中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/81785
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 41665582      在线人数 : 1437
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/81785


    题名: 以風險分配觀點解決工程履約爭議之研究
    作者: 徐克銘;Hsu, Ko-Ming
    贡献者: 營建管理研究所
    关键词: 工程爭議;風險管理;風險分配;成本;價金;經濟理性;Construction Disputes;Risk Management;Risk Allocation;Cost;Price;Economic Rationality
    日期: 2019-07-17
    上传时间: 2019-09-03 17:01:54 (UTC+8)
    出版者: 國立中央大學
    摘要: 契約約文的解釋及適用長期以來支配著工程履約爭議處理模式的現象,並未能真正建立契約兩造間共同信賴的標準,反而因為其不可預測性而變相鼓助長了爭議的發生。本文之作即是嚐試從訂約時即應考慮的風險管理為出發點,建立風險承擔與成本的關聯性,進而從既存爭議的契約價格結構反推締約時的風險分配應然的結論,以解決工程履約爭議。在論理上除了尋找如此解決爭議的適法性基礎外,並以案例分析方式得到實踐上的支持,嗣再透過問卷調查及專家學者深度訪談等研究方法,進一步驗證研究成果的正確及可行。
    本研究之成果,在短期內可提供具體已發生之個案在爭議處理時可能遵循的解決方式。透過案例數量的逐步累積後,彰顯合理的契約義務分配及價格結構關聯性,一方面提昇工程履約爭議解決的合理性,另一方面也建立較客觀的爭議處理標準,使得工程爭議的解決相對客觀而具有可預測性,期望在中、長期達成一定程度息爭止訟的成效。
    ;Based on the risk allocation concept, the study objective is to identify which party needs to bear the liability under the following two circumstances: (1) force majeure clause and (2) personnel injury/death and other collateral damage. The methodology lies in a comprehensive literature review, comparability among past verdicts, and empirical cases. The findings involve four aspects: in Type I, risk-bearing is considered as a factor for cost decision and risk allocation may be decided by contractual provisions; in Type II, the parties to whom the risk is allocated may be reimbursed from the third party and therefore cannot make any claim against the other party; in Type III, the contractor should assume the risk according to the contract regardless of contractual provisions on the assumption of risk as a result of the contractor’s negligence; in Type IV, the allocated liability simply comes from the mere perspective of (1) the benefit allocation resulted from risk avoidance, (2) dominate position of risk control, (3) general development of the whole industry and maximization of the overall economic benefit.
    The comprehensive literature review brings out comparability among past verdicts and targeted investigation and then yields suggestions for conducting the expert survey based on the questionnaire, resulting in 8 stems with 5-scale Likert measurement to develop the proposed concept. There are 50 effective returns that establish 4 types of resolutions for disputes caused by construction projects in Taiwan. The findings demonstrate the guideline for practitioners to deal with possible disputes caused by construction projects.
    显示于类别:[營建管理研究所 ] 博碩士論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML254检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明