中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42601038      Online Users : 1062
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 45(25.86%)
    Items With Fulltext: 174(100.00%)

    Download counts of the item
    Download times greater than 0: 174(100.00%)
    Download times greater than 100: 131(75.29%)
    Total Bitstream Download Counts: 98284(0.24%)

    Last Update: 2024-12-18 11:13

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 1-25 of 174. (7 Page(s) Totally)
    1 2 3 4 5 6 7 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2024-08-22 出流管制計畫管控精進作法之研究-以桃園市為例;A Study on Improving Outflow Control Plan and Proposal—Taking Taoyuan City as an Example 周玟安; CHOU, WEN-ANG
    2024-07-30 機電空調承商工程承攬獲利能力之研究 鄭尉罡; CHENG, WEI-KANG
    2024-07-29 行政法人工程採購制度優化之分析;mprovement of Construction Procurement System in Administrative Corporations 曹永成; Tsao, Yung-Cheng
    2024-07-26 大型建築工程影響聯合承攬團隊整合因子之研究;Study On Factors Affecting the Integration of Joint Ventures in Large Scale Construction Projects 林修銘; Lin, Hsiu-Ming
    2024-07-26 我國室內裝修爭議問題與解決方案之探討;Exploration of Issues and Solutions in Taiwan′s Interior Decoration Disputes 韓世鴻; han, shih-hung
    2024-07-26 設計階段模型沿用至施工階段之檢核機制與流程建構 黃琪婷; Huang, Chi-Ting
    2024-07-26 應用層級分析法(AHP)建立影響鋼構橋梁腐蝕性因子排序之研究 林信志; CHIH, LIN HSIN
    2024-07-15 鋼構廠放樣人員人力指派最佳化之研究;Optimization of Manpower Assignment for Layout Personnel in Steel Structure Factories 李嫻婷; lee, Hen-Ting
    2024-07-10 鐵路機構可歸責於司機員之行車事故事件原因分析 (以臺鐵公司為例);Analysis of the Causes of Train Accidents Attributable to Train Operators (A Case Study of the Taiwan Railway Corporation) 林育昶; Lin, Yu-Chang
    2024-07-09 最佳化決策模式分析營建工程品質管理人力指派最小成本之研究;Optimization towards Manpower Assignment for Quality Management in Construction Projects 胡椿祥; Hu, Chuen-Shiang
    2024-07-09 營造業施工機具租賃平臺之初步研究:以高空作業車為例;Preliminary research of the rental platform for Construction Machinery in the Construction Industry: A Case Study of Platform Aerial Work Vehicles 王櫳寬; Wang, Lung-Kuan
    2024-06-19 公共工程非常態施工時段監造責任之研究 -以二級品管為核心 駱明信; HSIN, LO MING
    2024-01-30 營造工程風險評估技術指引與捷運工程風險評估之比較分析–以某市捷運工程為例 吳重毅; WU, CHUNG-YI
    2024-01-26 區域停車場最佳月租金之研究–以混和型住宅區為例;A study on optimal monthly parking fees for regional parking lots at mixed residential areas 賴秉勳; Lai, Ping-Hsun
    2024-01-26 探討區域透天住宅成長因素與策略-以桃園市為例;A Study on the Factors and Strategies of Regional Townhouse Development – A Case Study of Taoyuan City 李彥勲; Lee, Yen-Hsun
    2024-01-26 運用支援向量機演算法預測營造業人才招募之研究;Predicting recruitment in the construction industry using Support Vector Machine 梁保祥; Liang, Pao-Hsiang
    2024-01-25 運用層級分析法排序營造廠開發客戶來源因子之研究;Developing and weighting influence factors for exploring potential customers in construction utilizing AHP 趙信豪; Chao, Hsin-Hao
    2024-01-25 鄰軌工程導入電子輔助設備對於異物入侵營運軌防護成效-以交通部鐵道局北部工程處 109年至111年間辦理標案為例 林哲逵; LIN, JHE-KUEI
    2023-08-16 從專案管理角度探討建置孕期照護 諮詢平台可行性之研究;A Study on the Feasibility of Establishing a Pregnancy Care Consultation Platform from the Perspective of Project Management 黃瑛絢; Huang, Ying-Hsuan
    2023-07-25 運用SOMCM群集演算法提供改善處理違章建築效率策略之研究;Enhancing efficiency of handling illegal constructions using SOM-based cluster merging algorithm 鄭乃愷; Cheng, Nai Kai
    2023-07-24 運用SOMCM群集演算法探索道路挖掘行政管理策略之研究;Exploring administrative management strategies for road excavation using SOM-based cluster merging algorithm 李孟恆; Li, Menf-Heng
    2023-07-24 預測營建剩餘土石方流向異常行為之研究 陳家暐; Chen, Chia-Wei
    2023-07-21 修繕工程工期增加常見原因及解決方式之研究;Research on Common Causes and Solutions for Duration Extension of Repair Projects 譚沛紋; Tan, Pei-Wen
    2023-07-21 營建工程施工履約中影響廠商利潤因素與提升對策之研究;A Study on Factors Affecting Contractor Profitability and Enhancement Strategies during the Performance of Construction Contracts 王虎山; Wnag, Hu-Shan
    2023-07-20 火力發電廠汽輪發電機基礎結構施工時程之改善研究 呂冠逸; Yi, Lu-Guan

    Showing items 1-25 of 174. (7 Page(s) Totally)
    1 2 3 4 5 6 7 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明