、全套管基樁工法並做比較及各式基樁運用於深開挖工法之聯合使用上做比較,而選擇較經濟性和方便性之工法。 在載重試驗上針對新板特區橋峰大樓之壁樁工程運用於超高層建築之載重前、後效益分析,透過本研究,對壁樁之施工及載重有更深層的認識,在不必要成本支出的管理技術上和品質及安全確保下讓成本、技術、工期達到最高效益為本研究之目的。 onsideration and so on utilizes in the wall pile, the counter-circulation pile, the entire drive pipe machine pile labor law and makes the comparison and various types foundation pile utilizes in excavates union of use in the labor law to do deeply compares, but chooses compares efficient and the conveniences labor of law. Utilizes in the loading test wall of pile project in view of the new board special zone bridge peak building in the extra-high building in the heavy before and after benefit analysis, by this research, has in-depth understanding to construction and the carrying capacity the wall pile, in the nonessential cost disbursement's managerial technique and the quality and guaranteed safely under lets the cost, the technology, the time achieve the highest benefit goal of for this research. This research is aims at choice and the foundation pile location the plan design stage grounding law after the heavy experiment the benefit analysis to approaches for the research, and take new board special zone bridge peak building foundation engineering as range of study. In the plan design stage, the labor method choice has the close relation directly with the project cost, has the current price on market except the material itself especially, changes and so on technology, machines and tools, personnel, time interval form direct or street's influence, of machinery equipment regarding various types foundation pile project use in the market share, the construction feasibility, the technical personnel, the time and the method c
    Appears in Collections:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明