English |
正體中文
|
简体中文
|
Items with full text/Total items : 81570/81570 (100%)
Visitors : 49906662 Online Users : 2598
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
Scope
All of NCUIR
School of Management at National Central University
Graduate Institute of Industrial Management
--Research Project
Tips:
please add "double quotation mark" for query phrases to get precise results
please goto advance search for comprehansive author search
Adv. Search
Home
‧
Login
‧
Upload
‧
Help
‧
About
‧
Administer
NCUIR
>
School of Management at National Central University
>
Graduate Institute of Industrial Management
>
Research Project
>
Browse By Title
Browse By Date
Browse By Authors
Loading...
Siblings
Electronic Thesis & Dissertation
[
762
/762]
journal & Dissertation
[
77
/77]
retired tests
[
179
/179]
Collection Statistics
Item counts issued in 3 years: 4(4.17%)
Items With Fulltext: 96(100.00%)
Download counts of the item
Download times greater than 0: 96(100.00%)
Download times greater than 100: 94(97.92%)
Total Bitstream Download Counts: 42983(6.72%)
Last Update: 2025-07-16 18:31
Top Upload
Loading...
Top Download
Loading...
Recent Submissions
發展數據驅動AI賦能之預測性分析於異常診斷、設備維護及運營預測;Dev...
延伸NSGA-II方法以求解具平行批次處理與物料分派之極小化Makes...
發展數據驅動AI賦能之預測性分析於異常診斷、設備維護及運營預測;Dev...
以NSGA-II方法求解具批次與物料消耗限制之雙目標彈性零工式排程問題...
以極小化Makespan與Tardy stage-outs雙目標之零工...
機械設備製造廠之加工位置佈置與排程控制問題的探討;A Study on...
發展數據驅動之異常診斷與預測性維護策略—以塗佈機鍍膜製程為例;Deve...
類Kiva揀貨系統之各種作業管理、決策與控制問題的探討(III);A ...
具機台合適度決定與時間窗口限制之平行批次處理問題;Parallel B...
類Kiva揀貨系統之各種作業管理、決策與控制問題的探討(II);A S...
Jump to a point in the index:
(Choose year)
2025
2024
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1985
1980
1975
1970
1960
1950
(Choose month)
January
February
March
April
May
June
July
August
September
October
November
December
Or type in a year:
Ordering With Most Recent First
Show Oldest First
Showing items 51-75 of 96. (4 Page(s) Totally)
<<
<
1
2
3
4
>
>>
View [
10
|
25
|
50
] records per page
Date
Title
Authors
2010-07-01
TFT-LCD廠之Bay內的設施佈置與自動化物料搬運系統之派送控制的研究;A Study on the Layout Problem and the Automated Material Handling System's Dispatching Control Within a Bay of a TFT-LCD Plant
何應欽
2010-07-01
在營收分享合約下的通路協調---收費結構, 競爭以及均衡分析;On Channel Coordination under Revenue Sharing Contract---Fee Structure, Competition, and Equilibrium Analysis
陳振明
2010-07-01
運輸規模經濟對多階層配銷物流策略之影響; The Impact of Transportation Economies of Scale on the Logistics Decision in Multi-Echelon Distribution System
沈國基
2008-09-01
運用數學規劃、圖形、以及啟發式演算法來規劃廠房設施;Facility Layout Planning Utilizing Math Programming, Graphs, and Heuristic Algorithms
王啟泰
2008-09-01
發展連續性概似模型以解決在運輸成本具折扣下之多階層配銷系統設計與存貨補充策略;Continuous Approximation Models for Solving Multi-Echelon Distribution System Design and Inventory Replenishment Policy under Transportation Cost Discounts
沈國基
2008-09-01
一產品設計協同平台之分析架構;A Framework for Developing the Collaborative Product Design Platform
高信培
2008-07-01
半導體晶圓廠的設施佈置問題研究; A Study on Facility Layout Problems of Semiconductor Fabs
何應欽
2008-07-01
在寄賣與營收分享合約下發展產銷通路之利潤最大化模式; Developing Profit-Maximization Models for a Manufacturer-Retailer Channel under Consignment and Revenue-Sharing Contract
陳振明
2008-07-01
發展一演化性產品開發的分析架構; Developing an Analytical Framework for the Evolutionary Product Development
高信培
2008-07-01
混種生產策略之裝配生產系統效能研究; On Performances of an Assembly-To-Order System with a Hybrid Production Planning Strategy
葉英傑
2007-07-01
半導體晶圓廠內Interbay與Intrabay自動化物料搬運系統之控制問題的探討; A Study on the Control Problems of Interbay and Intrabay Material Handling Systems in a Semiconductor Fab
何應欽
2007-07-01
通路合作下信用期與促銷補貼決策對訂價與進貨政策之影響; A Study on the Impact of Policies of Trade Credit and Cooperative Promotion Allowances on Supply Chain Coordination
沈國基
2007-07-01
發展利潤最大化模式以管理多品項多階層的配銷通路; Developing Profit-Maximization Models for Managing a Multi-Item Multi-Echelon Distribution Channel
陳振明
2007-07-01
購買成本與時間和數量相依下損耗性產品最佳定價和補貨週期; Optimal Pricing and Replenishment Cycle for a Deteriorating Item with Time and Quantity-Dependent Purchase Costs
葉英傑
2006-07-01
分區揀貨倉庫的規劃設計與揀貨作業之相關問題的探討; A Study on the Planning and Design of a Zone-Picking Warehouse and Its Order-Picking Problems
何應欽
2006-07-01
延遲付款條件下缺貨具部份補貨方式之退化性商品之訂價與進貨政策; Cooperative Pricing and Replenishment Policies for Deteriorating Items with Partial Backlogging under Permissible Delay in Payments
沈國基
2006-07-01
協同供應鏈可靠度評量之模擬分析; Reliability Simulation of the Collaborative Supply Chain
高信培
2006-07-01
在需求為價格與庫存量相依與後進先出政策下易損壞商品的協調定價與最佳庫存水準; Coordinated Pricing and Order-Up-To Level for a Perishable Item with Price and Stock-Dependent Demand under LIFO Policy
陳振明
2006-07-01
季節性商品之零售商定價與訂購決策; Retailing Pricing and Ordering Policies for Seasonal Products
葉英傑
2005-12-01
科技動態調查及技術創新調查之規劃推動
王丕承
2005-07-01
非常態及多特性實驗數據的分析研究(II); Analysis of Nonnormal and Multi-Response Experimental Data(II)
王丕承
2005-07-01
在具不同橫向走道數之揀貨倉庫的訂單批次化與揀貨路徑規劃問題的探討; A Study on the Order-Batching and Order-Picking Route Planning Problems in Warehouses with Different Numbers of Cross Aisles
何應欽
2005-07-01
模擬輸出之不完全批次效應; Incomplete Batch Effects in Simulation Output Analysis
葉英傑
2005-07-01
企業資源規劃系統協同生產銷售決策模式之發展; Developing an Add-In Decision Model for Collaborated Production and Sales Planning in Enterprise Resource Planning Systems
陳振明
2004-07-01
非常態及多特性實驗數據的分析研究(I); Analysis of Nonnormal and Multi-Response Experimental Data (I)
王丕承
Showing items 51-75 of 96. (4 Page(s) Totally)
<<
<
1
2
3
4
>
>>
View [
10
|
25
|
50
] records per page
::: Copyright National Central University. | 國立中央大學圖書館版權所有 |
收藏本站
|
設為首頁
| 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
隱私權政策聲明