English  |  正體中文  |  简体中文  |  Items with full text/Total items : 81570/81570 (100%)
Visitors : 46868636      Online Users : 756
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [96/96]
    Electronic Thesis & Dissertation [762/762]
    retired tests [179/179]

    Collection Statistics

    Item counts issued in 3 years: 0(0.00%)
    Items With Fulltext: 77(100.00%)

    Download counts of the item
    Download times greater than 0: 77(100.00%)
    Download times greater than 100: 77(100.00%)
    Total Bitstream Download Counts: 50460(8.12%)

    Last Update: 2025-04-18 21:20


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 31-40 of 77. (8 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2007 Inter-firms collaboration of joint venture in IC foundry business Ku,Kuo-Cheng; Gurumurthy,Charan K.; Kao,Hsin-Pei
    2007 Joint pricing and replenishment decisions for deteriorating items with lot-size and time-dependent purchasing cost under credit period Tsao,Yu-Chung; Sheen,Gwo-Ji
    2007 Monitoring a process of exponentially distributed characteristics through minimizing the sum of the squared differences Kao,Shih-Chou; Ho,Chuanching
    2007 Optimal inventory model for items with imperfect quality and shortage backordering Wee,H. M.; Yu,Jonas; Chen,M. C.
    2007 Periodic pricing and replenishment policy for continuously decaying inventory with multivariate demand Chen,Jen-Ming; Chen,Liang-Tu
    2007 Scheduling machine-dependent jobs to minimize lateness on machines with identical speed under availability constraints Sheen,Gwo-Ji; Liao,Lu-Wen
    2007 Single-machine scheduling with multiple performance measures: Minimizing job-dependent earliness and tardiness subject to the number of tardy jobs Chen,Wei-Yang; Sheen,Gwo-Ji
    2007 Virtual inter-firm collaborative framework - An IC foundry merger/acquisition project Ku,Kuo-Cheng; Kao,Hsing-Pei; Gurumurthy,Charan K.
    2006 A comparison of two zone-visitation sequencing strategies in a distribution centre Ho,Ying-Chin; Chien,Shang-Pu
    2006 A simulation study on the performance of pickup-dispatching rules for multiple-load AGVs Ho,Ying-Chin; Liu,Hao-Cheng

    Showing items 31-40 of 77. (8 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明