English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 78852/78852 (100%)
造訪人次 : 37999063      線上人數 : 812
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/59107


    題名: 電弧爐還原碴應用於控制性低強度材料及其安定化成效評估研究
    作者: 曾仕文;Shih-wen,Tseng
    貢獻者: 土木工程學系
    關鍵詞: CLSM;安定化;膨脹率;電弧爐還原碴;CLSM;Electric-arc furnace reductive slag;Expansion;Stabilization
    日期: 2013-01-03
    上傳時間: 2013-03-25 15:46:39 (UTC+8)
    出版者: 國立中央大學
    摘要: 電弧爐還原碴為電弧爐煉鋼之製程下,所產生之副產物,若能將其當作細粒料之使用,不僅能更有效地增加還原碴之使用量,同時減少因堆置過多而造成環境的衝擊,達到雙重效益。  本研究係以水泥搭配爐石粉為主要膠結材,搭配以破碎分選後之爐碴粒料當作粗細粒料,利用兩個不同廠區之還原碴取代部分細粒料(5 %、10 %、15 %),製成控制性低強度回填材料(CLSM),進行CLSM之管流度、坍流度、抗壓強度試驗並探討其膨脹潛能。另一方面,將還原碴各別進行普通、加速安定化處理,依據不同的安定化處理方式,觀察其還原碴之膨脹潛能,評估安定化處理之成效。  試驗結果顯示,建議還原碴以10 %取代部分細粒料應用於CLSM中,其工作性、凝結時間與28天抗壓強度皆能符合國內各施工規範要求,但隨著還原碴取代量增多,會造成凝結時間延長及早期強度發展不足;而CLSM膨脹率皆在0.08 %以下,所以用於回填工程時應不致造成膨脹問題。安定化成效方面,普通安定化處理之齡期需至少90天以上,以確保還原碴內之膨脹因子能有效降低;而加速安定化處理(80℃)在15天以上,可有效抑制還原碴之膨脹。Electric arc furnace reductive slag is the byproduct formed in the electric arc furnace steelmaking process. This study aims at using the slag as fine aggregate in making controlled low strength material (CLSM). This would help increasing utilization of reductive slag, and reducing the amount of stockpiling which is likely to cause environmental concerns. In this study, portland cement and blast furnace slag are used as cementing materials and crushed and sieved slag as coarse and fine aggregates to make CLSM. Reductive slag produced from two different plants are used to replace part of the fine aggregate (5 %, 10 %, 15 %) in proportioning CLSM. Standard test methods for CLSM including pipe flow, slump flow, compressive strength, and swelling potential were conducted to evaluate the effectiveness of using reductive slag in making CLSM. Test results indicated that replacing 10% of the fine aggregate with reductive slag would produce CLSM that meets the consistency, setting time, and 28-day compressive strength specifications for CLSM. Increasing the replacement level of reductive slag tends to increase the setting time and decrease the early strength. An expansion of 0.08% was found for the CLSM made with reductive slag and is judged to be acceptable for backfilling works without causing expansion problems.   Also, to ensure that reductive slag does not cause excessive swelling, two stabilization processes were evaluated in this study. These include water-soaking under ambient temperature and at 80°C. It was found that water-soaking at elevated temperature is more effective in stabilizing reductive slag from swelling. In general, it takes 15 days for reductive slag to be stabilized under 80°C water-soaking, while a minimum of 90 days is needed for stabilization of reductive slag at ambient temperature.
    顯示於類別:[土木工程研究所] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML1225檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明