English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94274/94274 (100%)
Visitors : 82858484      Online Users : 1571
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 72(6.05%)
    Items With Fulltext: 1191(100.00%)

    Download counts of the item
    Download times greater than 0: 1191(100.00%)
    Download times greater than 100: 1143(95.97%)
    Total Bitstream Download Counts: 811355(1.42%)

    Last Update: 2026-07-22 18:19

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 431-440 of 1191. (120 Page(s) Totally)
    << < 39 40 41 42 43 44 45 46 47 48 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2015-01-01 Pricing and shelf space decisions with non-symmetric market demand 沈國基; Wang, Shih-Yen; Sheen, Gwo-Ji; Yeh, Yingchieh
    2015-01-01 Pricing and shelf space decisions with non-symmetric market demand 葉英傑; Wang, Shih-Yen; Sheen, Gwo-Ji; Yeh, Yingchieh
    2015-01-01 Trade-in strategy for a durable goods firm with recovery cost 陳振明; Chen, Jen-Ming; Hsu, Yu-Ting
    2014-11-25 Maintenance outsourcing coordination with risk-averse contractors 曾富祥; Tseng, Fu-Shiang; Yeh, Yingchieh
    2014-11-25 Maintenance outsourcing coordination with risk-averse contractors 葉英傑; Tseng, Fu-Shiang; Yeh, Yingchieh
    2014-07-28 以ERP為基準之單一產品碳足跡計算之概念性架構發展-以幫浦製造流程為例;Developing an ERP-based Conceptual Framework for Single Product Carbon Footprint Calculation-A Case Study of the Pump Production Process. 楊亞臻; Yang,Ya-Chen
    2014-07-28 平行機台排程問題下考量工單釋放時間與機台適合度之最小化總完工時間;Identical Parallel Machine Scheduling Problem with Release Dates and Machine Eligibility Restriction to Minimize Total Completion Time 蔡承益; Tsai,Cheng-I
    2014-07-28 考量平行機台之彈性維護週期求極小化總完工時間排程問題;Parallel Machine Scheduling with Flexible Maintenance Activity Periods for Minimizing Total Completion Time 李彥漢; Li,Yen-han
    2014-07-28 自行車共享系統中單一車輛單一造訪之靜態補貨問題;Static Rebalancing Problem with Single Vehicle and Single Visit for Bike Sharing Systems 廖奕醒; Liao,Yi-Xing
    2014-07-28 利用分枝界限法求具有機台可用時間限制與工作可分割特性之平行機台排程問題;A Branch and Bound Algorithm for Parallel Machine Scheduling Problem with Machine Availability and Job Preemption Constraint 吳蘆恩; Wu,Lu-En

    显示项目431-440 / 1191. (共120页)
    << < 39 40 41 42 43 44 45 46 47 48 > >>
    每页显示[10|25|50]项目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明