中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41762679      線上人數 : 1545
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    研究計畫 [96/96]
    博碩士論文 [760/760]
    考古題 [176/176]

    類別統計

    近3年內發表的文件: 0(0.00%)
    含全文筆數: 77(100.00%)

    文件下載次數統計
    下載大於0次: 77(100.00%)
    下載大於100次: 77(100.00%)
    檔案下載總次數: 48098(8.17%)

    最後更新時間: 2024-11-24 12:41


    上傳排行

    資料載入中.....

    下載排行

    資料載入中.....

    RSS Feed RSS Feed
    跳至:
    或輸入年份:
    由新到舊排序 由最舊的開始

    顯示項目1-10 / 77. (共8頁)
    1 2 3 4 5 6 7 8 > >>
    每頁顯示[10|25|50]項目

    日期題名作者
    2011 A concurrent solution for intra-cell flow path layouts and I/O point locations of cells in a cellular manufacturing system Ho,YC; Liao,TW
    2011 An integrated fuzzy TOPSIS and MCGP approach to supplier selection in supply chain management Liao,CN; Kao,HP
    2011 Equilibrium analysis and Pareto improvement of a supply chain under revenue sharing contract with consignment and slotting allowances Chen,JM; Cheng,HL; Chien,MC
    2011 Fuzzy analytical hierarchy process and multi-segment goal programming applied to new product segmented under price strategy Liao,CN
    2011 On channel coordination through revenue-sharing contracts with price and shelf-space dependent demand Chen,JM; Cheng,HL; Chien,MC
    2011 On channel coordination under price-dependent revenue-sharing: can eBay's fee structure coordinate the channel? Chen,JM; Cheng,HL; Lin,IC
    2011 The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system Lin,YH; Chen,JM; Chen,YC
    2010 Supplier selection model using Taguchi loss function, analytical hierarchy process and multi-choice goal programming Liao,CN; Kao,HP
    2009 A concurrent function deployment-based and concurrent engineering-based product development method for original design manufacturing companies Ho,YC; Lin,CH
    2009 An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length Wang,PC; Lin,YH; Chen,YC; Chen,JM

    顯示項目1-10 / 77. (共8頁)
    1 2 3 4 5 6 7 8 > >>
    每頁顯示[10|25|50]項目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明