中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 78728/78728 (100%)
造访人次 : 34455402      在线人数 : 759
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    研究計畫 [94/94]
    博碩士論文 [732/732]
    考古題 [173/173]

    类别统计

    近3年内发表的文件: 0(0.00%)
    含全文笔数: 77(100.00%)

    文件下载次数统计
    下载大于0次: 77(100.00%)
    下载大于100次: 77(100.00%)
    全文下载总次数: 49787(8.10%)

    最后更新时间: 2024-04-19 05:18


    上传排行

    数据加载中.....

    下载排行

    数据加载中.....

    RSS Feed RSS Feed
    跳至:
    或输入年份:
    由新到旧排序 由最旧的开始

    显示项目1-25 / 77. (共4页)
    1 2 3 4 > >>
    每页显示[10|25|50]项目

    日期题名作者
    2011 A concurrent solution for intra-cell flow path layouts and I/O point locations of cells in a cellular manufacturing system Ho,YC; Liao,TW
    2011 An integrated fuzzy TOPSIS and MCGP approach to supplier selection in supply chain management Liao,CN; Kao,HP
    2011 Equilibrium analysis and Pareto improvement of a supply chain under revenue sharing contract with consignment and slotting allowances Chen,JM; Cheng,HL; Chien,MC
    2011 Fuzzy analytical hierarchy process and multi-segment goal programming applied to new product segmented under price strategy Liao,CN
    2011 On channel coordination through revenue-sharing contracts with price and shelf-space dependent demand Chen,JM; Cheng,HL; Chien,MC
    2011 On channel coordination under price-dependent revenue-sharing: can eBay's fee structure coordinate the channel? Chen,JM; Cheng,HL; Lin,IC
    2011 The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system Lin,YH; Chen,JM; Chen,YC
    2010 Supplier selection model using Taguchi loss function, analytical hierarchy process and multi-choice goal programming Liao,CN; Kao,HP
    2009 A concurrent function deployment-based and concurrent engineering-based product development method for original design manufacturing companies Ho,YC; Lin,CH
    2009 An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length Wang,PC; Lin,YH; Chen,YC; Chen,JM
    2009 Maintenance Outsourcing Contracts for New Technology Adoptions Tseng,FS; Tang,K; Moskowitz,H; Plante,R
    2009 The performance of load-selection rules and pickup-dispatching rules for multiple-load AGVs Ho,YC; Liu,HC
    2009 Zone design and control for vehicle collision prevention and load balancing in a zone control AGV system Ho,YC; Liao,TW
    2008 A knowledge management system for series-parallel availability optimization and design Juang,Ying-Shen; Lin,Shui-Shun; Kao,Hsing-Pei
    2008 An empirical study on knowledge integration, technology innovation and experimental practice Hung,Hsu-Fang; Kao,Hsing-Pei; Chu,Yee-Yeen
    2008 An integrated information system for product design planning Hung,Hsu-Fang; Kao,Hsing-Pei; Juang,Ying-Shen
    2008 Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments Tsao,Yu-Chung; Sheen,Gwo-Ji
    2008 Ontology-based knowledge management for joint venture projects Ku,Kuo-Cheng; Wensley,Anthony; Kao,Hsing-Pei
    2008 Optimal parallel machines scheduling with machine availability and eligibility constraints Sheen,Gwo-Ji; Liao,Lu-Wen; Lin,Cheng-Feng
    2008 Order-batching methods for an order-picking warehouse with two cross aisles Ho,Ying-Chin; Su,Teng-Sheng; Shi,Zhi-Bin
    2008 Parallel machine scheduling with machine availability and eligibility constraints Liao,Lu-Wen; Sheen,Gwo-Ji
    2008 Reply to "Comment on 'Optimizing supply chain collaboration based on joint replenishment and channel coordination Chen,Jen-Ming; Chen,Tsung-Hui
    2008 Simultaneous determination of view selection and update policy with stochastic query and response time constraints Liu,Yu-Chin; Hsu,Ping-Yu; Sheen,Gwo-Ji; Ku,Steve; Chang,Kai-Wen
    2007 A branch and bound algorithm for the one-machine scheduling problem,with minimum and maximum time lags Sheen,Gwo-Ji; Liao,Lu-Wen
    2007 A collaborative model for capacity expansion of the IC foundry industry Ku,Kuo-Cheng; Kao,Hsing-Pei; Gurumurthy,Charan K.

    显示项目1-25 / 77. (共4页)
    1 2 3 4 > >>
    每页显示[10|25|50]项目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明