中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/76590
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41643621      Online Users : 1211
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/76590


    Title: 航空發動機維修廠備料流程改善之研究
    Authors: 鄒相強;Chou, Hsiang-Chiang
    Contributors: 工業管理研究所
    Keywords: 航空發動機;備料流程;流程改善;Aviation Engine;Marshaling process improvement
    Date: 2018-08-22
    Issue Date: 2018-08-31 11:29:03 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 現代發動機維修市場競爭激烈,航空公司對發動機維修交期之長短是考慮委託修理的重要因素。A公司發動機維修廠為本文之研究標的,個案維修廠欲提升競爭力,設定縮短發動機修理天數及降低工時的目標,本研究試從發動機維修廠的角度研究如何以流程改善提升效率之方式,縮短發動機進廠修理時間,降低工時,增進維修廠的競爭力,以達到與客戶雙贏的目的。
    經研究分析,個案工廠在發動機修理流程中,造成出廠時間延誤最大的問題在於備料流程,故本研究主要針對備料流程作分析改善,利用柏拉圖、腦力激盪、魚骨圖、專家訪談等手法找出組織及流程之浪費,對於組織及流程加以改善與驗證並持續改善,對於改善行動可能附帶的風險亦加以辨識與評估,並持續監控其風險及成效。
    個案工廠透過組織改組、建立配料系統等手段改善備料流程減少浪費,經實際驗證,達成縮短發動機修理天數及節省備料工時的目標。
    ;The modern engine maintenance market is highly competitive, reducing the turnaround time of in-house repairs of the aircraft engine is an important factor for competitive MRO (Maintenance、Repair and Operations). The engine shop of A company is the subject of this paper,the engine shop wants to improve its competitiveness, set the goals of shortening the turnaround time of engine repair and reducing the working hours.
    This study tries to improve the efficiency of the process from the perspective of the engine repair shop and achieving a win-win situation with customers. According to the research and analysis, the engine parts preparation process is the major problem result in engine delivery delay; therefore, this study mainly analyzes the engine parts preparation process.
    This research using tools of Plato, brainstorming, fishbone diagram, expert interviews to identify waste of production processes, then improved and validated improvement, also identify and assess the risks associated with improving actions, and continuously monitor their risks and outcomes.
    The engine shop improved the engine parts preparation process to reduce waste by reorganization and establishing an engine parts marshaling system. After actual verification, the goals of shortening the number of engine repair days and saving the work-hours were achieved.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML320View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明