中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/73079
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42594619      Online Users : 1160
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/73079


    Title: 市區道路材料試(檢)驗之盲樣測試機制探討—以臺北市市區道路之路平專案為例;Developing a blind sample test for pavement material testing – A case study for Taipei urban pavement.
    Authors: 楊朝福;Yang, Chau-Fu
    Contributors: 營建管理研究所在職專班
    Keywords: 盲樣測試;市區道路鋪面;品質控制;材料供應商;blind sample test;urban pavement;quality control;material suppliers
    Date: 2017-01-24
    Issue Date: 2017-05-05 17:43:42 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 由私營部門自行取得道路鋪面的試驗結果,對汽機車駕駛而言是不利的,因為他們可以對這些試驗結果進行操緃,便能將不符合規範的材料用作道路鋪面。本研究目的是從政府的角度上研擬一套盲樣測試的機制,以檢測出被私營部門所影響而進行的操緃結果。
    本研究對以往文獻進行了全面的回顧,以重新審視目前的機制。在研擬這個針對道路鋪面材料試(檢)驗所特製的檢測機制時,對於實際進行試驗的實驗室和待測試的樣品都是採取隨機性地進行選派,因此在實驗室和待測樣品之間會產生數百萬種的組合,所以對於那些想操緃測試結果的人而言是無法預測的。
    以臺北市13家主要材料供應商的測試樣品,該機制的評估顯示,結果很符合實際的情況,且在實際樣品和測試樣品之間的偏差值收斂至小於13.43%。研究結果還顯現政府不僅可節省預算而且道路鋪面的品質亦到了改善。
    ;It is harmful for motorists as the pavement test results obtained by private sectors can be manipulated so that disqualified materials would be used for pavement. The study objective is to develop a blind sample test mechanism from the government viewpoint to detect manipulated results yielded by private sectors. A comprehensive literature review was carried out to re-review the current mechanism. A customized mechanism for pavement material testing was developed by adopting randomly selection of laboratories and test samples. Millions of combinations were created and are literally unpredictable for those who may try to manipulate test results. Using test samples from 13 major material suppliers in Taipei area, an evaluation for the mechanism shows the findings that are fitting the actual situation more. The deviation converges between the actual and test samples toward less than 13.43%. The findings also suggest the government that savings of budget and quality of pavement be both improved.
    Appears in Collections:[Executive Master of Construction Engineering and Management] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML470View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明