中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/84856
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 83776/83776 (100%)
Visitors : 59652216      Online Users : 752
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/84856


    Title: 施工廠商績效評估導入履約情形計分辦法之個案分析探討;Case Analysis and Discussion on the Implementation of Performance scoring Method for Construction Manufacturer Performance Evaluation
    Authors: 劉正堯;Liu, Yao-Cheng
    Contributors: 土木工程學系
    Keywords: 公共工程施工廠商履約情形計分;履約績效;履約情形計分;Scoring for the fulfilment efficiency of public construction compannies;Fulfilment efficiency;Fulfilment efficiency score
    Date: 2021-01-27
    Issue Date: 2021-03-18 16:31:36 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 台灣為經濟發展中國家,近年來公共建設蓬勃興起,而為求公共建設品質,工程會於103年10月27日建立「公共工程施工廠商履約情形計分制度」,藉此使廠商重視履約過程及施工品質,藉以提升履約績效的成績。
    本研究探討公共工程施工廠商?約情形計分沿革,及比較各版修正差異,並以施工廠商績效評估導入履約情形計分辦法之個案分析探討,藉由工程案例將工程分為公園及公共設施類、新建建築工程類去做比較優異。並檢討履約情形計分辦法中評分不合理之處的提出探討與建議,期望對未來的工程導入履約計分有所精進。
    ;Taiwan is an economically developing country, and public construction has flourished in recent years. In order to achieve the quality of public construction, the Engineering Association established a system name by "Public Construction Manufacturers’Performance Scoring System" on October 27, 2014, to make manufacturers pay attention to the process of contract performance. And construction quality to improve the performance of contract performance.
    This study explores the history of the scoring of the performance of public construction companies, and compares the differences between versions, and introduces the performance evaluation of the construction companies into the case analysis of the scoring method of the performance. The projects are divided into parks and public facilities based on engineering cases. , New construction projects are relatively excellent. And review the scoring method of the performance situation and put forward discussions and suggestions for unreasonable scoring, and improve the introduction of performance scoring in future projects.
    Appears in Collections:[Graduate Institute of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML208View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明